NEW PROJECTS ADVERTISED SINCE Jul 22 2014 7:09PM
Multi-RAE Pro and Cradle Irvine, CA 07/25/14
11:00 AM
Fitness Equipment Functional Movement Test Kits Irvine, CA 07/29/14
11:00 AM
On-Call CCTV Inspection Sacramento , CA 07/30/14
2:00 PM
Frederick Avenue and Olive Avenue Resurfacing (West Ripon Road to North End) Ripton, CA 07/31/14
1:30 PM
Lemon Avenue and Orange Avenue Resurfacing (Harrold Avenue to Sutliff Avenue; Santa Fe Road to Sutliff Avenue) Escalon, CA 07/31/14
1:30 PM
Lower Sacramento Road Improvements (Eight Mile Road to South of Harney Curve) Various Locations, CA 07/31/14
1:30 PM
Floor Care Services at Silver Creek Community Center Bakersfield, CA 07/31/14
2:00 PM
Provide On-Call Environmental Support Services for Various Capital Improvements Projects 2014-2017 Vacaville, CA 07/31/14
4:00 PM
STORM DRAIN PIPE LINING PROJECT Laguna Niguel, CA 08/01/14
2:00 PM
FY15 Vegetation Road Clearance Project Santa Barbara, CA 08/04/14
2:00 PM
FFIP Sleepy Hollow Pipeline Replacement Project Sleepy Hollow, CA 08/05/14
10:00 AM
King Street Improvements Project - Phase 1 La Mesa, CA 08/05/14
11:00 AM
Station Modifications for UTDC Light Rail Vehicles Re-Bid Sacramento , CA 08/06/14
2:00 PM
2011 TDA Bus Pad Upgrade Redlands, CA 08/07/14
11:00 AM
Enhance Airfield Drainage (Phase 2) BOULDER CITY, NV 08/07/14
1:00 PM
Putah Creek Parkway Davis, CA 08/07/14
2:00 PM
DMV Riverside Roof Replacement Riverside, CA 08/07/14
2:30 PM
(Subcontractor Prequalification) Main Operating Rooms HVAC Upgrades La Jolla, CA 08/08/14
1:00 PM
Topaz Lane Bridge Maintenance Project Topaz, CA 08/11/14
3:00 PM
2014 Street Resurfacing Project - City Project No. 2014-01 Livermore, CA 08/12/14
2:30 PM
Civic Center Playground Shade Structure Replacement Palm Desert, CA 08/13/14
2:00 PM
Kennedy High School Health Clinic Richmond, CA 08/13/14
2:00 PM
Freisman Park City Project 2007-2066 Livermore, CA 08/13/14
2:30 PM
RTC Administration Building - Safety and Security Upgrades Las Vegas, CA 08/13/14
4:00 PM
13-6796: CHESTNUT AVE. CLASS II BIKEWAY; STANDARD AVE TO GRAND AVE; CM-5063(148) 14-6813: ALLEY IMPROVEMENT-FY 13/14 14-6803: CHESTNUT AVE REHABILITATION; BROADWAY TO MAIN SANTA ANA, CA 08/14/14
2:00 PM
City of Perris 2014 Pavement Rehabilitation & Flood Benefit Zone Rehabilitation Project Perris, CA 08/14/14
2:00 PM
COGENERATION ENGINE NO. 1 OVERHAUL AND SOURCE TEST Stockton, CA 08/14/14
2:00 PM
DeRicco Lobby Project Stockton, CA 08/14/14
2:00 PM
D Street Roadway Enhancements Phase 6 Railroad Track to 10th Street Perris, CA 08/18/14
2:00 PM
Dictionary Hill Pump Station Motor Control Center Upgrade, WO 4213 Spring Valley, CA 08/19/14
10:00 AM
Vera Johnson Manor A (AMP 313) Windows Upgrades 1200 Harris Avenue Las Vegas, NV. 89101 Las Vegas, NV 08/20/14
10:00 AM
Corporation Yard Expansion Phase 2 - Materials Bin Storage Facility Project (WFC003) Elk Grove, CA 08/21/14
2:00 PM
Sewer Annexation 459A & 459C Porterville , CA 08/21/14
2:00 PM
Sixth Street Improvements, LED Trail Lighting, LED Upgrades, and Fiber Optic Repair Gilroy, CA 08/21/14
2:00 PM
Underground District No. 57 Phase 2 Anaheim, CA 08/21/14
2:00 PM
Spencer Street, Windmill Lane to Warm Springs Road & Serene Avenue, Spencer Street to Eastern Avenue Las Vegas, NV 08/21/14
2:15 PM
First Street Water Line Replacement Project Simi Valley, CA 08/21/14
2:30 PM
Exterior Lighting Atascadero, CA 08/21/14
3:00 PM
(Prequalified Contractors) Old Town Phase I Demolition Berkeley, CA 08/25/14
3:00 PM
SR 89 Mousehole Multi-Use Path and UPRR Undercrossing Truckee, CA 08/28/14
2:00 PM
2300 Delaware Elevators No. 72 and 73 Modernization Santa Cruz, CO 09/09/14
3:00 PM
NEW PLANS/SPECS ADDED SINCE Jul 22 2014 7:09PM
Lake Tahoe Blvd Enhancement Project South Lake Tahoe, CA 07/28/14
2:00 PM
Northern California Diving Services Various Locations, CA 07/28/14
2:00 PM
Fitness Equipment Functional Movement Test Kits Irvine, CA 07/29/14
11:00 AM
VIDA Site Administration Improvements Vista, CA 07/30/14
10:00 AM
2014 Sidewalk Removal and Replacement Project San Carlos, CA 07/31/14
10:00 AM
Frederick Avenue and Olive Avenue Resurfacing (West Ripon Road to North End) Ripton, CA 07/31/14
1:30 PM
Lemon Avenue and Orange Avenue Resurfacing (Harrold Avenue to Sutliff Avenue; Santa Fe Road to Sutliff Avenue) Escalon, CA 07/31/14
1:30 PM
Lower Sacramento Road Improvements (Eight Mile Road to South of Harney Curve) Various Locations, CA 07/31/14
1:30 PM
2014 Residential Street Resurfacing Project Citrus Heights, CA 07/31/14
2:00 PM
Floor Care Services at Silver Creek Community Center Bakersfield, CA 07/31/14
2:00 PM
Orange Children & Parents Together Wrought Iron Fence Installation Project Orange, CA 07/31/14
2:00 PM
Provide On-Call Environmental Support Services for Various Capital Improvements Projects 2014-2017 Vacaville, CA 07/31/14
4:00 PM
STORM DRAIN PIPE LINING PROJECT Laguna Niguel, CA 08/01/14
2:00 PM
FY15 Vegetation Road Clearance Project Santa Barbara, CA 08/04/14
2:00 PM
Linda Mar Generator Replacement Project Pacifica, CA 08/04/14
2:00 PM
FFIP Sleepy Hollow Pipeline Replacement Project Sleepy Hollow, CA 08/05/14
10:00 AM
Grading and Check Dam Construction Along 16th Street at Tennessee Street Yuciapa, CA 08/05/14
11:00 AM
King Street Improvements Project - Phase 1 La Mesa, CA 08/05/14
11:00 AM
Place HMA, Repair Failed Areas, and Construct Guard Railing Various Locations, CA 08/06/14
2:00 PM
Castle Airport Electrical Vault Building and Electrical Castle Improvements Project Atwater, CA 08/07/14
10:00 AM
SAN FERNANDO ELEMENTARY SCHOOL CA 08/07/14
10:00 AM
2011 TDA Bus Pad Upgrade Redlands, CA 08/07/14
11:00 AM
Enhance Airfield Drainage (Phase 2) BOULDER CITY, NV 08/07/14
1:00 PM
AHF & BHF INDICATOR WELL TELEMETRY, MIDDLEFIELD RESERVOIR ISOLATION VALVE AUTOMATION, AND PATTERSON RESERVOIR VALVE ACTUATORS, Job 21009, 21058, 21102 Fremont, CA 08/07/14
2:00 PM
Putah Creek Parkway Davis, CA 08/07/14
2:00 PM
DMV Riverside Roof Replacement Riverside, CA 08/07/14
2:30 PM
Castle Airport Hangar Improvements Project Atwater, CA 08/07/14
3:00 PM
(Subcontractor Prequalification) Main Operating Rooms HVAC Upgrades La Jolla, CA 08/08/14
1:00 PM
Topaz Lane Bridge Maintenance Project Topaz, CA 08/11/14
3:00 PM
2014 Street Resurfacing Project - City Project No. 2014-01 Livermore, CA 08/12/14
2:30 PM
Civic Center Playground Shade Structure Replacement Palm Desert, CA 08/13/14
2:00 PM
RTC Administration Building - Safety and Security Upgrades Las Vegas, CA 08/13/14
4:00 PM
City of Perris 2014 Pavement Rehabilitation & Flood Benefit Zone Rehabilitation Project Perris, CA 08/14/14
2:00 PM
COGENERATION ENGINE NO. 1 OVERHAUL AND SOURCE TEST Stockton, CA 08/14/14
2:00 PM
COMMERCIAL POOL SERVICE AT MULTIPLE POOL FACILITIES Stockton, CA 08/14/14
2:00 PM
DeRicco Lobby Project Stockton, CA 08/14/14
2:00 PM
Milsap Wetland Restoration Project Aptos, CA 08/14/14
4:00 PM
D Street Roadway Enhancements Phase 6 Railroad Track to 10th Street Perris, CA 08/18/14
2:00 PM
Dictionary Hill Pump Station Motor Control Center Upgrade, WO 4213 Spring Valley, CA 08/19/14
10:00 AM
2014 SLURRY SEAL PROJECT CARLSBAD, CA 08/19/14
2:00 PM
Vera Johnson Manor A (AMP 313) Windows Upgrades 1200 Harris Avenue Las Vegas, NV. 89101 Las Vegas, NV 08/20/14
10:00 AM
Corporation Yard Expansion Phase 2 - Materials Bin Storage Facility Project (WFC003) Elk Grove, CA 08/21/14
2:00 PM
Sewer Annexation 459A & 459C Porterville , CA 08/21/14
2:00 PM
Sixth Street Improvements, LED Trail Lighting, LED Upgrades, and Fiber Optic Repair Gilroy, CA 08/21/14
2:00 PM
Underground District No. 57 Phase 2 Anaheim, CA 08/21/14
2:00 PM
Spencer Street, Windmill Lane to Warm Springs Road & Serene Avenue, Spencer Street to Eastern Avenue Las Vegas, NV 08/21/14
2:15 PM
Exterior Lighting Atascadero, CA 08/21/14
3:00 PM
(Prequalified Contractors) Old Town Phase I Demolition Berkeley, CA 08/25/14
3:00 PM
SR 89 Mousehole Multi-Use Path and UPRR Undercrossing Truckee, CA 08/28/14
2:00 PM
2300 Delaware Elevators No. 72 and 73 Modernization Santa Cruz, CO 09/09/14
3:00 PM
NEW ADDENDA ADDED SINCE Jul 22 2014 7:09PM
SIEGFRIED & ROY PARK Las Vegas, NV 07/24/14
1:30 PM
Bare Non-Operated Rental Self Propelled Asphalt Equipment Various Locations, CA 07/24/14
2:15 PM
Moore Road Sewer Lincoln, CA 07/25/14
3:00 PM
Chassis Wash Bus Lift Replacement Project Riverside, CA 07/29/14
2:00 PM
North Avenue Bridge Preventative Maintenance Project Lompoc, CA 07/29/14
2:00 PM
TRANSIT CENTER PHASE II IMPROVEMENTS STORM DRAIN AND ROUGH GRADING PLANS Yucaipa, CA 07/29/14
2:00 PM
Welcome to Las Vegas Sign Parking Lot Improvements Las Vegas, NV 07/29/14
2:15 PM
Original Ranch Buildings - Hay Barn Restoration Santa Cruz, CA 07/29/14
3:00 PM
Furnish and Install Baseball Scoreboard at Morse High School San Diego , CA 07/30/14
1:00 PM
2012-2013 Wheelchair Ramp Installation/Improvement and Concrete Work at Various Locations Buena Park, CA 07/30/14
2:00 PM
Bayshore Bikeway Segment 4 Various Locations, CA 07/30/14
2:00 PM
General Contracting Services or Subcontractor Services TCMC Primary Care Physician Clinic Vista Vista, CA 07/30/14
3:00 PM
2014 Sidewalk Removal and Replacement Project San Carlos, CA 07/31/14
10:00 AM
2014 Residential Street Resurfacing Project Citrus Heights, CA 07/31/14
2:00 PM
Live Scan Systems Santa Ana, CA 07/31/14
4:00 PM
Place HMA, Repair Failed Areas, and Construct Guard Railing Various Locations, CA 08/06/14
2:00 PM
Castle Airport Electrical Vault Building and Electrical Castle Improvements Project Atwater, CA 08/07/14
10:00 AM
Gymnasium Maintenance and Repair Service Fremont, CA 08/07/14
2:00 PM
Demolition and Clearance at Lake 20 & 29, Parcel #12288 Upper Lake, CA 08/07/14
2:15 PM
Hesperian/ Springlake Railroad Crossing Improvements San Leandro, CA 08/07/14
3:00 PM
Los Osos Valley Road/US 101 Interchange Improvements Project, Contract No. 05-0H7304, Spec. No. 99821 San Luis Obispo, CA 08/12/14
2:00 PM
NEW PLANHOLDERS ADDED SINCE Jul 22 2014 7:09PM
2014 Summer Parking Lot/Road Repair at Riverside City College - REBID Riverside , CA 07/24/14
2:00 PM
BICYCLE AND PEDESTRIAN RELATED IMPROVEMENTS-BERNAL AVENUE (FOOTHILL RD. TO W. LAGOON RD.) SIDEWALK IMPROVEMENTS, PROJECT NO. 145043 City of Pleasanton, CA 07/24/14
2:00 PM
Elk Grove Landfill Final Cover Repairs and GCCS Improvement Plan Elk Grove, CA 07/24/14
2:30 PM
Atherton Tank Rehabilitation Project Novato, CA 07/24/14
3:00 PM
LMD 87-1 VARIABLE FREQUENCY DRIVE PUMP REPLACEMENT City of Poway, CA 07/24/14
3:00 PM
Pepper Avenue and Birch Avenue Widening City Project No. 130811 Pepper Avenue Sound Walls and Pepper Avenue Overlay City Project No. 000893 Rialto, CA 07/24/14
3:00 PM
Santa Barbara Airport Pavement Rehabilitation of Runway 15L-33R, Terminal Ramp, South GA Ramp, and Signature Ramp SANTA BARBARA, CA 07/24/14
3:00 PM
West Central Landfill Phase I Underdrain Pump Station Redding, CA 07/28/14
11:00 AM
Water Treatment Analysis and Supply Various Locations, CA 07/28/14
2:00 PM
Calico Ghost Town Regional Park Water Treatment System Project Yermo, CA 07/29/14
10:00 AM
Led Crosswalk Installation at Orr And Day Road and Whiteland Street Santa Fe Springs, CA 07/29/14
11:00 AM
Wilmington Avenue at El Segundo Boulevard, et al. West Carson and Willowbrook, CA 07/29/14
11:00 AM
Restoration and Painting of Talmadge Acorn Streetlights San Diego , CA 07/29/14
1:30 PM
Highland Way PM 0.38 Storm Damage Repair Project Los Gatos, CA 07/29/14
2:00 PM
Highland Way PM 3.24 & PM 3.63 Storm Damage Repair Project Los Gatos, CA 07/29/14
2:00 PM
Mussey Grade Road Improvements Ramona, CA 07/29/14
2:00 PM
Rose Ave./Collins St. Pedestrian Improvements Oxnard, CA 07/29/14
2:00 PM
Skylark Canyon Sewer Rehabilitation San Diego , CA 07/29/14
2:00 PM
TRANSIT CENTER PHASE II IMPROVEMENTS STORM DRAIN AND ROUGH GRADING PLANS Yucaipa, CA 07/29/14
2:00 PM
Minor B - Modify and upgrade Traffic Signals Various Locations, CA 07/29/14
2:15 PM
Lake Cachuma Marina Cafe Santa Barbara, CA 07/29/14
3:00 PM
Leanna Drive Creek Crossing Waterline Arroyo Grande, CA 07/29/14
3:00 PM
Alton Parkway Left Turn Lane at the Civic Center Irvine, CA 07/30/14
10:00 AM
Preece Street Storm Drain Replacement San Diego , CA 07/30/14
1:30 PM
2012-2013 Wheelchair Ramp Installation/Improvement and Concrete Work at Various Locations Buena Park, CA 07/30/14
2:00 PM
C1494F BLDG. R DOOR REPLACEMENT (LAC) Long Beach, CA 07/30/14
2:00 PM
CSA 70 Zones R2, R47, and CSA 59 Road Paving Project Various Locations, CA 07/30/14
2:00 PM
On-Call CCTV Inspection Sacramento , CA 07/30/14
2:00 PM
PACIFIC COAST HIGHWAY / DEL PRADO STREETSCAPE IMPROVEMENT PROJECT PHASE 2A Dana Point, CA 07/30/14
2:00 PM
Pinole Valley High School Hillside Stabilization Increment 1 and 2 Pinole, CA 07/30/14
2:00 PM
Rehabilitate Runway and Taxiway Lighting and Signage Stockton, CA 07/30/14
2:00 PM
Repair of Portland Cement Concrete Sidewalk, Curb, Gutter, Driveway and Minor Street Patching, Fiscal Year 2014/2015, Phase 15 Alameda, CA 07/30/14
2:00 PM
Sacramento City College Ped/Bike Bridge (Phase 3) Sacramento , CA 07/30/14
2:00 PM
RESIDENTIAL STREET REHABILITATION, PHASE 1, CIP 2013-14 La Mirada, CA 07/30/14
2:30 PM
CONSTRUCTION OF MADISON STREET AND SKYPARK DRIVE RECONSTRUCTION, I-122 AND MEADOW PARK PARKING LOTS REHABILITATION, I-118 Torrance, CA 07/30/14
3:00 PM
PURCHASE, DELIVERY & INSTALLATION OF 2 KODAK I4600 SCANNERS Santa Ana, CA 07/30/14
4:00 PM
ROSEMEAD BOULEVARD PEDESTRIAN BRIDGE REHABILITATION AND BEAUTIFICATION Pico Rivera, CA 07/31/14
8:00 AM
2014 Residential Street Resurfacing Project Citrus Heights, CA 07/31/14
2:00 PM
9750 Waterman Road Drainage and Accessibility Improvements Project (PT0139) Elk Grove, CA 07/31/14
2:00 PM
Axford Alley Improvement Project Santa Cruz, CA 07/31/14
2:00 PM
Crescenta Valley High School Pool Area Concrete Restoration and Sealcoating La Crescenta, CA 07/31/14
2:00 PM
Humanities Secondary Effect San Marcos, CA 07/31/14
2:00 PM
North Rodeo Gulch PM 4.75 Storm Damage Repair Project Santa Cruz Unincorporateds, CA 07/31/14
2:00 PM
Water System Improvement Project 2013 - Phase 2 Cloverdale, CA 07/31/14
2:00 PM
Clear Creek Wastewater Treatment Plant Biosolids Dewatering Project Redding, CA 07/31/14
3:00 PM
Live Scan Systems Santa Ana, CA 07/31/14
4:00 PM
NUT TREE AIRPORT RUNWAY 2-20 THRESHOLD SHIFT AND TAXIWAY K CONSTRUCTION Vacaville, CA 08/01/14
2:00 PM
STORM DRAIN PIPE LINING PROJECT Laguna Niguel, CA 08/01/14
2:00 PM
FY15 Vegetation Road Clearance Project Santa Barbara, CA 08/04/14
2:00 PM
EL DORADO RANCH PARK LANDSCAPING AND IRRIGATION PROJECT Yucaipa, CA 08/05/14
10:00 AM
LANDSCAPE MANAGEMENT/MAINTENANCE SERVICES FOR THE YUCAIPA HISTORIC UPTOWN PBID (YHUPBID) Yucaipa, CA 08/05/14
10:00 AM
Grading and Check Dam Construction Along 16th Street at Tennessee Street Yuciapa, CA 08/05/14
11:00 AM
King Street Improvements Project - Phase 1 La Mesa, CA 08/05/14
11:00 AM
Storm Water Mitigation Various Locations, CA 08/05/14
2:00 PM
Corona Mall Pavement Rehabilitation, Project No. 2014-11 Corona, CA 08/05/14
2:00 PM
NWP Rail Trail Phase I Construction Ukiah, CA 08/05/14
2:00 PM
Wharf 1 Utility Pipe Hangers Monterey, CA 08/05/14
2:00 PM
FURNISH AND INSTALL NEW CARPET TILES Floors 3 & 5 San Francisco, CA 08/05/14
3:00 PM
Palo Alto Airport Pavement Rehabilitation of Runway 13-31 and Taxiways FAA AIP NO.: 3‐06‐0182‐009 Palo Alto, CA 08/05/14
3:00 PM
PREQUALIFICATION: FOOTBALL PERFORMANCE CENTER RE-ADVERTISED Los Angeles, CA 08/05/14
3:00 PM
Magnolia Avenue Trunk Line Rehabilitation Project Larkspur, CA 08/06/14
2:00 PM
Widen Shoulder and Construct Concrete Barrier Various Locations, CA 08/06/14
2:00 PM
PREQUALIFICATION: JULES STEIN SEISMIC CORRECTION AND PROGRAM IMPROVEMENTS RE-ADVERTISED Los Angeles, CA 08/06/14
3:00 PM
Castle Airport Electrical Vault Building and Electrical Castle Improvements Project Atwater, CA 08/07/14
10:00 AM
2011 TDA Bus Pad Upgrade Redlands, CA 08/07/14
11:00 AM
Enhance Airfield Drainage (Phase 2) BOULDER CITY, NV 08/07/14
1:00 PM
Barco Replacement Project Various Locations, CA 08/07/14
2:00 PM
Putah Creek Parkway Davis, CA 08/07/14
2:00 PM
Sewer Group Job 795 San Diego , CA 08/07/14
2:00 PM
Sycamore Canyon Business Park Central and Southern Stormwater Treatment Basins Riverside , CA 08/07/14
2:00 PM
DMV Riverside Roof Replacement Riverside, CA 08/07/14
2:30 PM
Restore Cayucos Pier San Luis Obispo, CA 08/07/14
3:00 PM
Las Flores Canyon Creek Restoration and Park Project Phase 2 Malibu, CA 08/07/14
3:30 PM
Branciforte Drive PM 5.06 Storm Damage Repair Project Santa Cruz, CA 08/08/14
2:00 PM
Demolition of Residence at 2821 Rosedale Avenue, Soquel Soquel, CA 08/11/14
2:00 PM
Bon Air Road Bridge Replacement Project Larkspur, CA 08/12/14
10:00 AM
Tracy Municipal Airport Reconstruction of Runway 12-30 and Taxiways B, D, and E and the Runway/Taxiway Intersection Schedule A and Schedule B Tracy, CA 08/12/14
10:00 AM
Beach/Pacific (Wharf) Intersection Roundabout Santa Cruz, CA 08/12/14
2:00 PM
BIKEWAYS STRATEGY AND FEASIBILITY STUDIES FOR SUPERVISORIAL DISTRICT 3 Orange, CA 08/12/14
2:00 PM
Bollinger Canyon Road Pedestrian & Signal Improvement Project - CIP No. 5533, Federal Aid Project No. HSIP-5437(023) San Ramon, CA 08/12/14
2:00 PM
Invitation for Bid for LED Streetlight Luminaires Elk Grove, CA 08/12/14
2:00 PM
2014 Street Resurfacing Project - City Project No. 2014-01 Livermore, CA 08/12/14
2:30 PM
Cabrillo Boulevard Bridge (Replacement) SANTA BARBARA, CA 08/12/14
3:00 PM
Natural Sciences II Re-Roof Exhaust Fan Area Santa Cruz, CA 08/12/14
3:00 PM
Federally Funded Cycle 3 Safe Routes to School (SRTS) Project Ridgecrest, CA 08/12/14
4:00 PM
ELK HILLS ROAD FROM SKYLINE ROAD TO ONE MILE SOUTH OF THE CALIFORNIA AQUEDUCT Buttonwillow, CA 08/13/14
11:00 AM
Kern Valley Airport perimeter fence Kern Valley, CA 08/13/14
11:00 AM
Wasco Airport perimeter road Wasco, CA 08/13/14
11:00 AM
Civic Center Playground Shade Structure Replacement Palm Desert, CA 08/13/14
2:00 PM
Tule Elk State Nature Reserve - Day Use Area Rehabilitation Buttonwillow, CA 08/13/14
2:00 PM
WWTP LEVEE REMOVAL AND IRRIGATION IMPROVEMENTS MERCED, CA 08/13/14
2:00 PM
Freisman Park City Project 2007-2066 Livermore, CA 08/13/14
2:30 PM
Vicente Street and Ocean Avenue Pavement Renovation, Sewer Replacement, and Water Main Installation San Francisco , CA 08/13/14
2:30 PM
DEMOLITION/ABATEMENT SERVICES RANCH LOS AMIGOS NATIONAL REHABILITATION CENTER - SITE 1 DEMOLITION AND MAKE-READY PROJECT Downey, CA 08/13/14
5:00 PM
DESIGN BUILD INSTALLATION OF NEW CONDENSING WATER PUMPS AND VALVES Los Angeles, CA 08/13/14
5:00 PM
Windows and Slider Doors Replacement Santa Barbara, CA 08/14/14
9:00 AM
Brookhurst Street Rehabilitation Garden Grove, CA 08/14/14
11:00 AM
13-6796: CHESTNUT AVE. CLASS II BIKEWAY; STANDARD AVE TO GRAND AVE; CM-5063(148) 14-6813: ALLEY IMPROVEMENT-FY 13/14 14-6803: CHESTNUT AVE REHABILITATION; BROADWAY TO MAIN SANTA ANA, CA 08/14/14
2:00 PM
City of Perris 2014 Pavement Rehabilitation & Flood Benefit Zone Rehabilitation Project Perris, CA 08/14/14
2:00 PM
DeRicco Lobby Project Stockton, CA 08/14/14
2:00 PM
MATHER HOUSING WATER TREATMENT PLANT FILTER REHABILITATION PROJECT Sacramento, CA 08/14/14
2:00 PM
Perform Highway Planting and Install Irrigation System Various Locations, CA 08/14/14
2:00 PM
Ready-Mixed Concrete (Short Loads) Anaheim, CA 08/14/14
2:00 PM
Recycled Water Easterly Main Extension Escondido, CA 08/14/14
2:00 PM
Tank No. 3 Glenview Replacement San Bruno, CA 08/14/14
2:00 PM
Whitewater Neighborhood Park Cathedral City, CA 08/14/14
2:00 PM
Mason Street Bridge Replacement Project, Bid No. 3588 City of Santa Barbara, CA 08/14/14
3:00 PM
Milsap Wetland Restoration Project Aptos, CA 08/14/14
4:00 PM
D Street Roadway Enhancements Phase 6 Railroad Track to 10th Street Perris, CA 08/18/14
2:00 PM
City of Temecula Old Town Sewer Improvements Temecula, CA 08/19/14
10:00 AM
Small Valve Replacement Project 4294 Spring Valley, CA 08/19/14
11:00 AM
17th Street Public Sidewalk Improvements Santa Ana, CA 08/19/14
2:00 PM
2014 SLURRY SEAL PROJECT CARLSBAD, CA 08/19/14
2:00 PM
Construction of the Rio Vista Water Treatment Plant Clearwell NO.1 Improvements Project Santa Clarita, CA 08/19/14
2:00 PM
Flooring Repair and Maintenance Services Anaheim, CA 08/19/14
2:00 PM
Network Operation Center (NOC), Administration Building B Basement Remodeling Glendale, CA 08/19/14
2:00 PM
Orange Line Fiber Optic Cabling Installation Project Phase 4 (Grossmont Center Station to Santee Town Center Station) Various Locations, CA 08/19/14
2:00 PM
CARLSBAD BOULEVARD OVERHEAD RAILING IMPROVEMENTS AND RETAINING WALL REHABILITATION Carlsbad, CA 08/20/14
2:00 PM
Street and Traffic Signs Anaheim, CA 08/20/14
2:00 PM
Wastewater Treatment Plant Headworks Upgrade McFarland, CA 08/20/14
2:00 PM
Ahmanson Lift Station Upgrade Project - Rebid Corona, CA 08/21/14
2:00 PM
Corporation Yard Expansion Phase 2 - Materials Bin Storage Facility Project (WFC003) Elk Grove, CA 08/21/14
2:00 PM
Sacramento International Airport Reconstruct Portions of Taxiway Delta 3 Sacramento, CA 08/21/14
2:00 PM
Sixth Street Improvements, LED Trail Lighting, LED Upgrades, and Fiber Optic Repair Gilroy, CA 08/21/14
2:00 PM
WATER METER REPLACEMENT AND ENDPOINT INSTALLATION CARLSBAD, CA 08/21/14
2:00 PM
First Street Water Line Replacement Project Simi Valley, CA 08/21/14
2:30 PM
Mental Health Building - Lobby Renovation Redding, CA 08/21/14
3:00 PM
2014/2015 Palm Springs High School Concession/Field House Palm Springs, CA 08/25/14
2:00 PM
CALAVERA HILLS AND STAGECOACH COMMUNITY PARKS ATHLETIC FIELDS LIGHTING RETROFITS Carlsbad, CA 08/26/14
2:00 PM
CONSTRUCTION OF RUNWAY SAFETY AREA IMPROVEMENTS, NORTH FIELD, OAKLAND INTERNATIONAL AIRPORT, OAKLAND, CALIFORNIA, AIP 3-06-0170-(FUTURE) Oakland, CA 08/27/14
2:00 PM
Apartment Complex Rehabilitation Santa Barbara, CA 08/27/14
3:00 PM
Canopy Repairs and Replacement Riverside , CA 08/28/14
2:00 PM
Pavement Rehabilitation, Replace AC with CRCP Various Locations, CA 08/28/14
2:00 PM
Construct Concrete Pavement, Precast Concrete Panels, and Slabs Various Locations, CA 09/11/14
2:00 PM
PALMDALE WATER RECLAMATION PLANT ENTRANCE GATES AND SECURITY SYSTEM Palmdale, CA 09/16/14
2:00 PM
FINAL BID RESULTS POSTED SINCE Jul 22 2014 7:09PM
Vassar Avenue Reconstruction, Project 11-31 and 12-30 Mountain View, CA 07/16/14
2:00 PM
Mens Faculty Club Replace Fire Alarm System Berkeley, CA 07/18/14
2:00 PM
RE Badger Water Filtration Plant Electrical Distribution and Substation Improvements Project Rancho Santa Fe, CA 07/22/14
10:00 AM
Fire Station No. 3 Roof Improvements (15517 Carmenita Road) Santa Fe Springs, CA 07/22/14
11:00 AM
2014 Streets Resurfacing Project Various Locations, CA 07/22/14
2:00 PM
Corporation Yard Pavement Maintenance Project Windsor, CA 07/22/14
2:00 PM
Madera County Jail Expansion Project Phase II Madera, CA 07/22/14
2:00 PM