Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: Hollister Airport Runway 13-31 Rehab.
Description: The Project entitled Improvement Plan to Rehabilitate Runway 13-31 is a pavement repair project to remediate failing surface pavement of the runway. The project is addressing the pavement structure for the length of Runway 13-31 between Taxiway D and the western edge of the runway. The pavement surfaces between the runway and the hold position mark...
AIP No. 3-06-0105-16 Hollister CA 08/06/14
3:00 PM
$2,200,000-$4,600,000