Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: City Hall Reception and Clerk’s Office Remodel (WFC017) and 8401 Laguna Palms Way Remodel (WFC032) Projects
Description: The City Hall Reception and Clerk’s Office Remodel (WFC017) Project, located on the first floor of the building, includes the demolition of the existing reception area, construction of a new reception desk, demolition in the Clerk’s Office, and construction of a new wall with a transaction window. The 8401 Laguna Palms Way Remodel (WFC032) Project ...
WFC017/WFC032 Elk Grove CA 01/08/19
10:00 AM
$372,000
Project Name: Real Time Information Center Project Phase 2 (FM1705)
Description: The proposed Work shall be performed in accordance with the plans, specifications, appendices, and other Contract Documents and shall include but not be limited to the following: procurement and installation of a sixteen (16) foot video wall, display processor and audio digital signal processor controller with appropriate volume and source control ...
FM1705 Elk Grove CA 01/10/19
10:00 AM
$250,000