Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: Boulder Mountain Reservoirs 1 and 2 Rehabilitation Project
Description: The Work involves furnishing all labor, equipment and materials necessary to install guardrail, ladders, center vent, auxiliary vent, lateral bracing modifications, fall restraint system, inlet/outlet modifications, overflow modifications, rafter repairs, cathodic protection system, interior coating removal, recoating, exterior paint removal, and e...
Bid #19-010 Poway CA 10/23/18
4:00 PM
$588,000
Project Name: Washwater 1 Tank Rehabilitation Project
Description: The Work involves furnishing all labor, equipment and materials necessary to install center vent, auxiliary vent and solar fan, lateral bracing modifications, fall restraint system, inlet/outlet modifications, overflow modifications, catch basin, davit arm assemblies, rafter repairs, cathodic protection system, interior coating removal, recoating, ...
Bid #19-009 Poway CA 10/23/18
3:00 PM
$230,900