Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: WRP Rake Drive Replacement
Description: Replace rake drive units on two secondary clarifiers at the City of Livermore's Water Reclamation Plant. Work involves disconnecting some utilities, supporting existing structures, lifting bridge and existing unit out of clarifiers, installing new unit, reinstalling bridge, reconnection utilities, touch-coating, and associated work.
2012-12 Livermore CA 06/26/13
2:30 PM
$140,000-$180,000
Project Name: Galaxy Court Trail Culvert Replacement
Description: The work includes, but is not limited to, the installation of project site wildlife exclusion fence and stream bank protection, installation and maintenance of trail detour signs, removal of asphalt pathways, removal of stream bank rip rap and concrete protection, removal of twin 48” metal culverts, removal of approximately 50 cubic yards of sedim...
2010-29 Livermore CA 06/27/13
2:30 PM
$350,000-$350,000
Project Name: East Vineyard Avenue Realignment and Signalization
Description: The Work comprises the construction of a roadway, multi-use trail and a traffic signal in the City of Livermore for the East Vineyard Avenue Realignment and Signalization Project. The project consists of, in general, the construction of roadway, traffic signal, a paved trail, trail appurtenances, signs, pavement markings, grinding asphalt concrete...
1996-60 Livermore CA 06/25/13
2:30 PM
$1,130,000-$1,130,000
Project Name: 2013 Slurry Seal
Description: The contract includes preparatory street cleaning, tree trimming, root pruning, asphalt concrete pavement and base repairs, crack sealing, removal of existing traffic striping and markers, application of micro-surfacing and slurry seal treatments, application of seal coat in existing City parking lots, the installation of new thermoplastic pavement...
2013-04 Livermore CA 06/25/13
2:30 PM
$1,248,000-$1,248,000