Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: North Fremont Bike and Pedestrian Access and Safety Improvements Project
Description: In general, the work consists of, but is not
limited to: demolition of existing
improvements, construction of Class IV bike
lanes, sidewalk, median modifications, shared
bicycle/bus lane, ADA upgrades, signal
modifications, and conforming new
improvements to existing site conditions on
North Fremont Boulevard.
1012318-0048 Monterey CA BID CLOSED
03/13/18
2:00 PM
$7,554,531 to $7,554,531
Project Name: Citywide Street Resurfacing (Slurry), Phase 6
Description: In general, the work consists of, but is
not limited to, pavement spot repair of
approximately 225,000 SF, crack
sealing, placing of approximately 750,000
SF of slurry seal, associated striping
removal and replacement,
refreshing of existing painted street
markings, traffic control and installation
of necessary environmental pollution...
Monterey CA BID CLOSED
04/10/18
2:00 PM
$2,200,000
Project Name: Presidio of Monterey Building 652 Floor Covering Replacement
Description: In general, the work consists of, but is not limited to, the removal and recycling
of existing VCT floor covering and associated cove base, concrete floor preparation and installation of approximately 15,550 SF of new 18x18x1/8, commercial grade, Endura sculptured surface rubber tile, by Burke Flooring, or approved equal and approximately 495...
DPW-17045 Monterey CA BID CLOSED
03/27/18
2:00 PM
$253,342