Click the Project Name to view details. Click the column labels to sort.
projects per page page 1 of 1
Project Project Number City State Bid Due Date Estimated Cost
Project Name: Annual Resurfacing 2021 - Phase 1, Flower Circle Reconstruction
Description: Flower Circle reconstruction is phase 1 of
the City’s Annual Street Project. Flower
Circle a residential street of
approximately 800’ long and 31’ wide. The
work includes, but not limited to;
Installation of ADA compliant curb ramps,
conform curb, gutter, and sidewalk,
pulverizing existing asphalt concrete
pavement and full depth re...
1041221-0104 Marina CA 05/04/21
2:00 PM
$300,000 to $400,000