Project Name: Pipeline 3 Relining Sweetwater to Lower Otay, Specification 613 Description:
The work generally consists of but is not limited to; relining approximately 28,400 feet of Pipeline 3, an existing 69 inch diameter prestressed concrete cylinder pipe; fabricating steel liners; fabricating and installing approximately 680 feet of 66-inch outside diameter welded steel pipe at 17 access portals; installing, maintaining and removing ...