Project Name: 11th Street and Peralta Street Storm Drain Extension
Description: The work, located on 11th and Peralta
Streets, involves the upgrading of two
sections of existing 18-inch storm drain
with 24-inch HDPE storm drain pipe. Where
the new alignment conflicts, the existing
storm drain will be removed, and other
sections are to be abandoned in place. The
existing 4” CI water line in the same
section of 1...
2018-001 Guadalupe CA 05/02/18
2:00 PM
$300,000 to $400,000