Project |
Project Number |
City  |
State |
Bid Due Date |
Estimated Cost |
Project Name: Delivery of Aggregate Base, Sand, and Gravel
Description:
** QUESTION DEADLINE: 7-29-22 @ 4 PM **
The Public Works Utilities Division uses backfill materials for scheduled and unscheduled projects. Materials are ordered on an as needed basis. There no fixed amounts ordered on an annual basis.
|
2022-0810 |
HUNTINGTON BEACH |
CA |
08/10/22 4:00 PM |
$0 |
Project Name: Palm Avenue Street Light Modification Project
Description:
Install New Street Light Poles, conduit, and circuitry. Remove Existing Street Lights and Restore Surroundings.
|
CC-1669 |
HUNTINGTON BEACH |
CA |
08/16/22 2:00 PM |
$0 to $415,000 |
Project Name: Utica Avenue Bicycle Boulevard, CC-1499
Description:
Installation of bicycle boulevard signage and
roadway markings, constructing a bicycle and
pedestrian only passage through an area of two
non-connecting street segments separated by a
block wall, and installation of a new traffic
signal at the intersection of Lake St/Utica Ave
including construction of curb ramps.
|
CC1499 |
City of Huntington Beach |
CA |
08/30/22 2:00 PM |
$0 to $526,000 |
|