Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: Edinger Avenue Widening, CC No. 1528
Description: The project consists primarily of: removal of concrete curb, gutter, sidewalk, driveway aprons, and landscaping; construction of asphalt concrete pavement, concrete curb, gutter, sidewalk, driveway aprons, water service and meter; installation of new street lighting; relocation/adjustment of fire hydrant, utility boxes/pedestals, Wells Fargo monume...
CC-1528 Huntington Beach CA 07/26/16
2:00 PM
$330,000 to $330,000
Project Name: Brookhurst Street Frontage Road Improvements, CC-1531
Description: The project consists primarily of concrete driveway, curb & gutter, and sidewalk replacement, street tree replacement, cold milling existing pavement, installation of an inch and a half (1-1/2) asphalt concrete overlay, and adjustment of existing utility covers. In addition, a small catch basin and storm drain will be installed with a small storm...
1531 Huntington Beach CA 07/07/16
2:00 PM
$260,000 to $260,000