Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: Beaumont MDP Line 16, Stage 50 Recharge Basin Feeder
Description: IF YOU DOWNLOAD THE FILES FROM EBIDBOARD
YOU DO NOT NEED TO PURCHASE THE DOCUMENTS
FROM THE DISTRICT.

In partnership with Beaumont Cherry Valley
Water District (BCVWD) the project will
collect dry-weather and stormwater flows
into an underground storm drain system and
convey such waters to BCVWD's existing
water conservation rechar...
5-0-00201-50 Unincorporated Cherry Valley CA 06/16/21
2:00 PM
$6,635,831 to $6,635,831
Project Name: Palm Springs MDP Line 41, Stage 3 and Stage 4
Description: IF YOU DOWNLOAD THE FILES FROM EBIDBOARD YOU
DO NOT NEED TO PURCHASE THE DOCUMENTS FROM
THE DISTRICT.

Construct approximately 6,800 lineal feet of
underground storm drain system and a
detention basin.
6-00160 Palm Springs CA 05/26/21
2:00 PM
$12,438,288 to $12,438,288