Project Project Number City State Bid Due Date Estimated Cost
Project Name: Citywide ADA Ramps and Street Reconstruction, Phase 5
Description: In general, the work consists of, but is not limited to, the demolition and construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach) and curb ramps, storm drainage, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction and Hot Mix Asphalt pavement.
1052517-0071 Monterey CA BID CLOSED
07/11/17
2:00 PM
$750,000
Project Name: Lower Historic Park Improvements
Description: In general, the work consists of, but is not limited to, clearing and grubbing, sawcutting, demolition of existing improvements, grading, curb and gutter, concrete parking stalls, asphalt conforms, Decomposed Granite walkway, pavement markings, erosion control, ramps and handrails, and construction of new colored concrete walking paths. Work also...
1050517-0055 Monterey CA BID CLOSED
06/06/17
2:00 PM
$472,900
Project Name: Citywide Street Resurfacing (Slurry), Phase 5
Description: In general, the work consists of, but is not limited to, pavement spot repair of approximately 300,000 SF, crack sealing, placing of approximately 1,200,000 SF of slurry seal, associated striping removal and replacement, refreshing of existing painted street markings, traffic control and installation of necessary environmental pollution prevention ...
1050217-0059 Monterey CA BID CLOSED
05/23/17
2:00 PM
$2,500,000