| Project |
Project Number  |
City |
State |
Bid Due Date |
Estimated Cost |
Project Name: Pioneer Drive from Gargano Road to Vineland road
Description:
The work to be performed consists, in general, of surface unpaved street on Pioneer Drive in Bakersfield.
|
3000-S216G21C/12003 |
Bakersfield |
CA |
05/29/13 11:00 AM |
$280,000-$280,000 |
Project Name: PHASE 1 FINAL CLOSURE AT THE BAKERFIELD METROPOLITAN (BENA) SANITARY LANDFILL
Description:
THE WORK TO BE PEFORMED CONSISTS, IN GENERAL OF, BUT IS NOT NCESSARILY LIMITED TO:GENERAL EARTHWORKS; CLEAING, GRUBBING AND STRIPPING, EXCAVATING EXISTING SOIL BOROW; USING EXISTING SOIL BORROW FOR PROCESSING,PLACING AND COMPACTING A FINAL COVER EVAPO-TRANSPIRATIVE (ET) SOIL LAYER CLOSURE AND ENGINEERING FILL, SOIL MANAGEMENT, CONSTRUCTING A PAN LY...
|
13014/c8993819603 |
BAKERSFIELD |
CA |
05/22/13 11:00 AM |
$2,596,013-$2,596,013 |
Project Name: 55TH STREET WEST FROM ROSAMOND BOULEVARD TO ASHE STREET AND ASTORIA AVENUE FROM 60TH STREET WEST TO 700 FEET EAST OF 55TH STREET WEST
Description:
The work to be performed consists, in general, of constructing asphalt concrete roadway.
|
12025/MRM22 & MRM21C |
Rosamond |
CA |
05/29/13 11:00 AM |
$895,792-$895,792 |
|