| Project |
Project Number |
City |
State |
Bid Due Date |
Estimated Cost  |
Project Name: AC Overlay Project – 2013 Federal
Description:
This bid includes, but is not limited to:
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for doing all the work necessary associated with placing rubberized asphalt concrete pavement overlay, slurry seal, repairing failed pavement (base repair), grinding the pavement to accommodate the...
|
4149 |
Sacramento |
CA |
07/11/13 2:00 PM |
$3,065,000-$3,065,000 |
Project Name: White Rock Dump Closure Dump-1 and Dump-2
Description:
The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary for work related to the clean closure of White Rock Dump 2 (WRD 2) and consolidation of burn dump debris and contaminated soil at the White Rock Dump 1 (WRD 1). The work will include site preparation activit...
|
4183 |
Rancho Cordova |
CA |
07/11/13 2:00 PM |
$1,218,000-$1,218,000 |
Project Name: KIEFER LANDFILL MULTI-PURPOSE AREA ASPHALT REHABILITATION
Description:
The Kiefer Landfill Multi-Purpose Area was constructed in 2005, and since that time has continuously been used for receiving, processing, storage, and handling of green waste. The area is asphalt paved and surrounded on three sides by a 10-foot chain-link fence. Green waste is processed utilizing a trommel screen or grinder. Processed green materia...
|
4171 |
Sacramento |
CA |
07/11/13 2:30 PM |
$417,118-$417,118 |
Project Name: Rio Cosumnes Correctional Center
Christopher Boone Facility
Replace Intercom System
Description:
The work to be performed under this contract includes the furnishing of all labor, materials, equipment, transportation and services necessary to replace the inmate intercom system in housing unit Christopher Boone Facility.
An optional pre-bid conference and walk-through will be held for the purpose of observing the existing conditions of the j...
|
Contract 4180 |
Elk Grove |
CA |
07/25/13 2:00 PM |
$345,000-$345,000 |
|