Project Project Number City State Bid Due Date Estimated Cost
Project Name: Orwood Road Bridge Replacement
Description: General work description: The work to be done generally consists of replacing the existing bridge structure and reconstructing roadway approaches on Orwood Road at Warner Dredger Cut.
Engineer's cost estimate: $7,256,000
Number of Working Days: 360
This is a federal aid contract. The Disadvantaged Business Enterprise (DBE) contract goal is 14%.Y...
0662-6R4076 Indian Slough CA 04/07/15
2:00 PM
$7,256,000-$7,256,000
Project Name: Giaramita Street Sidewalk Replacement Project
Description: The work to be done generally consists of sidewalk improvements, curb ramps, curb, gutter, valley gutter, pavement conform, storm drain improvements, slurry seal, signing, and thermoplastic striping.

0662-6R4126 -15 Richmond CA 03/31/15
2:00 PM
$280,000-$280,000
Project Name: Pacheco Boulevard Sidewalk Gap Closure Phase II
Description: General work description: The work to be done generally consists of removing a portion of existing sidewalk, widening the roadway to provide a parking and bike lane, constructing curb, sidewalk, curb ramp and driveways, removal of existing and installation of new retaining walls and striping on the north side of Pacheco Boulevard between Windhover ...
0662-6R4122 Martinez area CA 03/10/15
2:00 PM
$510,000-$510,000