Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: LED Street Lighting Retrofit Project FY 15/16
Description: This project involves the retrofit of 294 existing lights located at various Tideland locations. The Work shall include removal and disposal of existing street light heads; re-using existing electrical wirings and fuses; procurement and installation of new LED luminaires, bird spikes, fitters, photocells, shorting cap and bird spikes for pole arm; ...
2015-16 San Diego CA 08/04/15
2:00 PM
$190,000 to $190,000
Project Name: Shelter Island Fishing Pier Boat Dock Replacement
Description: This project includes but is not limited to:
1) Furnish all labor, materials and equipment as necessary to complete the Shelter Island Fishing Pier Boat Dock Replacement as follows: a) Removal and disposal of existing concrete floating dock and aluminum gangway and aluminum landings and ramps. b) Supply and install aluminum framed floating dock. c...
2015-18 San Diego CA 08/17/15
2:00 PM
$450,000 to $450,000