Bid Results

OIL POD STRUCTURE AT SHAFTER-WASCO SANITARY LANDFILL

19129 


 
Show Bid Items
Show Listed Subcontractors
  go

General Contractor:  Superior Construction
4241 EBrundage Lane
Bakersfield, CA  93307 
  Bidder Status: Valid
 
Total Bid Amount:  $134,634.00 * marks an allowance.
  Bid List Name   Bid List Total    
  OIL POD STRUCTURE AT SHAFTER-WASCO SANITARY LANDFILL $134,634.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 TEMPORARY TRAFFIC CONTROL 1 LS $1,823.00   $1,823.00    
  2 PREPARE WATER POLLUTION CONTROL PLAN 1 LS $3,040.00   $3,040.00    
  3 CLEARING AND GRUBBING 1 LS $1,825.00   $1,825.00    
  4 DEVELOP WATER SUPPLY 1 LS $2,190.00   $2,190.00    
  5 ROADWAY EXCAVATION (F) 3 CY $245.00   $735.00    
  6 IMPORTED BORROW (F) 215 CY $14.80   $3,182.00    
  7 FINISHING ROADWAY 1 LS $21,200.00   $21,200.00    
  8 HOT MIX ASPHALT (TYPE A) 160 TN $205.00   $32,800.00    
  9 ROADSIDE SIGN - ONE POST 1 EA $365.00   $365.00    
  10 THERMOPLASTIC PAVEMENT MARKING 27 SQFT $56.00   $1,512.00    
  11 PAINT TRAFFIC STRIPE (2-COAT) 180 LF $8.40   $1,512.00    
  12 BOLLARD 5 EA $610.00   $3,050.00    
  13 MANUFACTURED OIL POD STRUCTURE, CONCRETE PAD AND FOUNDATION 1 LS $55,030.00   $55,030.00    
  14 INSTALL OIL POD TANK 2 EA $915.00   $1,830.00    
  15 MOBILIZATION 1 LS $4,540.00   $4,540.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Asphalt Doctor
AC Paving Striping  -   

General Contractor:  JTS Construction
7001 McDivitt Dr Ste B
Bakersfield, CA  93313 
  Bidder Status: Valid
 
Total Bid Amount:  $159,500.00 * marks an allowance.
  Bid List Name   Bid List Total    
  OIL POD STRUCTURE AT SHAFTER-WASCO SANITARY LANDFILL $159,500.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 TEMPORARY TRAFFIC CONTROL 1 LS $2,500.00   $2,500.00    
  2 PREPARE WATER POLLUTION CONTROL PLAN 1 LS $2,000.00   $2,000.00    
  3 CLEARING AND GRUBBING 1 LS $2,000.00   $2,000.00    
  4 DEVELOP WATER SUPPLY 1 LS $1,500.00   $1,500.00    
  5 ROADWAY EXCAVATION (F) 3 CY $1,700.00   $5,100.00    
  6 IMPORTED BORROW (F) 215 CY $35.00   $7,525.00    
  7 FINISHING ROADWAY 1 LS $9,800.00   $9,800.00    
  8 HOT MIX ASPHALT (TYPE A) 160 TN $225.00   $36,000.00    
  9 ROADSIDE SIGN - ONE POST 1 EA $425.00   $425.00    
  10 THERMOPLASTIC PAVEMENT MARKING 27 SQFT $16.00   $432.00    
  11 PAINT TRAFFIC STRIPE (2-COAT) 180 LF $2.00   $360.00    
  12 BOLLARD 5 EA $890.00   $4,450.00    
  13 MANUFACTURED OIL POD STRUCTURE, CONCRETE PAD AND FOUNDATION 1 LS $76,000.00   $76,000.00    
  14 INSTALL OIL POD TANK 2 EA $1,900.00   $3,800.00    
  15 MOBILIZATION 1 LS $7,608.00   $7,608.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  American West
P O Box 71175
Bakersfield, CA  93380 
Grading  -   
  Diversified Construction Solutions, Inc.
P O Box 81563
Bakersfield, CA  93380 
Asphalt  -   

General Contractor:  Papich Construction
398 Sunrise Terrace
Arroyo Grande, CA  93420 
  Bidder Status: Valid
 
Total Bid Amount:  $199,000.00 * marks an allowance.
  Bid List Name   Bid List Total    
  OIL POD STRUCTURE AT SHAFTER-WASCO SANITARY LANDFILL $199,000.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 TEMPORARY TRAFFIC CONTROL 1 LS $1,300.00   $1,300.00    
  2 PREPARE WATER POLLUTION CONTROL PLAN 1 LS $1,000.00   $1,000.00    
  3 CLEARING AND GRUBBING 1 LS $2,500.00   $2,500.00    
  4 DEVELOP WATER SUPPLY 1 LS $600.00   $600.00    
  5 ROADWAY EXCAVATION (F) 3 CY $1,200.00   $3,600.00    
  6 IMPORTED BORROW (F) 215 CY $100.00   $21,500.00    
  7 FINISHING ROADWAY 1 LS $6,000.00   $6,000.00    
  8 HOT MIX ASPHALT (TYPE A) 160 TN $205.00   $32,800.00    
  9 ROADSIDE SIGN - ONE POST 1 EA $800.00   $800.00    
  10 THERMOPLASTIC PAVEMENT MARKING 27 SQFT $12.00   $324.00    
  11 PAINT TRAFFIC STRIPE (2-COAT) 180 LF $12.00   $2,160.00    
  12 BOLLARD 5 EA $2,400.00   $12,000.00    
  13 MANUFACTURED OIL POD STRUCTURE, CONCRETE PAD AND FOUNDATION 1 LS $68,000.00   $68,000.00    
  14 INSTALL OIL POD TANK 2 EA $3,500.00   $7,000.00    
  15 MOBILIZATION 1 LS $39,416.00   $39,416.00