Project Name: Maintenance District 22A Wastewater Treatment Plant Site Improvements and Sprayfield Expansion
Description:
Part 1
Demolition, clearing and grubbing of select existing site elements, preparation and implementation of Dust Control Plan and Storm Water Pollution Prevention Plan, grading and earthwork, installation of sprayfield mainlines, laterals, valves, and sprinklers; construction of runoff collection return system with automatic screen filter, concre...
|
09-003-1 |
Oakhurst |
CA |
BID CLOSED 06/13/13 2:00 PM |
$3,925,000-$4,531,000 |
Project Name: MD10A Dublin Drive Production Well Project
Description:
The project includes but is not necessarily limited to furnishing all labor, materials and equipment for the construction, development and testing of one (1) municipal supply well, with a design capacity of 800 gpm, including but not limited to site preparation, conductor casing and sanitary seal, borehole drilling, geophysical logging, casing inst...
|
11-025 |
Madera |
CA |
BID CLOSED 06/14/13 2:00 PM |
$250,000-$250,000 |
|