Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: B Street Pier Cruise Ship Terminal Photovoltaic Installation
Description: *** Non-Mandatory Prebid Conference Has Passed ***

This project involves to install a photovoltaic system on the canopy at B Street Pier Cruise Ship Terminal, and other related incidental items of work as shown on the drawings and as specified in the specifications. The Work to be done includes but is not limited to: procurement and installation...
2015-27 San Diego CA 12/07/15
2:00 PM
$712,000 to $712,000
Project Name: NCMT Berth 24-10 Structural and Mooring Repairs
Description: This project involves rehabilitation of the reinforced concrete marginal wharf and mooring repairs at Berth 24-10. Work will consist of removing the asphalt pavement and constructing a new concrete, cast-in-place deck over the existing concrete deck, driving pipe-pile over 59 existing pre-stressed concrete piles, placing 3 jackets on existing concr...
201429 National City CA 01/05/16
2:00 PM
$6,400,000 to $6,400,000