Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: San Mateo Tank Rehabilitation
Description: Work consists of but is not limited to
installation of a tank mixing system,
modifications to overflow pipe/drain
connection, installation of a second shell
manway, sample taps, level transducer
assembly and replacement of half travel
level gauge, tank roof rafter
straightening and purlin installation,
360 vent cover installation, ...
1 6221.21 Novato CA 07/27/17
3:00 PM
$1,600,000 to $1,600,000