Bid Results

Traffic Signal on Fairfax Road at Zephyr Lane

19140 - 3000-RC00096 


 
Show Bid Items
Show Listed Subcontractors
  go

General Contractor:  CEN-CAL Construction
34762 lencioni ave
Bakersfield, CA  93308 
  Bidder Status: Valid
 
Total Bid Amount:  $440,910.50 * marks an allowance.
  Bid List Name   Bid List Total    
  Traffic Signal on Fairfax Road at Zephyr Lane $440,910.50  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 LEAD COMPLIANCE PLAN 1 LS $933.00   $933.00    
  2 DEVELOP WATER SUPPLY 1 LS $1,706.00   $1,706.00    
  3 TEMPORARY TRAFFIC CONTROL 1 LS $46,048.00   $46,048.00    
  4 PREPARE WATER POLLUTION CONTROL PROGRAM 1 LS $6,298.00   $6,298.00    
  5 REMOVE CONCRETE (F) 26 CY $262.00   $6,812.00    
  6 CLEARING AND GRUBBING 1 LS $3,187.00   $3,187.00    
  7 ROADWAY EXCAVATION (F) 70 CY $316.00   $22,120.00    
  8 REPAIR EXISTING LANDSCAPING 1 LS $2,188.00   $2,188.00    
  9 FINISHING ROADWAY 1 LS $5,203.00   $5,203.00    
  10 CLASS 2 AGGREGATE BASE 22 CY $357.00   $7,854.00    
  11 HOT MIX ASPHALT (TYPE A) 90 TN $262.00   $23,580.00    
  12 PLACE HOT MIX ASPHALT DIKE (TYPE A) 10 LF $109.00   $1,090.00    
  13 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) 90 SQYD $54.00   $4,860.00    
  14 MINOR CONCRETE (CURB AND GUTTER) 200 LF $46.00   $9,200.00    
  15 MINOR CONCRETE (DRIVEWAY) 9 CY $537.00   $4,833.00    
  16 MINOR CONCRETE (DRIVE APPROACH) 9 CY $537.00   $4,833.00    
  17 MINOR CONCRETE (SIDEWALK) 8 CY $467.00   $3,736.00    
  18 MINOR CONCRETE (CURB RAMP) (F) 4 CY $1,592.00   $6,368.00    
  19 RELOCATE MAILBOX 1 EA $525.00   $525.00    
  20 RECONSTRUCT FENCE AND GATE 50 LF $87.00   $4,350.00    
  21 SALVAGE ROADSIDE SIGN 2 EA $508.00   $1,016.00    
  22 THERMOPLASTIC PAVEMENT MARKING 560 SQFT $7.20   $4,032.00    
  23 PAIN TRAFFIC STRIPE (2-COAT) 2,090 LF $1.35   $2,821.50    
  24 REMOVE PAINTED TRAFFIC STRIPE 1,800 LF $1.55   $2,790.00    
  25 REMOVE PAINTED PAVEMENT MARKING 340 SQFT $5.80   $1,972.00    
  26 SIGNAL AND LIGHTING SYSTEM 1 LS $238,000.00   $238,000.00    
  27 MOBILIZATION 1 LS $24,555.00   $24,555.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Union Fence of Kern County
3501 Mallview Rd
Bakersfield, CA  93301 
20p  -   
  Loop Electric Inc.
7040 Downing Avenue
Bakersfield, CA  93308 
26p  -   
  Traffic Loops & Crackfilling
946 S Emerald Street
Anaheim, CA 
26p  -   
  Austin Enterprise
13421 Snow Rd
Bakersfield, CA  93314 
5p, 7p  -   
  Griffith Company
1128 Carrier Parkway Avenue
Bakersfield, CA  93308 
11p, 12p, 13p, 27p  -   
  Harker Striping and Signage
16010 Tradition Ct
Bakersfield, CA  93314 
3p, 22p, 23p, 24p, 25p, 27p  -   

General Contractor:  Sturgeon Electric California, LLC.
13501 Benson Ave
Chino, CA  91710 
  Bidder Status: Valid
 
Total Bid Amount:  $461,681.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Traffic Signal on Fairfax Road at Zephyr Lane $461,681.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 LEAD COMPLIANCE PLAN 1 LS $2,500.00   $2,500.00    
  2 DEVELOP WATER SUPPLY 1 LS $4,000.00   $4,000.00    
  3 TEMPORARY TRAFFIC CONTROL 1 LS $27,300.00   $27,300.00    
  4 PREPARE WATER POLLUTION CONTROL PROGRAM 1 LS $2,500.00   $2,500.00    
  5 REMOVE CONCRETE (F) 26 CY $375.00   $9,750.00    
  6 CLEARING AND GRUBBING 1 LS $6,700.00   $6,700.00    
  7 ROADWAY EXCAVATION (F) 70 CY $330.00   $23,100.00    
  8 REPAIR EXISTING LANDSCAPING 1 LS $3,015.00   $3,015.00    
  9 FINISHING ROADWAY 1 LS $4,335.00   $4,335.00    
  10 CLASS 2 AGGREGATE BASE 22 CY $390.00   $8,580.00    
  11 HOT MIX ASPHALT (TYPE A) 90 TN $245.00   $22,050.00    
  12 PLACE HOT MIX ASPHALT DIKE (TYPE A) 10 LF $73.00   $730.00    
  13 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) 90 SQYD $35.00   $3,150.00    
  14 MINOR CONCRETE (CURB AND GUTTER) 200 LF $75.00   $15,000.00    
  15 MINOR CONCRETE (DRIVEWAY) 9 CY $784.00   $7,056.00    
  16 MINOR CONCRETE (DRIVE APPROACH) 9 CY $784.00   $7,056.00    
  17 MINOR CONCRETE (SIDEWALK) 8 CY $909.00   $7,272.00    
  18 MINOR CONCRETE (CURB RAMP) (F) 4 CY $1,800.00   $7,200.00    
  19 RELOCATE MAILBOX 1 EA $455.00   $455.00    
  20 RECONSTRUCT FENCE AND GATE 50 LF $205.00   $10,250.00    
  21 SALVAGE ROADSIDE SIGN 2 EA $138.00   $276.00    
  22 THERMOPLASTIC PAVEMENT MARKING 560 SQFT $13.60   $7,616.00    
  23 PAIN TRAFFIC STRIPE (2-COAT) 2,090 LF $3.80   $7,942.00    
  24 REMOVE PAINTED TRAFFIC STRIPE 1,800 LF $5.70   $10,260.00    
  25 REMOVE PAINTED PAVEMENT MARKING 340 SQFT $5.70   $1,938.00    
  26 SIGNAL AND LIGHTING SYSTEM 1 LS $221,650.00   $221,650.00    
  27 MOBILIZATION 1 LS $40,000.00   $40,000.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  super seal and stripe
310 a st
fillmore , CA  93015 
3, 23-25  -   
  Loop Electric Inc.
7040 Downing Avenue
Bakersfield, CA  93308 
26p  -   
  Traffic Loops & Crackfilling
946 S Emerald Street
Anaheim, CA 
26p  -   
  Griffith Company
1128 Carrier Parkway Avenue
Bakersfield, CA  93308 
5-8, 10-18, 27p  -   
  Yukon Fence Co, Inc
2810 Case St
Bakersfield
Bakersfield, CA  93312 
49-50  -   
  Avila Traffic Safety
PO Box 2221
Atascadero, CA  93422 
3p, 21p  -   

General Contractor:  Granite Construction
3005 James Rd
Bakersfield, CA  93308 
  Bidder Status: Valid
 
Total Bid Amount:  $558,975.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Traffic Signal on Fairfax Road at Zephyr Lane $558,975.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 LEAD COMPLIANCE PLAN 1 LS $3,000.00   $3,000.00    
  2 DEVELOP WATER SUPPLY 1 LS $1,000.00   $1,000.00    
  3 TEMPORARY TRAFFIC CONTROL 1 LS $40,000.00   $40,000.00    
  4 PREPARE WATER POLLUTION CONTROL PROGRAM 1 LS $1,000.00   $1,000.00    
  5 REMOVE CONCRETE (F) 26 CY $1,490.00   $38,740.00    
  6 CLEARING AND GRUBBING 1 LS $1,500.00   $1,500.00    
  7 ROADWAY EXCAVATION (F) 70 CY $1,500.00   $105,000.00    
  8 REPAIR EXISTING LANDSCAPING 1 LS $1,000.00   $1,000.00    
  9 FINISHING ROADWAY 1 LS $1,500.00   $1,500.00    
  10 CLASS 2 AGGREGATE BASE 22 CY $250.00   $5,500.00    
  11 HOT MIX ASPHALT (TYPE A) 90 TN $220.00   $19,800.00    
  12 PLACE HOT MIX ASPHALT DIKE (TYPE A) 10 LF $150.00   $1,500.00    
  13 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) 90 SQYD $12.00   $1,080.00    
  14 MINOR CONCRETE (CURB AND GUTTER) 200 LF $80.00   $16,000.00    
  15 MINOR CONCRETE (DRIVEWAY) 9 CY $1,300.00   $11,700.00    
  16 MINOR CONCRETE (DRIVE APPROACH) 9 CY $1,300.00   $11,700.00    
  17 MINOR CONCRETE (SIDEWALK) 8 CY $1,300.00   $10,400.00    
  18 MINOR CONCRETE (CURB RAMP) (F) 4 CY $1,500.00   $6,000.00    
  19 RELOCATE MAILBOX 1 EA $1,000.00   $1,000.00    
  20 RECONSTRUCT FENCE AND GATE 50 LF $120.00   $6,000.00    
  21 SALVAGE ROADSIDE SIGN 2 EA $200.00   $400.00    
  22 THERMOPLASTIC PAVEMENT MARKING 560 SQFT $7.00   $3,920.00    
  23 PAIN TRAFFIC STRIPE (2-COAT) 2,090 LF $1.50   $3,135.00    
  24 REMOVE PAINTED TRAFFIC STRIPE 1,800 LF $3.00   $5,400.00    
  25 REMOVE PAINTED PAVEMENT MARKING 340 SQFT $5.00   $1,700.00    
  26 SIGNAL AND LIGHTING SYSTEM 1 LS $210,000.00   $210,000.00    
  27 MOBILIZATION 1 LS $51,000.00   $51,000.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Loop Electric Inc.
7040 Downing Avenue
Bakersfield, CA  93308 
26  -   
  super seal and stripe
310 a st
fillmore , CA  93015 
1p, 21-25, 27p  -   
  Force Traffic Control, Inc.
PO Box 1107
Exeter, CA  93221 
3p  -