Project Project Number City State Bid Due Date Estimated Cost
Project Name: MAIN STREET, TALBERT AVENUE AND HEIL AVENUE REHABILITATION, CC-1527
Description: The project consists primarily of grinding the existing pavement, removal of failed roadway sections, asphalt concrete paving of failed areas, overlaying the streets with fiber reinforced asphalt concrete, and limited removal and installation of concrete curb and gutter, concrete sidewalk, cross-gutter, and curb access ramps. Sewer and storm drain...
CC-1527 Huntington Beach CA 07/26/16
2:00 PM
$2,680,000 to $2,680,000
Project Name: Edinger Avenue Widening, CC No. 1528
Description: The project consists primarily of: removal of concrete curb, gutter, sidewalk, driveway aprons, and landscaping; construction of asphalt concrete pavement, concrete curb, gutter, sidewalk, driveway aprons, water service and meter; installation of new street lighting; relocation/adjustment of fire hydrant, utility boxes/pedestals, Wells Fargo monume...
CC-1528 Huntington Beach CA 08/11/16
2:00 PM
$330,000 to $330,000