Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: Sewage Pump & Storm Water Pump Replacement
Description: The project generally consists of: Reline existing sewage ejector sump at Danner building and replace existing duplex wastewater pumps with new wastewater pumps at Budd, Forum, Holt, Locke and Shima buildings. Work includes but is not limited to disconnecting existing pumps, removing existing electrical conduits, conductors, and disconnect switches...
Bid 709 Stockton CA BID CLOSED
08/28/15
2:00 PM
$209,000 to $209,000
Project Name: Elevator Alterations - Increment II
Description: The project was reviewed and approved by the Division of State Architect (DSA) and it consists of:
Removing existing jack assemblies and installing new jack assemblies at eight elevators; work will include
drilling to oversize the existing plunger hole in order to install new protective PVC liners outside the new jack
assemblies; work will be br...
LA-8342-02 Stockton CA BID CLOSED
08/24/15
1:30 PM
$425,000 to $425,000
Project Name: REBID of Fascia Repairs and Budd Building Paint Project
Description: The Project generally consists of:
At the Administration and Forum buildings, work consists of fascia repair, adding metal cladding over fascia, gutter and
downspout repair/replacement.
At the Budd building, work consists of fascia repair/replacement, adding metal cladding over fascia, gutter
and downspout replacement, and complete building ext...
Bid 708 Stockton CA BID CLOSED
08/13/15
2:00 PM
$1,290,000 to $1,290,000
Project Name: Fascia Repairs and Budd Building Paint Project
Description: The Project generally consists of:
At the Administration and Forum buildings, work consists of fascia repair, adding metal cladding over fascia, gutter and downspout repair/replacement and painting.
At the Budd building, work consists fascia repair, adding metal cladding over fascia, gutter and downspout repair/replacement and painting, and compl...
Bid 707 Stockton CA BID CLOSED
07/06/15
2:00 PM
$1,160,500 to $1,160,500
Project Name: Shima Heavy Equipment-Phase II
Description: The project has been reviewed and approved by the Division of State Architect (DS) and it generally consists of:
Enclose the Mezzanine area of the existing Shima Building with rated walls and add a interior stairway as well as an exterior elevator and machine room to serve the Mezzanine area. Add mechanical exhaust fans; upgrade the pneumatic air ...
LA-9607-06 Stockton CA BID CLOSED
06/01/15
3:00 PM
$900,000 to $900,000