Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: 11th Street and Peralta Street Storm Drain Extension
Description: The work, located on 11th and Peralta
Streets, involves the upgrading of two
sections of existing 18-inch storm drain
with 24-inch HDPE storm drain pipe. Where
the new alignment conflicts, the existing
storm drain will be removed, and other
sections are to be abandoned in place. The
existing 4 CI water line in the same
section of 1...
2018-001 Guadalupe CA 05/02/18
2:00 PM
$300,000 to $400,000