| Project |
Project Number |
City  |
State |
Bid Due Date |
Estimated Cost |
Project Name: Mission Hills Historic Street Lighting
Description:
The Work involves furnishing all labor,materials,
equipment,services, and other incidental works and appurtenances for the construction of the
Project as described below:
Furnish and install 116 new ornamental streetlights in District 3 Mission Hills MAD
area, including removal and salvage 19 existing cobra streetlights in the same area.
Conne...
|
K-13-5793-DBB-3 |
San Diego |
CA |
06/19/13 2:00 PM |
$685,000-$685,000 |
Project Name: Water Group Job 945
Description:
The replacement of existing cast iron water mains, with approximately 5,764 linear feet of 16 inch PVC water mains.
|
K-13-5836-DBB-3 |
San Diego |
CA |
06/20/13 2:00 PM |
$1,620,000-$1,620,000 |
Project Name: Pipeline Rehabilitation
U-1
Description:
Construction of Pipeline Rehabilitation U-1 consists of the rehabilitation of eight inch (8") and ten inch (10") sewer mains, and manholes, pipeline point repairs, pavement resurfacing, traffic control and all other work in accordance with the specifications for Pipeline Rehabilitation U-1.
|
K-13-5912-DBB-3 |
San Diego |
CA |
06/25/13 2:00 PM |
$5,500,000-$5,500,000 |
Project Name: Job Order Contract (JOC) SP13 Street Paving #1
Description:
The scope of work includes a collection of detailed repair and construction tasks and specifications that have pre-established unit prices listed in a Unit Price Book (UPB) that was developed by the City. Work under this Contract will be performed for the City of San Diego on a per task basis. Work will involve for City related streets the placemen...
|
K-13-1094-JOC-3-C |
San Diego |
CA |
07/09/13 2:00 PM |
$10,000,000-$10,000,000 |
Project Name: Job Order Contract (JOC) P13 Right-of-Way Pipeline
Description:
The scope of work includes a collection of detailed repair and construction tasks and specifications that have pre-established unit prices listed in a Unit Price Book (UPB) that was developed by the City. Work under this Contract will be performed for the City of San Diego on a per task basis. Work will involve repair alteration modernization, main...
|
K-13-5870-JOC-3 |
San Diego |
CA |
07/02/13 2:00 PM |
$4,500,000-$4,500,000 |
Project Name: Pipeline Rehabilitation Y-1
Description:
The project proposes to rehabilitate 41,846 LF (7.93 miles) of existing 8” and 10” sewer main and laterals, including rehabilitation or replacement of manholes, installation of new cleanouts, sewer laterals, and pipeline point repairs. Related work will include best management practices (BMP’s) for erosion control and storm drain inlet protection, ...
|
K-13-1098-DBB-3 |
San Diego |
CA |
07/10/13 2:00 PM |
$5,100,000-$5,100,000 |
Project Name: San Diego River Multi-Use Pathway
Description:
Construction of a concrete and pervious pathway, access ramp, retaining walls, gravity walls,peeler log fence, kiosk, street lights,luminaire lights, electrical system, striping and signage.
|
K-13-4917-DBB-3 |
San Diego |
CA |
07/10/13 2:00 PM |
$841,000-$841,000 |
|