Bid Results

Wilson III Basin Project-Phase 1B Wilson Creek Erosion Control Measure

10879 


 
Show Bid Items
Show Listed Subcontractors
  go

General Contractor:  LB3 Enterprises Inc.
12485 Highway 67
Pad 3
LAKESIDE
LAKESIDE, CA  92040 
  Bidder Status: Valid
 
Total Bid Amount:  $1,204,177.73 * marks an allowance.
  Bid List Name   Bid List Total    
  Wilson III Basin Phase 1B $1,204,177.73  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 MOBILIZATION/TRAFFIC CONTROL 1 LS $36,251.00   $36,251.00    
  2 CONSTRUCT 1/2 TON NON-GROUTED RIPRAP 6,200 CY $8.78   $54,436.00    
  3 CONSTRUCT 1 TON GROUTED RIPRAP 12,400 CY $29.45   $365,180.00    
  4 CONSTRUCT 1 TON NON-GROUTED RIPRAP 4,500 CY $8.66   $38,970.00    
  5 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2,900 CY $57.20   $165,880.00    
  6 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8,580 SY $3.19   $27,370.20    
  7 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 (ADD PVC CONNECTIONS) 490 LF $116.00   $56,840.00    
  8 N/A INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 860 LF $96.11   $82,654.60    
  9 CONSTRUCT MAINENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL SHEET 22 & 23 7,320 SF $29.43   $215,427.60    
  10 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH TRAIL ENTRANCE BARRIER PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 5 EA $5,799.91   $28,999.55    
  11 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA $15,245.49   $30,490.98    
  12 REMOVAL OF EXISTING CURB,GUTTER AND SIDEWALK 1 LS $21,171.98   $21,171.98    
  13 CONSTRUCT CHANNEL CONNECTION-LINE "C" 1 LS $73,650.73   $73,650.73    
  14 N/A RIP-RAP IMPORT 3 CY $2,285.03   $6,855.09    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Crimson Maria Company
 -   
  Lopez Structures
 -   

General Contractor:  Jeremy Harris Construction, Inc.
11731 Sterling Ave Suite F
Riverside, CA  92503 
  Bidder Status: Valid
 
Total Bid Amount:  $1,638,797.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Wilson III Basin Phase 1B $1,638,797.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 MOBILIZATION/TRAFFIC CONTROL 1 LS $25,000.00   $25,000.00    
  2 CONSTRUCT 1/2 TON NON-GROUTED RIPRAP 6,200 CY $27.00   $167,400.00    
  3 CONSTRUCT 1 TON GROUTED RIPRAP 12,400 CY $65.85   $816,540.00    
  4 CONSTRUCT 1 TON NON-GROUTED RIPRAP 4,500 CY $27.48   $123,660.00    
  5 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2,900 CY $67.24   $194,996.00    
  6 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8,580 SY $3.85   $33,033.00    
  7 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 (ADD PVC CONNECTIONS) 490 LF $54.40   $26,656.00    
  8 N/A INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 860 LF $106.15   $91,289.00    
  9 CONSTRUCT MAINENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL SHEET 22 & 23 7,320 SF $6.60   $48,312.00    
  10 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH TRAIL ENTRANCE BARRIER PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 5 EA $5,247.00   $26,235.00    
  11 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA $7,667.00   $15,334.00    
  12 REMOVAL OF EXISTING CURB,GUTTER AND SIDEWALK 1 LS $2,772.00   $2,772.00    
  13 CONSTRUCT CHANNEL CONNECTION-LINE "C" 1 LS $66,250.00   $66,250.00    
  14 N/A RIP-RAP IMPORT 3 CY $440.00   $1,320.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Lopez Construction
901 E 3rd Street Ste A1
Corona, CA  92879 
 -   
  Incompli
 -   
  hi-desert plan room
15353 anacapa road
victorville, CA  92392 
 -   
  Robertsons
200 s main st
corona, CA  92882 
 -   

General Contractor:  Wright Construction Engineering Corp
2625 S Sante Fe Avenue
San Marcos, CA  92069 
  Bidder Status: Valid
 
Total Bid Amount:  $1,650,000.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Wilson III Basin Phase 1B $1,650,000.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 MOBILIZATION/TRAFFIC CONTROL 1 LS $49,000.00   $49,000.00    
  2 CONSTRUCT 1/2 TON NON-GROUTED RIPRAP 6,200 CY $17.00   $105,400.00    
  3 CONSTRUCT 1 TON GROUTED RIPRAP 12,400 CY $61.00   $756,400.00    
  4 CONSTRUCT 1 TON NON-GROUTED RIPRAP 4,500 CY $17.00   $76,500.00    
  5 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2,900 CY $48.00   $139,200.00    
  6 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8,580 SY $3.50   $30,030.00    
  7 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 (ADD PVC CONNECTIONS) 490 LF $85.00   $41,650.00    
  8 N/A INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 860 LF $142.00   $122,120.00    
  9 CONSTRUCT MAINENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL SHEET 22 & 23 7,320 SF $12.50   $91,500.00    
  10 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH TRAIL ENTRANCE BARRIER PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 5 EA $10,000.00   $50,000.00    
  11 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA $20,000.00   $40,000.00    
  12 REMOVAL OF EXISTING CURB,GUTTER AND SIDEWALK 1 LS $7,500.00   $7,500.00    
  13 CONSTRUCT CHANNEL CONNECTION-LINE "C" 1 LS $138,450.00   $138,450.00    
  14 N/A RIP-RAP IMPORT 3 CY $750.00   $2,250.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Econo Fence Inc
5261 Pedley Rd
Riverside, CA  92509 
 -   

General Contractor:  Bert W. Salas, Inc.
10769 Woodside Ave Suite 201
Santee, CA  92071 
  Bidder Status: Valid
 
Total Bid Amount:  $1,993,095.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Wilson III Basin Phase 1B $1,993,095.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 MOBILIZATION/TRAFFIC CONTROL 1 LS $57,800.00   $57,800.00    
  2 CONSTRUCT 1/2 TON NON-GROUTED RIPRAP 6,200 CY $34.00   $210,800.00    
  3 CONSTRUCT 1 TON GROUTED RIPRAP 12,400 CY $66.00   $818,400.00    
  4 CONSTRUCT 1 TON NON-GROUTED RIPRAP 4,500 CY $34.00   $153,000.00    
  5 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2,900 CY $50.00   $145,000.00    
  6 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8,580 SY $3.00   $25,740.00    
  7 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 (ADD PVC CONNECTIONS) 490 LF $51.00   $24,990.00    
  8 N/A INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 860 LF $266.00   $228,760.00    
  9 CONSTRUCT MAINENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL SHEET 22 & 23 7,320 SF $16.50   $120,780.00    
  10 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH TRAIL ENTRANCE BARRIER PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 5 EA $6,395.00   $31,975.00    
  11 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA $10,000.00   $20,000.00    
  12 REMOVAL OF EXISTING CURB,GUTTER AND SIDEWALK 1 LS $4,000.00   $4,000.00    
  13 CONSTRUCT CHANNEL CONNECTION-LINE "C" 1 LS $149,000.00   $149,000.00    
  14 N/A RIP-RAP IMPORT 3 CY $950.00   $2,850.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  FenceCorp
 -   
  Southwest V-Ditch, inc.
3625 Placentia Lane
Riverside, CA  92501 
 -   
  Solid Structures, Inc.
PO Box 848
La Mesa, CA  91944 
 -   

General Contractor:  Vance Corporation
2271 N Locust Avenue
Rialto, CA  92377 
  Bidder Status: Valid
 
Total Bid Amount:  $2,186,560.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Wilson III Basin Phase 1B $2,186,560.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 MOBILIZATION/TRAFFIC CONTROL 1 LS $175,000.00   $175,000.00    
  2 CONSTRUCT 1/2 TON NON-GROUTED RIPRAP 6,200 CY $35.00   $217,000.00    
  3 CONSTRUCT 1 TON GROUTED RIPRAP 12,400 CY $85.00   $1,054,000.00    
  4 CONSTRUCT 1 TON NON-GROUTED RIPRAP 4,500 CY $35.00   $157,500.00    
  5 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2,900 CY $50.00   $145,000.00    
  6 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8,580 SY $4.00   $34,320.00    
  7 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 (ADD PVC CONNECTIONS) 490 LF $40.00   $19,600.00    
  8 N/A INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 860 LF $215.00   $184,900.00    
  9 CONSTRUCT MAINENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL SHEET 22 & 23 7,320 SF $7.00   $51,240.00    
  10 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH TRAIL ENTRANCE BARRIER PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 5 EA $6,000.00   $30,000.00    
  11 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA $15,000.00   $30,000.00    
  12 REMOVAL OF EXISTING CURB,GUTTER AND SIDEWALK 1 LS $5,000.00   $5,000.00    
  13 CONSTRUCT CHANNEL CONNECTION-LINE "C" 1 LS $80,000.00   $80,000.00    
  14 N/A RIP-RAP IMPORT 3 CY $1,000.00   $3,000.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  cmb construction
7201 haven ave e-287
alta loma, CA  91701 
 -   
  FenceCorp
 -   
  EBS General Engineering, Inc
1345 Quarry Street Ste 101
Corona, CA  92879 
 -   
  Southwest V-Ditch, inc.
3625 Placentia Lane
Riverside, CA  92501 
 -   

General Contractor:  KEC Engineering
200 N Sherman Ave
Corona, CA  92882 
  Bidder Status: Valid
 
Total Bid Amount:  $2,452,321.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Wilson III Basin Phase 1B $2,452,321.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 MOBILIZATION/TRAFFIC CONTROL 1 LS $20,000.00   $20,000.00    
  2 CONSTRUCT 1/2 TON NON-GROUTED RIPRAP 6,200 CY $48.00   $297,600.00    
  3 CONSTRUCT 1 TON GROUTED RIPRAP 12,400 CY $105.00   $1,302,000.00    
  4 CONSTRUCT 1 TON NON-GROUTED RIPRAP 4,500 CY $40.00   $180,000.00    
  5 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2,900 CY $56.00   $162,400.00    
  6 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8,580 SY $2.70   $23,166.00    
  7 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 (ADD PVC CONNECTIONS) 490 LF $37.00   $18,130.00    
  8 N/A INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 860 LF $261.00   $224,460.00    
  9 CONSTRUCT MAINENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL SHEET 22 & 23 7,320 SF $9.70   $71,004.00    
  10 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH TRAIL ENTRANCE BARRIER PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 5 EA $7,280.00   $36,400.00    
  11 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA $9,900.00   $19,800.00    
  12 REMOVAL OF EXISTING CURB,GUTTER AND SIDEWALK 1 LS $3,800.00   $3,800.00    
  13 CONSTRUCT CHANNEL CONNECTION-LINE "C" 1 LS $93,000.00   $93,000.00    
  14 N/A RIP-RAP IMPORT 3 CY $187.00   $561.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  FenceCorp
 -   

General Contractor:  Los Angeles Engineering Inc. 2
633 N Barranca Ave
Covina, CA  91723 
  Bidder Status: Valid
 
Total Bid Amount:  $2,867,000.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Wilson III Basin Phase 1B $2,867,000.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 MOBILIZATION/TRAFFIC CONTROL 1 LS $84,340.00   $84,340.00    
  2 CONSTRUCT 1/2 TON NON-GROUTED RIPRAP 6,200 CY $112.00   $694,400.00    
  3 CONSTRUCT 1 TON GROUTED RIPRAP 12,400 CY $95.00   $1,178,000.00    
  4 CONSTRUCT 1 TON NON-GROUTED RIPRAP 4,500 CY $40.00   $180,000.00    
  5 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2,900 CY $80.00   $232,000.00    
  6 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8,580 SY $4.00   $34,320.00    
  7 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 (ADD PVC CONNECTIONS) 490 LF $40.00   $19,600.00    
  8 N/A INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 860 LF $145.00   $124,700.00    
  9 CONSTRUCT MAINENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL SHEET 22 & 23 7,320 SF $12.00   $87,840.00    
  10 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH TRAIL ENTRANCE BARRIER PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 5 EA $10,500.00   $52,500.00    
  11 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA $5,550.00   $11,100.00    
  12 REMOVAL OF EXISTING CURB,GUTTER AND SIDEWALK 1 LS $3,300.00   $3,300.00    
  13 CONSTRUCT CHANNEL CONNECTION-LINE "C" 1 LS $164,000.00   $164,000.00    
  14 N/A RIP-RAP IMPORT 3 CY $300.00   $900.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  Lopez Construction
901 E 3rd Street Ste A1
Corona, CA  92879 
 -   
  Econo Fence Inc
5261 Pedley Rd
Riverside, CA  92509 
 -   
  Southwest V-Ditch, inc.
3625 Placentia Lane
Riverside, CA  92501 
 -   

General Contractor:  Granite Construction Company
38000 Monroe Street
Indio, CA  92203 
  Bidder Status: Valid
 
Total Bid Amount:  $3,337,333.00 * marks an allowance.
  Bid List Name   Bid List Total    
  Wilson III Basin Phase 1B $3,337,333.00  
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
Unit Price   Item Total    
  1 MOBILIZATION/TRAFFIC CONTROL 1 LS $90,000.00   $90,000.00    
  2 CONSTRUCT 1/2 TON NON-GROUTED RIPRAP 6,200 CY $55.00   $341,000.00    
  3 CONSTRUCT 1 TON GROUTED RIPRAP 12,400 CY $140.00   $1,736,000.00    
  4 CONSTRUCT 1 TON NON-GROUTED RIPRAP 4,500 CY $37.00   $166,500.00    
  5 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2,900 CY $97.00   $281,300.00    
  6 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8,580 SY $7.00   $60,060.00    
  7 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 (ADD PVC CONNECTIONS) 490 LF $75.00   $36,750.00    
  8 N/A INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 860 LF $215.00   $184,900.00    
  9 CONSTRUCT MAINENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL SHEET 22 & 23 7,320 SF $16.00   $117,120.00    
  10 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH TRAIL ENTRANCE BARRIER PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 5 EA $6,000.00   $30,000.00    
  11 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA $12,000.00   $24,000.00    
  12 REMOVAL OF EXISTING CURB,GUTTER AND SIDEWALK 1 LS $4,700.00   $4,700.00    
  13 CONSTRUCT CHANNEL CONNECTION-LINE "C" 1 LS $254,503.00   $254,503.00    
  14 N/A RIP-RAP IMPORT 3 CY $3,500.00   $10,500.00    
  Listed Subcontractors   Description of Work   Listing Amount   Percent of Contract   License No - Expiration    
  FenceCorp
 -   
  Southwest V-Ditch, inc.
3625 Placentia Lane
Riverside, CA  92501 
 -