Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: Shima Paint Project
Description: The Project generally consists of Painting the exterior of the building and the interior stairways of the Shima building before the Fall School semester starts on August 14, 2017. This project also includes repair/replacement of fascia, flashings, gutters and downspouts with a prefinished sheet metal material. The sheet metal work can continue into...
BID 723 Stockton CA BID CLOSED
06/06/17
2:00 PM
$1,000,000
Project Name: Roofing Replacement Project
Description: The Project generally consists of:

Reroofing of the Holt Center, CMAS, Budd Shops, Budd building and a small portion of the Danner building. The entire scope of the project is approximately 117,000 SF of sloped fiberglass shingle material and approximately 29,600 SF of “flat” single ply roofing system for an approximate total reroofing area of 1...
LA-9105-03 Stockton CA BID CLOSED
05/09/17
2:00 PM
$2,900,000 to $2,900,000
Project Name: Faculty Offices Improvement Project
Description: The Project generally consists of renovating approximately 162 faculty offices located within four buildings at the Stockton Campus of San Joaquin Delta College. The scope includes: packing faculty offices; moving non-furniture contents to onsite storage; moving existing furniture to a predetermined on-site parking lot; demolition and proper offsi...
Bid #722 Stockton CA BID CLOSED
05/01/17
2:00 PM
$250,000 to $250,000