Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: AVALON TANK HILLSIDE SLOPE EROSION PROTECTION, Job 21126
Description: The work to be done consists of removal and off-site disposal of sloughed sediment/soils from hillside slopes and v-ditches around the tank; removal of existing geotextile, anchorage, and sandbags, installation of new geotextile material and anchorage over bare soils with existing soil nails; and warranty of the erosion control measures for a conti...
Job 21126 Fremont CA BID CLOSED
07/22/19
2:00 PM
$180,000 to $200,000