Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: 8TH STREET(FROM BAKER AVE. TO HELLMAN AVE.) BAKER AVE. (FROM MAIN ST. TO FOOTHILL BLVD.) AND 6TH ST. (HERMOSA AVE. TO HAVEN AVE.) PAVEMENT REHABILITATION PROJECTS
Description: The scope of work to be performed in
general consist of but not limited to,
clearing and grubbing and pavement
preparation, crack sealing, cold planing,
asphalt concrete patching, Asphalt Rubber
Hot Mix (ARHM) overlay, striping and
pavement markings and installation of
traffic signal loops and video detection
systems.

NOTE: NO PR...
Rancho Cucamonga CA 05/05/15
2:00 PM
$544,000-$544,000