Project Name: Shima Heavy Equipment-Phase II
Description: The project has been reviewed and approved by the Division of State Architect (DS) and it generally consists of:
Enclose the Mezzanine area of the existing Shima Building with rated walls and add a interior stairway as well as an exterior elevator and machine room to serve the Mezzanine area. Add mechanical exhaust fans; upgrade the pneumatic air ...
LA-9607-06 Stockton CA 06/01/15
3:00 PM
$900,000-$900,000