General Contractor:  Marina Landscape Inc.
3707 W Garden Grove
Orange, CA  92868 
  Bidder Status: Valid
 
Total Bid Amount:  $202,106.10 * marks an allowance.
  Bid List Name   Bid List Total    
  LANDSCAPING IMPROVEMENTS ON OSWELL STREET FROM COLLEGE AVENUE TO KENT DRIVE $202,106.10  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 CLEARING AND GRUBBING 1 LS $10,000.00   $10,000.00    
  2 EXISTING TREE REMOVAL 6 EA $1,000.00   $6,000.00    
  3 EXISTING SHRUB REMOVAL 1 EA $700.00   $700.00    
  4 1" WATER METER 1 EA $500.00   $500.00    
  5 6 STATION SOLAR POWERED CONTROLLER 1 EA $2,000.00   $2,000.00    
  6 POLE MOUNTED RAIN SENSOR W/VANDAL RESISTANT ENCLOSURE 1 EA $1,000.00   $1,000.00    
  7 1"RP BACKFLOW PREVENTOR ASSEMBLY WITH ENCLOSURE AND INSULATING COVER 1 EA $3,000.00   $3,000.00    
  8 1" MASTER CONTROL VALVE 1 EA $500.00   $500.00    
  9 10 GALLON FERTIFATION UNIT ASSEMBLY WITH VALVE BOX 1 EA $3,000.00   $3,000.00    
  10 1 1/4" GATE VALVE ASSEMBLY WITH VALVE BOX 1 EA $100.00   $100.00    
  11 1" DRIP VALVE ASSEMBLY WITH VALVE BOX 5 EE $300.00   $1,500.00    
  12 1" QUICK COUPLER ASSEMBLY WITH VALVE BOX 8 LF $200.00   $1,600.00    
  13 1 1/4" SCH 40 PVC MAINLINE 857 LF $9.00   $7,713.00    
  14 1" SCH 40 PVC LATERAL LINES 20 LF $4.50   $90.00    
  15 1" UVR SCH 40 LATERALS 20 LF $4.00   $80.00    
  16 3/4" SCH 40 PVC LATERAL LINES 40 LF $4.50   $180.00    
  17 3/4" UVR SCH 40 PVC LATERAL LINES 500 LF $4.00   $2,000.00    
  18 1" SCH 40 PVC SLEEVING 12 LF $150.00   $1,800.00    
  19 2" SCH 40 PVC SLEEVING 60 LF $150.00   $9,000.00    
  20 2 1/2" SCH 40 PVC SLEEVING 60 LF $150.00   $9,000.00    
  21 CONTROL WIRE - 12AWG 880 LF $0.25   $220.00    
  22 CONTROL WIRE - 14AWG 3,270 LF $0.20   $654.00    
  23 IRRIGATION DRIP LINE 3,356 LF $1.50   $5,034.00    
  24 DRIP SYSTEM FLUSH VALVE ASSEMBLY 10 EA $50.00   $500.00    
  25 DRIP SYSTEM OPERATOR INDICATOR 5 E $20.00   $100.00    
  26 3M DBY/RG WIRE CONNECTORS 14 E $3.00   $42.00    
  27 MOISTURE SENSOR ASSEMBLY 2 E $250.00   $500.00    
  28 TREE IRRIGATION DRIP LINE CIRCLES 300 LF $3.00   $900.00    
  29 LOOSE RIVER ROCK COBBLE 4,280 SF $6.00   $25,680.00    
  30 GROUTED RIVER ROCK COBBLE 1,936 SF $17.00   $32,912.00    
  31 WEED ABATEMENT 17,963 SF $0.10   $1,796.30    
  32 SOIL PREPARATION 8,643 SF $0.50   $4,321.50    
  33 15 GALLON TREE 12 EA $190.00   $2,280.00    
  34 5 GALLON SHRUB 202 EA $25.00   $5,050.00    
  35 1 GALLON SHRUB 20 EA $8.00   $160.00    
  36 FINE GRADING 14,859 SF $0.20   $2,971.80    
  37 JUTTE MESH INSTALLATION 8,643 SF $0.50   $4,321.50    
  38 CONCRETE CURB 44 LF $100.00   $4,400.00    
  39 MAINTENANCE PERIOD 1 LS $3,000.00   $3,000.00    
  40 PREPARE WATER POLLUTION PREVENTION CONTROL PROGRAM 1 LS $3,000.00   $3,000.00    
  41 FINISHING PROJECT 1 LS $3,000.00   $3,000.00    
  42 DEVELOP WATER SUPPLY 1 LS $3,000.00   $3,000.00    
  43 TEMPORARY TRAFFIC CONTROL 1 LS $18,500.00   $18,500.00    
  44 MOBILIZATION 1 LS $20,000.00   $20,000.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Bullseye Boring
915 DOUGLAS ST.
CALIMESA, CA  92320 
19, 20  -   

General Contractor:  CEN-CAL Construction
34762 Lencioni Ave
Bakersfield, CA  93308 
  Bidder Status: Valid
 
Total Bid Amount:  $237,399.10 * marks an allowance.
  Bid List Name   Bid List Total    
  LANDSCAPING IMPROVEMENTS ON OSWELL STREET FROM COLLEGE AVENUE TO KENT DRIVE $237,399.10  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 CLEARING AND GRUBBING 1 LS $22,925.00   $22,925.00    
  2 EXISTING TREE REMOVAL 6 EA $5,610.00   $33,660.00    
  3 EXISTING SHRUB REMOVAL 1 EA $7,180.00   $7,180.00    
  4 1" WATER METER 1 EA $1,985.00   $1,985.00    
  5 6 STATION SOLAR POWERED CONTROLLER 1 EA $613.00   $613.00    
  6 POLE MOUNTED RAIN SENSOR W/VANDAL RESISTANT ENCLOSURE 1 EA $409.00   $409.00    
  7 1"RP BACKFLOW PREVENTOR ASSEMBLY WITH ENCLOSURE AND INSULATING COVER 1 EA $3,620.00   $3,620.00    
  8 1" MASTER CONTROL VALVE 1 EA $526.00   $526.00    
  9 10 GALLON FERTIFATION UNIT ASSEMBLY WITH VALVE BOX 1 EA $1,402.00   $1,402.00    
  10 1 1/4" GATE VALVE ASSEMBLY WITH VALVE BOX 1 EA $234.00   $234.00    
  11 1" DRIP VALVE ASSEMBLY WITH VALVE BOX 5 EE $234.00   $1,170.00    
  12 1" QUICK COUPLER ASSEMBLY WITH VALVE BOX 8 LF $176.00   $1,408.00    
  13 1 1/4" SCH 40 PVC MAINLINE 857 LF $9.50   $8,141.50    
  14 1" SCH 40 PVC LATERAL LINES 20 LF $7.00   $140.00    
  15 1" UVR SCH 40 LATERALS 20 LF $9.00   $180.00    
  16 3/4" SCH 40 PVC LATERAL LINES 40 LF $7.00   $280.00    
  17 3/4" UVR SCH 40 PVC LATERAL LINES 500 LF $7.00   $3,500.00    
  18 1" SCH 40 PVC SLEEVING 12 LF $5.00   $60.00    
  19 2" SCH 40 PVC SLEEVING 60 LF $7.00   $420.00    
  20 2 1/2" SCH 40 PVC SLEEVING 60 LF $9.00   $540.00    
  21 CONTROL WIRE - 12AWG 880 LF $2.00   $1,760.00    
  22 CONTROL WIRE - 14AWG 3,270 LF $1.00   $3,270.00    
  23 IRRIGATION DRIP LINE 3,356 LF $2.00   $6,712.00    
  24 DRIP SYSTEM FLUSH VALVE ASSEMBLY 10 EA $176.00   $1,760.00    
  25 DRIP SYSTEM OPERATOR INDICATOR 5 E $41.00   $205.00    
  26 3M DBY/RG WIRE CONNECTORS 14 E $6.00   $84.00    
  27 MOISTURE SENSOR ASSEMBLY 2 E $176.00   $352.00    
  28 TREE IRRIGATION DRIP LINE CIRCLES 300 LF $5.00   $1,500.00    
  29 LOOSE RIVER ROCK COBBLE 4,280 SF $7.00   $29,960.00    
  30 GROUTED RIVER ROCK COBBLE 1,936 SF $18.00   $34,848.00    
  31 WEED ABATEMENT 17,963 SF $0.30   $5,388.90    
  32 SOIL PREPARATION 8,643 SF $0.40   $3,457.20    
  33 15 GALLON TREE 12 EA $251.00   $3,012.00    
  34 5 GALLON SHRUB 202 EA $42.00   $8,484.00    
  35 1 GALLON SHRUB 20 EA $11.00   $220.00    
  36 FINE GRADING 14,859 SF $0.15   $2,228.85    
  37 JUTTE MESH INSTALLATION 8,643 SF $0.60   $5,185.80    
  38 CONCRETE CURB 44 LF $51.25   $2,255.00    
  39 MAINTENANCE PERIOD 1 LS $2,336.00   $2,336.00    
  40 PREPARE WATER POLLUTION PREVENTION CONTROL PROGRAM 1 LS $6,160.00   $6,160.00    
  41 FINISHING PROJECT 1 LS $5,110.00   $5,110.00    
  42 DEVELOP WATER SUPPLY 1 LS $1,175.00   $1,175.00    
  43 TEMPORARY TRAFFIC CONTROL 1 LS $14,975.00   $14,975.00    
  44 MOBILIZATION 1 LS $8,566.85   $8,566.85    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Loop Electric Inc.
7040 Downing Avenue
Bakersfield, CA  93308 
1  -   
  GENERAL TREE SERVICE
4811 KIMBER AVE
BAKERSFIELD, CA  93307 
2  -   
  Huffco Inc
Bakersfield, CA 