Springdale Street 36-inch Water Main Corrosion Control and Rehabilitation and Arterial Street Rehabilitation Project, from Warner Avenue to the north City Limit Line, CC 1330


CC 1330 

Project Name: Springdale Street 36-inch Water Main Corrosion Control and Rehabilitation and Arterial Street Rehabilitation Project, from Warner Avenue to the north City Limit Line, CC 1330
Project Type:
Engineering/Civil
Ownership: Public
Project City, State: Huntington Beach, California
Engineer's Estimated Cost: $5,800,000-$5,800,000 
Pre-Qualification for Bidders: Not Required
License Type Required: Class A
Project/Contract Number: CC 1330
Project Contact: Andrew Ferrigno
City of Huntington Beach
2000 Main Street
Huntington Beach, CA 92648
Tel:(714) 536-5291
Fax:(714) 374-1573
aferrigno@surfcity-hb.org
1st Advertise Date: 07/05/12 
2nd Advertise Date: 07/12/12 
Bid Due Date: 07/26/12 
Bid Due Time: 10:00 AM 
Project Duration: 260  Work Days
Liquidated Damages: $750.00 Per Calendar Day
Bid Bond Percentage: 10% 
Cost of Printed Plans & Specs: $90.00
Mandatory Pre Bid Conference Date: 07/17/12 
Pre Bid Conference Time : 10:00 AM 
Pre Bid Conference Location: City of HB Yard
8669 Edison Dr,
Huntington Beach, CA 92646. 
Project Description: PIPELINE REHABILITATION PROJECT: The work includes the rehabilitation of a 36-inch and 42-inch steel water transmission main. The 36-inch water main, constructed in 1964, is a 3/16-inch wall cement mortar lined and coated steel pipe, spanning 12,800 linear feet. Deficiencies in the water main include: undersized air and vacuum valves; pump out facilities which do not meet current City standards; access manholes which lack access vaults; aged interconnection valves; aged in-line valves; an inadequate number of cathodic protection test stations to test for electrical continuity; and electrically discontinuous pipe joints. The contractor will replace and add facilities, as shown on the plans and described in the specifications, in order to remediate these existing deficiencies. Bonding of electrically discontinuous pipe joints in the 36-inch water main shall be done internally. During the internal joint bonding, the interior lining of the 36-inch water main shall be inspected and repairs made as needed. The work on the 42-inch main includes external joint bonding, valve replacement, and upgrades to air vacuum valve assemblies and blow off assemblies. There is no internal joint bonding on the 42-inch pipeline. The City has procured materials which maybe used for the construction of this project. A complete inventory of these materials is provided within the project specification. The Contractor shall purchase the entire inventory from the City at a cost as determined by the Contractor within the project bid documents.

ARTERIAL STREET REHABILITATION PROJECT: The Arterial Street Rehabilitation for the entire stretch from Warner Avenue to Chinook Drive includes pavement rehabilitation in the south segments, a length of 1.0 miles, pavement maintenance in the middle segment, a length of 1.0 miles and pavement rehabilitation in the north segment, a length of 0.7 miles. Work on the south segment (1) Springdale Street, Warner Avenue to Edinger Avenue, will include grinding the existing pavement, removal of failed roadway sections, overlaying the street with asphalt concrete, limited replacement of concrete curb, gutter, and sidewalk and access ramps, adjustment to grade of manholes, survey monuments, utility and water valve assemblies, replacement of traffic loops and striping. Work on the middle segment (2) Springdale, Edinger Avenue to Bolsa Avenue, will include crack sealing and slurry seal, and shall not begin until both segment 1 and 3 are completed. Work on north segment (3) Springdale Street, Bolsa Avenue to Chinook Drive, will include the same rehabilitation treatments as the south segment.

STARTING ON JULY 5, 2012, HARD COPIES OF PLANS AND SPECIFICATIONS WILL BE AVAILABLE FOR PURCHASE FROM THE CITY. Copies of the Plans, Specifications, and contract documents are available from the Office of the Director of Public Works, 2000 Main Street, Huntington Beach, CA 92648, upon payment of a $90.00 nonrefundable fee if picked up, or payment of a $120.00 nonrefundable fee if sent by UPS ground delivery (bidder shall pay additional costs for special delivery). 
 
 Project Contacts





Currently there is not a Project Directory for this project.




 

 Docs / Specs
Click on a Document Name to download.
  Document Name Document Type Size Date Submitted 
  SPECIFICATIONS Plans and Specifications / Other 1100.3Kb 6/29/2012 

  APPENDIX A-G Plans and Specifications / Other 1623Kb 6/29/2012 

  APPENDIX P Plans and Specifications / Other 6307.6Kb 6/29/2012 

  APPENDIX Q Plans and Specifications / Other 9444.8Kb 6/29/2012 

  APPENDIX S Plans and Specifications / Other 28.9Kb 6/29/2012 

  APPENDIX T Plans and Specifications / Other 48Kb 6/29/2012 

  APPENDIX U Plans and Specifications / Other 1912.5Kb 6/29/2012 

  APPENDIX V Plans and Specifications / Other 1033.9Kb 6/29/2012 

  APPENDIX W Plans and Specifications / Other 33.8Kb 6/29/2012 

  SECTION C Plans and Specifications / Other 387.8Kb 6/29/2012 

  WATER 1 Plans and Specifications / Other 712.7Kb 6/29/2012 

  WATER 2 Plans and Specifications / Other 280.7Kb 6/29/2012 

  WATER 3 Plans and Specifications / Other 270.4Kb 6/29/2012 

  WATER 4 Plans and Specifications / Other 476.2Kb 6/29/2012 

  WATER 5 Plans and Specifications / Other 358.9Kb 6/29/2012 

  WATER 6 Plans and Specifications / Other 327.4Kb 6/29/2012 

  WATER 7 Plans and Specifications / Other 488.4Kb 6/29/2012 

  WATER 8 Plans and Specifications / Other 353.2Kb 6/29/2012 

  WATER 9 Plans and Specifications / Other 514.3Kb 6/29/2012 

  WATER 10 Plans and Specifications / Other 450.5Kb 6/29/2012 

  WATER 11 Plans and Specifications / Other 454.5Kb 6/29/2012 

  WATER 12 Plans and Specifications / Other 314.8Kb 6/29/2012 

  WATER 13 Plans and Specifications / Other 419.4Kb 6/29/2012 

  WATER 14 Plans and Specifications / Other 424.3Kb 6/29/2012 

  WATER 15 Plans and Specifications / Other 356Kb 6/29/2012 

  WATER 16 Plans and Specifications / Other 309.3Kb 6/29/2012 

  WATER 17 Plans and Specifications / Other 297.6Kb 6/29/2012 

  WATER 18 Plans and Specifications / Other 346.8Kb 6/29/2012 

  WATER 19 Plans and Specifications / Other 260.5Kb 6/29/2012 

  WATER 20 Plans and Specifications / Other 279.2Kb 6/29/2012 

  WATER 21 Plans and Specifications / Other 235.6Kb 6/29/2012 

  WATER 22 Plans and Specifications / Other 329.7Kb 6/29/2012 

  WATER 23 Plans and Specifications / Other 445.1Kb 6/29/2012 

  WATER 24 Plans and Specifications / Other 216Kb 6/29/2012 

  WATER 25 Plans and Specifications / Other 196.4Kb 6/29/2012 

  WATER 26 Plans and Specifications / Other 206.6Kb 6/29/2012 

  WATER 27 Plans and Specifications / Other 188Kb 6/29/2012 

  WATER 28 Plans and Specifications / Other 203.7Kb 6/29/2012 

  WATER 29 Plans and Specifications / Other 203.2Kb 6/29/2012 

  WATER 30 Plans and Specifications / Other 199.1Kb 6/29/2012 

  STREET 1 Plans and Specifications / Other 358.9Kb 6/29/2012 

  STREET 2 Plans and Specifications / Other 453.6Kb 6/29/2012 

  STREET 3 Plans and Specifications / Other 481.7Kb 6/29/2012 

  STREET 4 Plans and Specifications / Other 478.8Kb 6/29/2012 

  STREET 5 Plans and Specifications / Other 437.7Kb 6/29/2012 

  STREET 6 Plans and Specifications / Other 196.4Kb 6/29/2012 

  STREET 7 Plans and Specifications / Other 214.3Kb 6/29/2012 

  STREET 8 Plans and Specifications / Other 464.1Kb 6/29/2012 

  STREET 9 Plans and Specifications / Other 632.2Kb 6/29/2012 

  STREET 10 Plans and Specifications / Other 245Kb 6/29/2012 

  CC 1259 Steel Pipe Shops.pdf Plans and Specifications / Other 4930.9Kb 6/29/2012 
  Description: Only Available Online-Supplemental Info On Purchased Material Under Schedule A Item 49

  Addendum #1 Plans and Specifications / Other 13.4Kb 6/29/2012 
  Description: Addendum #1 issued on 6/29/12

  CC1330 Addendum -2.pdf Addenda 7Kb 7/5/2012 
  Description: Addendum #2

  CC 1330 SIGNING-STRIPING 1 OF 8.TIF Plans and Specifications / Other 454.9Kb 7/5/2012 
  Description: CC1330 Signing and Stripping Plan Sheet 1

  CC 1330 SIGNING-STRIPING 2 OF 8.TIF Plans and Specifications / Other 472.8Kb 7/5/2012 
  Description: CC1330 Signing and Stripping Plan Sheet 2

  CC 1330 SIGNING-STRIPING 3 OF 8.TIF Plans and Specifications / Other 405.9Kb 7/5/2012 
  Description: CC1330 Signing and Stripping Plan Sheet 3

  CC 1330 SIGNING-STRIPING 4 OF 8.TIF Plans and Specifications / Other 397.6Kb 7/5/2012 
  Description: CC1330 Signing and Stripping Plan Sheet 4

  CC 1330 SIGNING-STRIPING 5 OF 8.TIF Plans and Specifications / Other 433.5Kb 7/5/2012 
  Description: CC1330 Signing and Stripping Plan Sheet 5

  CC 1330 SIGNING-STRIPING 6 OF 8.TIF Plans and Specifications / Other 520.8Kb 7/5/2012 
  Description: CC1330 Signing and Stripping Plan Sheet 6

  CC 1330 SIGNING-STRIPING 7 OF 8.TIF Plans and Specifications / Other 455Kb 7/5/2012 
  Description: CC1330 Signing and Stripping Plan Sheet 7

  CC 1330 SIGNING-STRIPING 8 OF 8.TIF Plans and Specifications / Other 336.2Kb 7/5/2012 
  Description: CC1330 Signing and Stripping Plan Sheet 8

  CC1330 Addendum -3.pdf Addenda 203.4Kb 7/13/2012 
  Description: CC1330 - Addendum No. 3

  Pre Bid Meeting Minutes CC 1330 Plans and Specifications / Other 957.3Kb 7/17/2012 
  Description: This document contains the attendance sheet and the meeting minutes from the mandatory pre bid meeting held on 07-17-12.


Bid List Name:  SCHEDULE A, 36-INCH WATER REHABILITATION * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  1 REMOVE EXISTING AIR/VAC, INSTALL 4-INCH AIR/VAC ASSEMBLY. 6 EA    
  2 CONSTRUCT 8-INCH PUMP OUT ASSEMBLY. 1 EA    
  3 REPLACE EXISTING BLOW-OFF WITH 8-INCH PUMPOUT ASSEMBLY. 5 EA    
  4 CONSTRUCT 24-INCH ACCESS MANHOLE AND VAULT. 10 EA    
  5 CONSTRUCT VAULT AROUND EXISTING ACCESS MANHOLE. 1 EA    
  6 CONSTRUCT 36-INCH BUTTERFLY VALVE AT STA. 103+75.00. 1 LS    
  7 REMOVE EXISTING 24-INCH GATE VALVE AT STA. 0+44.00. 1 LS    
  8 REMOVE AND REPLACE 12-INCH RESILIENT WEDGE GATE VALVE. 14 EA    
  9 CONSTRUCT 12-INCH PVC CLASS 200 PIPE INTERCONNECTION AT THE PECK RESERVOIR 1 LS    
  10 REMOVE AND REPLACE 6-INCH RESILIENT WEDGE GATE VALVE. 1 EA    
  11 CONSTRUCT 12-INCH CUT-IN-VALVE ASSEMBLY. 5 EA    
  12 CONSTRUCT REINFORCED CONCRETE THRUST WALL. 4 EA    
  13 REMOVE AND REPLACE 30-INCH BUTTERFLY VALVE AT STA. 162+95.04. 1 LS    
  14 REMOVE EXISTING TEE AND GATE VALVE AND INSTALL 8-INCH PVC PIPE AT PRISCILLA DRIVE. 1 LS    
  15 REMOVE 12-INCH INTERCONNECT VALVE. INSTALL BLIND FLANGE AND BONDING CABLES ON NOZZLE. 2 EA    
  16 REMOVE 24-INCH BUTTERFLY VALVE. INSTALL 36-INCH BUTTERFLY VALVE AT AT STA. 64+50 1 LS    
  17 CONSTRUCT 4-INCH AIR/VAC ASSEMBLY. 3 EA    
  18 REMOVE EXISTING 30-INCH BUTTERFLY VALVE AT 1 LS    
  19 FILL EXISTING 8-INCH AC PIPE WITH 100 PSI CONTROLLED LOW STRENGTH FLOWABLE FILL AND ABANDON IN PLACE. 210 LF    
  20 REMOVE AND REPLACE EXISTING 20-INCH ACCESS MANHOLE HARDWARE. COAT EXISTING BLIND FLANGE AND INSTALL BONDING WIRES. 2 EA    
  21 REMOVE AND REPLACE EXISTING CONCRETE SIDEWALK. 2100 SF    
  22 REMOVE AND REPLACE EXISTING CONCRETE CURB AND GUTTER. 200 LF    
  23 REMOVE AND REPLACE EXISTING TRAFFIC CONTROL LOOPS 20 EA    
  24 INSTALL AIR/VAC VALVE ON EXISTING MANUAL AIR RELEASE. 1 EA    
  25 REMOVE 6-INCH INTERCONNECT VALVE. INSTALL BLIND FLANGE AND BONDING CABLES ON NOZZLE 1 EA    
  26 CONSTRUCT 12 X 8 TEE, AND CONNECTION FROM 12-INCH ACP TO 8-INCH ACP AT STA.. 103+43.35. 1 LS    
  27 CONSTRUCT 8-INCH CUT-IN VALVE ASSEMBLY. 1 EA    
  28 CONSTRUCT 36-INCH BUTTERFLY VALVE AT STA. 126+30.00. 1 LS    
  29 REMOVE 8-INCH INTERCONNECT VALVE. INSTALL BLIND FLANGE AND BONDING CABLES ON NOZZLE. 3 EA    
  30 CONSTRUCT 36-INCH BUTTERFLY VALVE AT STA. 126+50.00 1 LS    
  31 CONSTRUCT 12-INCH CLASS 350 DIP PIPE CONNECTION AT THE OCFCD CHANNEL CROSSING. 60 LF    
  32 REMOVE EXISTING TEE, GATE VALVE AND INTERCONNECTION PIPING. INSTALL 8-INCH PVC PIPE AT LARCHWOOD DRIVE 1 LS    
  33 REMOVE EXISTING TEE AND AC PIPE. REPLACE WITH 6-INCH PVC PIPE AT ROYALIST DRIVE 1 LS    
  34 REMOVE EXISTING 12-INCH GATE VALVE. INSTALL 12-INCH BLIND FLANGE ON EXISTING CROSS AT STA. 0+60.00. 1 LS    
  35 EXCAVATE AND INSPECT EXISTING VALVE CAN AND 1-INCH RISER 1 LS    
  36 REMOVE AND REPLACE EXISTING 16-INCH BUTTERFLY VALVE AT STA. 174+70.23 1 LS    
  37 INTERIOR ABANDONMENT OF EXISTING 20-INCH ACCESS MANHOLE AT STA. 7+51.00 1 LS    
  38 TRAFFIC CONTROL 1 LS    
  39 EXCAVATION, HANDLING, AND DISPOSAL OF CONTAMINATED SOIL. 100 CY    
  40 DEWATERING, STORAGE, TREATMENT AND DISPOSAL OF CONTAMINATED GROUNDWATER 650000 GAL    
  41 FLUSHING, PRESSURE TESTING, DISINFECTION, DECHLORINATION 1 LS    
  42 POTHOLING 50 EA    
  43 REMOVE EXISTING 14-INCH BLIND FLANGE AT STA. 62+77.00 OF 24-INCH WATERMAIN. INSTALL NEW EPOXY COATED BLIND FLANGE AND BONDING CABLES. 1 LS    
  44 PREPARATION AND IMPLEMENTATION OF OPERATION PLAN PER SPEC SECTION 300-2.2.E 1 LS    
  45 PREPARATION AND IMPLEMENTATION OF OPERATION PLAN PER SPEC SECTION 300-2.2.E 1 LS    
  46 INSTALL STANDARD 4-INCH STEEL COUPLING 5 EA    
  47 INSTALL INTERNAL BUTT STRAP, DETAIL 6 SHEET 18 5 EA    
  48 DEMOBILIZATION AND CLEAN-UP 1 LS    
  49 PURCHASE OF MATERIALS FROM CITY OF HUNTINGTON BEACH 1 LS    
   

Bid List Name:  SCHEDULE B, 36-INCH WATER CP RETRO FIT * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  1 MOBILIZATION 1 LS    
  2 INTERNAL JOINT BONDING OF EXISTING 36-INCH PIPELINE. 345 PJ    
  3 INSTALL TWO-WIRE CP TEST STATION. 2 EA    
  4 INSTALL INSULATING FLANGE AND FOUR-WIRE CP TEST STATION. 5 EA    
  5 CONSTRUCT SACRIFICIAL ANODE BED CONSISTING OF THREE 65 LB. MAGNESIUM ANODES 2 EA    
  6 CONSTRUCT 1-INCH BLOW-OFF ASSEMBLY. 4 EA    
  7 INSTALL BONDING CABLES ACROSS VALVES. 5 LOC    
  8 WELD ALL JOINTS BETWEEN STA 64+50 AND STA 64+70 INTERNALLY. 4 JNTS    
  9 CONSTRUCT DEEP WELL ANODE SYSTEM AND RECTIFIER. 2 EA    
  10 FIELD VERIFY LAP WELDED JOINTS INTERNALLY ON EXISTING 36-INCH WTM. 1762 LF    
  11 SCE ELECTRICAL SERVICE TO RECTIFIER STIES 2 EA    
  12 INSTALL INSULATING FLANGE AT PECK RESERVOIR PRESSURE REDUCING STATION. 4 EA    
  13 INSTALL INSULATING FLANGE ON 36-INCH PECK RESERVOIR BOOSTER STATION HEADER. 1 LS    
   

Bid List Name:  SCHEDULE C, ARTERIAL STREET REHABILITATION * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  1 CONSTRUCT CURB ACCESS RAMP PER CALTRANS STD. PLAN A88A OR A88B AND MODIFIED AS SHOWN ON PLAN. 12 EA    
  2 INSTALL TRUNCATED DOMES TO EXISTING CURB ACCESS RAMP PER CALTRANS STD. PLAN A88A OR A88B. 4 EA    
  3 CONSTRUCT A 0.17' ASPHALT RUBBER HOT MIX (ARHM) WET PROCESS OVERLAY ACROSS THE ENTIRE ROADWAY SURFACE. 8520 TN    
  4 CONSTRUCT TYPE II SLURRY (RPMS) WITH BLACK ROCK TYPE 2 AGGREGATE 428500 SF    
  5 ADJUST OCSD SEWER MANHOLE TO MATCH NEW FINISHED SURFACE, PER OCSD STD. PLANS S-053, S-054 & S-055. 11 EA    
  6 ADJUST SEWER MANHOLE TO MATCH NEW FINISHED SURFACE. 26 EA    
  7 FURNISH AND INSTALL ZEBRON OR SANCON 13 EA    
  8 ADJUST STORM DRAIN MANHOLE TO MATCH NEW FINISHED SURFACE. 7 EA    
  9 ADJUST WATER VALVE AND BOX TO MATCH NEW FINISHED SURFACE. 103 EA    
  10 ADJUST WATER MANHOLE TO MATCH NEW FINISHED SURFACE. 6 EA    
  11 REPLACE WATER METER BOX WITH CITY FURNISHED FRAME AND COVER, AND MATCH NEW FINISHED SURFACE. 3 EA    
  12 REMOVE EXISTING A.C. TO DEPTH 1.05' PER TYPICAL SECTION ON SHEET 2. (RE: CONST. NOTE 8) 695 CY    
  13 REMOVE EXISTING A.C. TO A MAXIMUM DEPTH OF 0.88' PER TYPICAL SECTION ON SHEET 2. 2095 CY    
  14 REMOVE EXISTING A.C. TO DEPTH OF 0.92' PER TYPICAL SECTION ON SHEET 2. 1470 CY    
  15 REMOVE EXISTING A.C. TO DEPTH OF 0.83' PER TYPICAL SECTION ON SHEET 2. 195 CY    
  16 CONSTRUCT A.C. BASE COURSE (0.88') B-PG 70-10-RAP (RE: CONST. NOTES 8,8A,8B,8C) 8325 TN    
  17 REMOVE EXISTING A.C. TO DEPTH OF 0.88' BELOW FINISHED GRADE PER TYPICAL SECTION ON SHEET 2. 825 CY    
  18 CONSTRUCT A.C. BASE COURSE (0.88') B-PG 70-10-RAP (RE: CONST. NOTE 8D) 1185 TN    
  19 CONSTRUCT A.C. BASE COURSE (0.34') B-PG 70-10-RAP (RE: CONST. NOTE 12) 235 TN    
  20 FURNISH AND INSTALL BRIDGE DECK MEMBRANE OVER THE ENTIRE BRIDGE DECK SURFACE 9260 SF    
  21 REMOVE EXISTING, FURNISH AND INSTALL NEW TRAFFIC PULL BOX PER CALTRANS STD. ES-8 & HB STD. PLAN 422 6 EA    
  22 INSTALL NEW DETECTOR LOOPS PER CITY STANDARD SPECIAL PROVISIONS FOR THE CONSTRUCTION OF TRAFFIC SIGNALS 69 EA    
  23 COLD MILL (0.34') PER TYPICAL SECTION ON SHEET 2 (ITEM INCLUDES DISPOSAL OF FABRIC) (RE: CONST. NOTE 12) 9260 SF    
  24 COLD MILL (0.21') PER TYPICAL SECTION ON SHEET 2 (ITEM INCLUDES DISPOSAL OF FABRIC) (RE: CONST. NOTES 12A,12B,12C) 538035 SF    
  25 CONSTRUCT A.C. LEVELING COURSE (0.21'), (0.17') AND (0.25') B-PG 70-10-RAP OVER EXISTING A.C. PER DETAIL SHEET 2. 8200 TN    
  26 ADJUST SURVEY MONUMENT WELL TO NEW FINISHED SURFACE 2 EA    
  27 REMOVE AND RECONSTRUCT CURB AND GUTTER PER HB STD. PLAN 202 (CF=8). 6360 LF    
  28 REMOVE AND CONSTRUCT MEDIAN CURB (CF=8" FROM FINISHED A.C. SURFACE) TYPE B-1 PER HB STD. PLAN NO. 201 100 SF    
  29 REMOVE AND CONSTRUCT MEDIAN CURB (CF=6" FROM FINISHED A.C. SURFACE) TYPE B-1 PER HB STD. PLAN NO. 201 1680 LF    
  30 REMOVE AND RECONSTRUCT SIDEWALK PER HB STD. PLAN 207 AND MODIFIED AS SHOWN ON PLAN. 45860 SF    
  31 REMOVE AND CONSTRUCT STAMPED MEDIAN CONCRETE PER HB STD. PLAN 711. (ITEM INCLUDES EXCAVATION AND/OR FILL) 15300 SF    
  32 REMOVE AND RECONSTRUCTION CURB AND CROSS-GUTTER PER HB STD. PLAN 205. 3470 SF    
  33 REMOVE AND RECONSTRUCT LOCAL DEPRESSION PER HB STD. PLAN 302. (ITEM INCLUDES SLOT PAVEMENT AND AGGREGATE BASE) 230 SF    
  34 REMOVE AND RECONSTRUCT RESIDENTIAL DRIVEWAY APPROACH PER HB STD. PLAN 209. 780 SF    
  35 REMOVE AND RECONSTRUCT RESIDENTIAL DRIVEWAY APPROACH PER HB STD. PLAN 209. 2120 SF    
  36 REMOVE EXISTING TREE AND GRIND STUMP TO 24 BELOW TOP OF SIDEWALK/GRADE. 44 EA    
  37 PROTECT AND PROVIDE 30" X 30" BLOCK OUT FOR TRAFFIC SIGNAL POLE TO BE ADJUSTED TO MATCH NEW FINISHED SURFACE BY CITY. 2 EA    
  38 SAWCUT, REMOVE AND REPLACE CONCRETE WALK WITH CURB ON PRIVATE PROPERTY WITH NEW SIDEWALK PER HB STD. 140 SF    
  39 FURNISH AND INSTALL 2 SCHEDULE 40 CONDUIT WITH PULL ROPE AND 30" OF COVER. 650 LF    
  40 FURNISH AND INSTALL 2-2 SCHEDULE 40 CONDUIT WITH PULL ROPE AND 36" OF COVER. 150 LF    
  41 FURNISH AND INSTALL 3 SCHEDULE 40 CONDUIT WITH PULL ROPE AND 36" OF COVER 100 LF    
  42 FURNISH AND INSTALL #5 PULL BOX PER CALTRANS STD. ES-8 7 EA    
  43 FURNISH AND INSTALL #6 PULL BOX PER CALTRANS STD. ES-8 & THE CITY'S STANDARD 2 EA    
  44 MOBILIZATION 1 LS    
  45 TRAFFIC CONTROL PLAN 1 LS    
  46 FURNISH PROJECT TRAFFIC CONTROL 1 LS    
  47 TRAFFIC STRIPING 1 LS    
   

 CSI Codes 
  No CSI Codes Specified. 

 Q&A 




No questions or answers have been posted to this site.




 

 Plan Holders
List Last Updated: 7/24/2012 3:08:04 PM


Organization/Division
Type
Contact Name
Address  Phone  Fax 
Abhe & Svoboda, Inc 
General Contractor
880 Tavern Rd 
Alpine, CA 91901
91901
Abhe & Svoboda, Inc. 
General Contractor
Dan Markwell
880 Tavern Rd 
Alpine, CA 91901
(619) 659-1320
AGC Plan Room 
Plan Room / Service
4355 Ruffin Road Suite 103 
San Diego, CA 92123
(858) 874-8560 (858) 874-8569
all american asphalt 
General Contractor
debbie matsen
400 e sixth street 
corona, CA 92879
(951) 736-7600
American Asphalt South 
Subcontractor
Lyle Stone
14436 Santa Ana Avenue 
Fontana, CA 92337
(909) 427-8276 (909) 427-8279
American Fence Company 
Temporary Facilities
Dave Klatch
8312 Allport Ave 
Santa Fe Springs, CA 90670
(562) 941-3478 (562) 941-0757
Bid America 
Plan Room / Service
Plan Room
41085 Elm Street 
Murrieta, CA 92562
(951) 572-3379 (951) 600-0615
Bidnet 
Other
Rebecca Burnham
20a Railroad Ave 
Albany, NY 12205
(800) 677-1997
Bieber Enterprise 
Subcontractor
Ron Bieber
18755 Fairfax Ln 
Huntington Beach, CA 92648
(714) 843-5192 (714) 843-5194
Blois Construction, Inc. 
General Contractor
3201 Sturgis Road 
Oxnard, CA 93030
(805) 656-1432 x19 (805) 485-0338
C.T. & F., Inc. 
Estimating 
Subcontractor
Mark Garcia
7228 Scout Ave 
Bell Gardens, CA 90201
(562) 927-2339 x241 (562) 927-4171
Case Land Surveying, Inc. 
Surveyor / Civil Engineer
Larry Case
614 N Eckhoff Street 
Orange, CA 92868
(714) 628-8948 (714) 628-8905
CCL Contracting Inc 
General Contractor
Bryan Lusky
1938 Don Lee Place 
Escondido, CA 92029
(760) 743-2254 (760) 743-7251
CCL Contracting, Inc. 
General Contractor
Bryan Lusky
1938 Don Lee Place 
Escondido, CA 92029
(760) 743-2254 (760) 743-7251
Charles King Company, Inc 
General Contractor
Kelly Broughton
2841 Gardena Ave 
Signal Hill, CA 90755
(562) 426-2974 (562) 426-9714
Contractor's Info Network 
Plan Room / Service
4420 Hotel Circle Ct Ste 215 
San Diego, CA 92108
(559) 325-7054 (619) 688-0585
Corrpro Companies Inc 
Subcontractor
Christopher Tsutsui
10260 Matern Place 
Santa Fe Springs, CA 90670
(562) 944-1636 x260234 (562) 946-5634
Dahl, Taylor & Associates, Inc. 
General Contractor
Chris Flores
2960 Daimler Street 
Santa Ana, CA 92701
(949) 756-8654 (949) 502-0777
E J Meyer Company 
General Contractor
Mark Meyer
26999 5th St 
Highland, CA 92346-4207
(909) 425-4025 (909) 425-4020
E.J. MEYER COMPANY 
General Contractor
PO BOX 277 
HIGHLAND, CA 92346
(909) 425-4025 (909) 425-4020
Excel Paving Co. 
General Contractor
Crissa Phillips
2230 Lemon Ave 
PO Box 16405 
Long Beach, CA 90806-5195
(562) 599-5841 (562) 591-7485
F. W. Dodge 
Plan Room / Service
Adriana Cruz
1475 South State College Bl 
Suite112 
Anaheim, CA 92806
(714) 687-0895 (714) 687-5967
HB Digital 
Plan Room / Service
Domenic Iorfino
 
Huntington Beach, CA 
(714) 960-3298 (714) 536-3939
Hydroquip Dewatering Corp. 
Subcontractor
Jerry King
9355 Stewart and Gray Rd 
Downey, CA 90241
(562) 921-1768 (562) 923-5162
iSqFt. 
Plan Room / Service
1065 University Avenue 
San Diego, CA 92103
(800) 364-2059 (866) 570-8187
J. Fletcher Creamer & Son, Inc. 
General Contractor
Bree Scott
12874 San Fernando Rd 
Sylmar, CA 91342
(818) 741-1144 (818) 367-9749
J.A. Salazar Construction & Supply Corp 
General Contractor
Jose Salazar
613 N Harbor Blvd 
La Habra, CA 90631
(562) 691-3647 (562) 691-1092
KANA PIPELINE, INC. 
General Contractor
MARK BAUL
1639 E. MIRALOMA AVENUE 
PLACENTIA, CA 92870
(714) 986-1400
L.H. Woods & Sons, Inc. 
General Contractor
Mike Ireland
2115 La Mirada Drive 
Vista, CA 92081
(760) 599-5500 x217 (760) 599-5510
L.H. Woods and Sons, Inc. 
General Contractor
Michael Ireland
2115 La MIrada Drive 
Vista, CA 92081
(760) 599-5500 (760) 599-5510
Lone Rock 
Not Specified
Dragan Marjanovic
26 Vista Firenze 
Laguna Hills, CA 92653
(949) 310-0804 (949) 458-8301
McGraw Hill Construction Dodge -MR 
Planroom 
Plan Room / Service
1333 Mayflower Ave 
Monrovia, CA 91016
(626) 932-6181 (626) 932-6153
Mike Bubalo Construction Co. 
General Contractor
Anton Brkic
5102 Gayhurst Ave 
Baldwin Park, CA 91706-1814
(626) 960-7787 (626) 960-7897
Mike Prlich and Sons inc 
General Contractor
Michael Prlich
5103 Elton Street 
Baldwin Pak, CA 91706
(626) 813-1700 (626) 813-1770
Minco Construction 
General Contractor
John Farag
522 E Airline Way 
Gardena, CA 90248
(310) 516-8100 (310) 516-7404
Mission Paving and Sealing, Inc. 
Subcontractor
12747 Schabarum Ave 
Irwindale, CA 91706
(626) 452-8200
Mladen Buntich Construction Co., Inc. 
General Contractor
Scott Peterson
1500 W 9th St 
Upland, CA 91786
(909) 920-9977 (909) 920-9905
Mladen Buntich Construction, Co., Inc. 
General Contractor
Michael Bollinger
1500 West 9th Street 
Upland, CA 91786
(909) 920-9977 (909) 920-9905
MSL Electric, Inc. 
Subcontractor
Warren Moore
4938 E La Palma Avenue 
Anaheim, CA 92807
(714) 693-4837 (714) 693-4838
Nobest Inc 
General Contractor
7600 Acacia Ave 
Garden Grove, CA 92841
(714) 892-5583 (714) 373-0039
OC Winwater Works 
Supplier / Vendor
Loren Galati
2030 East Walnut Ave 
Fullerton, CA 92831
(714) 996-6299 (714) 996-1599
PAVEMENT COATINGS CO 
Subcontractor
10240 San Sevaine Way 
Mira Loma, CA 91752
(714) 826-3011
R J Noble 
General Contractor
15505 E Lincoln Ave 
Orange, CA 92865-1015
(714) 637-1550 (714) 637-6321
Reed Construction Data 
Plan Room / Service
30 Technology Parkway South 
Suite 500 
Norcross, GA 30092-2912
(800) 876-4045 (800) 642-2437
Schiff Associates 
Subcontractor
Sebastian Borucki
431 WBaseline Rd 
Claremont, CA 91711
(909) 626-0967 (909) 626-3316
Spiniello Companies 
General Contractor
Priscilla Moynier
1441 E 9th Street 
Pomona, CA 91766
(909) 629-1000 (512) 233-5313
Spiniello Companies 
Other
1441 East Ninth St 
Pomona, CA 91766
(909) 629-1000 (909) 629-1114
STEVE BUBALO CONSTRUCTION COMPANY 
General Contractor
NOEL MOORE
PO BOX 1048 
MONROVIA, CA 91017
(626) 574-7570 (626) 574-7642
SULLY MILLER 
General Contractor
RAY SANCHEZ
135 SOUTH STATE COLLEGE BLVD SUITE 400 
BREA, CA 92821
(714) 578-9600
Superior Pavement Markings  
General Contractor
Darren Veltz
14658 Industry Circle 
La Mirada, CA 90638
(714) 562-9100
Tomovich & Associates 
General Contractor
926 Durfee Ave 
South El Monte, CA 91733-4498
(626) 443-3627 (626) 579-9686
Traffic Loops Crackfilling, Inc. 
Subcontractor
Ramiro Rivero
946 S Emerald Street 
Anaheim, CA 92804
(714) 520-4026 (714) 520-4027
Twining, Inc. 
Geotechnical Engineer
Roger Schlierkamp
2883 E Spring St Suite 300 
Long Beach, CA 90806
(562) 426-3355
USS Cal Builders 
General Contractor
Eric Othman
8051 Main St 
Stanton, CA 90680
(714) 828-4882 (714) 828-9498
VCI Construction, Inc. 
General Contractor
Joe Claveau
1921 W 11th St 
Upland, CA 91786
(909) 946-0905 (909) 946-0924
Vido Artukovich & Son Inc 
General Contractor
Vido Artukovich
11155 Rush Street 
South El Monte, CA 91733
(626) 444-4286 (626) 444-3989
W.A. Rasic Construction 
Not Specified
Walter Rasic
4150 Long Beach Blvd 
Long Beach, CA 90807
(562) 928-6111 (562) 928-7339
Wells Supply Co. 
Construction Manager
Chris Blasco
1313 E Hunter Avenue 
Santa Ana, CA 92705
(714) 542-0711 (714) 542-4570
Western Water Works Supply Company 
Supplier / Vendor
Eric Loudon
5831 Pine Ave 
Chino Hills, CA 91709
(909) 597-7000 (909) 597-7050
Xylem Dewatering Solutions Inc. (dba Godwin Pumps of America) 
Subcontractor
Peter Kogler
11161 Harrel Street 
Mira Loma, CA 91752
(562) 522-1133