Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: Slover Avenue - Phase II Tamarind Avenue to Alder Avenue and West of Linden Avenue to Cedar Avenue
Description: The work, in general, consists of removing trees and stumps, concrete and asphalt concrete surfacing, fences, gates, block wall and footing; demolishing building structures; pulverizing and placing cement treated base; paving asphalt concrete; constructing concrete curb and gutter, cross gutter, driveway approaches, curb ramps, block walls and reta...
HB0020 Bloomington CA BID CLOSED
02/04/16
10:00 AM
$1 to $1
Project Name: West Valley Day Reporting Office Expansion Project
Description: The work consists of but is not necessarily limited to West Valley day reporting office expansion project.

All bidders must register with the ePro system prior to the date and time to receive sealed bids or they will be disqualified. https://epro.sbcounty.gov/epro/



4P10 Fontana CA BID CLOSED
01/28/16
2:00 PM
$1 to $1
Project Name: CSA 70 Zone GH (Glen Helen) Walkways and Fall Protection Project at Lytle Creek North Water Reclamation Plant
Description: Successful contractor shall provide all labor, equipment, materials and transportation necessary to satisfactorily perform the work that includes the services to install metal walkways and handrails and post cleanup activities as shown in the specifications and bid documents.

1122415-0011 Glen Helen CA BID CLOSED
01/14/16
2:00 PM
$150,000 to $150,000
Project Name: 104 W 4th Street Canopy Addition
Description: The work consists of but is not necessarily limited to 104 W. 4th St. Canopy Additions in San Bernardino, California.

All bidders must register with the ePro system prior to the date and time to receive sealed bids or they will be disqualified. https://epro.sbcounty.gov/epro/

For information regarding this project, contact Jeffrey Banks, Pro...
5P20 San Bernardino CA BID CLOSED
12/15/15
3:00 PM
$40,000 to $40,000
Project Name: Pneumatic Tank Site Retaining Wall Construction at CSA 70 CG (Cedar Glen)
Description: Pneumatic Tank Site Retaining Wall & Grading Project consist of retaining walls (approximately 145 lft., curb and gutter (approximately 80-lft., v-ditch construction (approximately 80 lft and site grading. Successful contractor shall provide all labor, equipment, materials and transportation necessary to satisfactorily perform the work as shown on ...
1641 Cedar Glen CA BID CLOSED
11/18/15
2:00 PM
$140,000 to $140,000
Project Name: Big Bear Alpine Zoo Project
Description: Successful contractor shall provide all labor, equipment, materials and transportation necessary to satisfactorily perform the work which includes but is not limited to the mobilization, insurance and bonds, Storm Water Pollution Prevention Plan (SWPPP), drainage facilities, site work, construction of various buildings, utilities, landscape, animal...
1Z19 Big Bear Lake CA BID CLOSED
11/17/15
2:00 PM
$7,400,000 to $7,400,000