Project Name: TRI-AGENCIES WATER TRANSMISSION PIPELINES REACH 2 PHASE 1
Description: Construction of approximately 1,860-feet of 18-inch potable water steel pipe and pressure reducing station.
PWS15-71UTIL Carlsbad CA 04/21/15
2:00 PM
$1,200,000-$1,200,000
Project Name: CARLSBAD WATER RECYCLING FACILITY Design-Build Request for Proposal
Description: The Carlsbad Water Recycling Facility (CWRF) currently produces up to 4.0 MGD of tertiary recycled water using 2 treatment trains that consist of microfiltration and granular media filtration. This Project generally involves design and construction of treatment facilities to expand the capacity of the CWRF with an additional 3.0 MGD of tertiary rec...
1021915-0080 Carlsbad CA 04/15/15
2:00 PM
$8,000,000-$10,000,000
Project Name: AGUA HEDIONDA SEWER LIFT STATION, VISTA/CARLSBAD INTERCEPTOR SEWER REACHES VC11-B-VC15 AND RECYCLED WATER LINE
Description: onstruction of a prefabricated steel truss bridge, construction of a 33 million gallon a day capacity wastewater lift station; construction of approximately 4,000 lineal feet of 36-inch diameter HDPE sewer force main pipeline by open cut and trenchless methods of installation; construction of approximately 6,900 lineal feet of 54-inch diameter grav...
PWS13-40UTIL Carlsbad CA 04/08/15
2:00 PM
$43,500,000-$43,500,000
Project Name: RECYCLED WATER PHASE III PIPELINE EXPANSION SEGMENT NO. 1A & 7
Description: Furnish and install approximately 4,151 linear feet of 8-inch, C-900, PVC, DR14 pipeline, 6,611 linear feet of 6-inch, C-900, PVC, DR14 pipeline, 3,392 linear feet of 4-inch, C-900, PVC, DR14, and 59 Recycled Water Services with all valves and appurtenances.
PWS15-60UTIL City of Carlsbad CA 04/07/15
2:00 PM
$2,900,000-$2,900,000
Project Name: FARADAY AVENUE FIBER OPTIC IMPROVEMENTS
Description: The fiber optic system work shall include all work necessary to provide a complete and fully functional conduit system for part of the City.

Contractor shall furnish all fiber optic and associated equipment including but not limited to conduit, pullboxes, and vaults as shown on plans
PWI 15-73 INFO Carlsbad CA 04/02/15
2:00 PM
$175,000-$175,000