Project Project Number City State Bid Due Date Estimated Cost
Project Name: P.D. Parking Lot Expansion
Description: The project consists primarily of expansion
of the existing secured Police Department
parking lot located at the Civic Center, 2000
Main Street.
CC 1556 Huntington Beach CA 07/25/17
2:00 PM
$80,000
Project Name: HEIL AVENUE AND MAIN STREET REHABILITATION, CC NO. 1540
Description: The project segments include Heil Avenue and
Main Street as stated above. The Heil
Avenue segment rehabilitation method will
pulverize failed asphalt concrete and base,
cement treatment of the base, and a finish
course of asphalt concrete with fiber
reinforced asphalt concrete (FRAC). The
asphalt rehabilitation on the Main Street
...
CC-1540 Heil-Main Huntington Beach CA 07/25/17
2:00 PM
$2,210,000 to $2,210,000
Project Name: Edgewater Sewer Lift Station
Description: Project will build a new sewer lift station
to replace and existing lift station across
the street.
CC1515 Huntington Beach CA 08/01/17
2:00 PM
$3,500,000
Project Name: Magnolia Street Bridge Preventive Maintenance
Description: This bridge preventive maintenance project
consists primarily of the removal and
replacement of the concrete barriers and
chain link railing; removal and patching of
unsound concrete at the bridge bents and
columns; the replacement of missing rock
slope protection in the channel; and
appurtenant work as required.
CC-1448 Huntington Beach CA 08/01/17
2:00 PM
$805,000
Project Name: Brookhurst Street Bridge Preventive Maintenance
Description: This bridge preventive maintenance project
consists primarily of the removal and
replacement of the concrete barriers and
chain link railing; removal and patching of
unsound concrete at the bridge bents and
columns; removal and replacement of AC
pavement overlay; and appurtenant work as
required.
CC-1449 Huntington Beach CA 08/01/17
2:00 PM
$945,000