WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL


19115/8993-SHA-16/17 

Project Name: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL
Project Type:
Engineering/Civil
Ownership: Public
Project City, State: SHAFTER-WASCO, California
Local District: 4
Engineer's Estimated Cost: $592,075 
Pre-Qualification for Bidders: Not Required
License Type Required: A
Project/Contract Number: 19115/8993-SHA-16/17
Project Contact: Nicole Parker
County of Kern
Public Works Department
2700 M Street
Suite 400
Bakersfield, CA 93301
Tel:(661) 862-8890
Fax:(661) 862-8851
parkern@kerncounty.com
1st Advertise Date: 03/18/19 
Bid Due Date: 04/17/19 
Bid Due Time: 11:00 AM 
Project Duration: 100  Work Days
Liquidated Damages: $2,500.00 Per Calendar Day
Bid Bond Percentage: 10% 
Project Description: The work to be performed consists, in general, of constructing a concrete foundation and installing a turbine pump, motor, piping, storage tank, and booster pump station for existing well. 
 
 Project Contacts





Currently there is not a Project Directory for this project.




 Docs / Specs
Register as a Document Holder to receive notifications about this opportunity.

Click on a Document Name to download.
  Document Name Document Type Size Date Submitted 
  19115 - Bid Documents.pdf Plans and Specifications / Other 848.4Kb 3/14/2019 

  19115 - Bid Envelope Label - Optional.pdf Plans and Specifications / Other 2576.5Kb 3/14/2019 

  19115 - Special Provision.pdf Plans and Specifications / Other 3041Kb 3/14/2019 

  19115 - Plans.pdf Plans and Specifications / Other 35711.6Kb 3/14/2019 

  19115 - Sign in.pdf Plans and Specifications / Other 690.9Kb 3/28/2019 
  Description: Sign In Sheet

  19115 - Waiver.pdf Plans and Specifications / Other 776.2Kb 3/28/2019 
  Description: Waiver Form

  19115 - Soils Report.pdf Plans and Specifications / Other 1641.4Kb 4/1/2019 
  Description: 19115 - Soils Report

  Contract No. 19115- Addendum No. 1.pdf Addenda 2978.7Kb 4/9/2019 

 Bid Items

Bid List Name:  Water system improvements at Shafter-Wasco Recycling and Sanitary Landfill * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  1 MOBILIZATION, DEMOBILIZATION, AND CLEAN-UP 1 LS    
  2 SITE EARTHWORK INCLUDING OVER-EXCAVATION FOR STRUCTURES AND FINE GRADING 1 LS    
  3 GRAVEL RING FOUNDATION 1 LS    
  4 30’ DIAMETER X 12’ TALL AWWA D103 BOLTED STEEL TANK, APPURTENANCES & CONNECTIONS 1 LS    
  5 DEEP WELL CONCRETE FOUNDATION 1 LS    
  6 VERTICAL TURBINE PUMP ASSEMBLY 1 LS    
  7 VERTICAL HOLLOWSHAFT ELECTRIC MOTOR 1 LS    
  8 WELL DISCHARGE PIPING AND APPURTENANCES 1 LS    
  9 HORIZONTAL CENTRIFUGAL SPLIT CASE BOOSTER PUMP AND MOTOR INCLUDING CONCRETE FOUNDATION 2 EA    
  10 BOOSTER PUMP STATION PIPING AND APPURTENANCES 1 LS    
  11 J-STAND PIPING, CONCRETE ENCASEMENT, AND APPURTENANCES 1 LS    
  12 SITE GROUND COVER 1 LS    
  13 CONCRETE FOUNDATION AND ELECTRICAL SHADE STRUCTURE 1 LS    
  14 SYSTEM PAINTING 1 LS    
  15 ELECTRICAL, CONTROLS, AND INSTRUMENTATION 1 LS    
   
 CSI Code
  No CSI Codes Specified. 
 Q&A
Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Chlorinated water" Posted by:Posted Anonymously
Q: Can we dispose of chlorinated water on site? 04/12/19
10:35:29 AM
A: See special provision section 6-1.02, section 7-1.07, section 7-1.14 04/12/19
10:35:29 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Import fill" Posted by:Posted Anonymously
Q: If import fill is required can it be obtained from the landfill site and if so will there be a cost? 04/12/19
10:28:46 AM
A: See special provision section 8-3.2.3 04/12/19
10:28:46 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Building permit" Posted by:Posted Anonymously
Q: What is the cost of a building permit? 04/12/19
10:27:47 AM
A: See special provision section 8-1.2A, you can contact Building and Code Division at (661) 862-5100. 04/12/19
10:27:47 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "PG&E Service" Posted by:Posted Anonymously
Q: Details show PG&E transformer pad and PG&E Guard Post. Sheet 2 & 20 shows there is an existing 800A metered panel. Can you confirm no new service is part of this bid package? 04/04/19
9:04:01 AM
A: No new service is required. 04/04/19
9:04:01 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Wiring" Posted by:Posted Anonymously
Q: The MCC elevation detail shows symbols for 3 types of wiring devices. One seems to be a duplex receptacle and the other two are some type of specialty receptacles. Can you confirm the types of wiring devices and location? 04/04/19
9:02:50 AM
A: A single duplex receptacle fed from the LP is all that is required. 04/04/19
9:02:50 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "MCC Elevation" Posted by:Posted Anonymously
Q: The MCC elevation detail shows light I-LO is controlled by a switch inside MCC. Will this be controlled by the low voltage panel CB and not a switch? 04/04/19
9:01:26 AM
A: It will be controlled by a switch. Switch to be installed on one of the shade structure legs and as directed by Owner. 04/04/19
9:01:26 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Lighting" Posted by:Posted Anonymously
Q: Lighting Schedule shows fixture P-DL and P-P but does not show a quantity and location on plans. Where are these to be added? 04/04/19
9:00:08 AM
A: The only light is on the sunscreen (shade structure). 04/04/19
9:00:08 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "MCC and VFD Combined" Posted by:Posted Anonymously
Q: Sheet 20 Is it acceptable for the MCC and VFD be combined into a single line instead of separated as shown? 04/04/19
8:58:54 AM
A: It is acceptable if the installation meets the requirements specified for VFDs and the enclosure is rated for 50 degree C ambient and no air conditioners and power heat sink mounted through enclosure. 04/04/19
8:58:54 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Backboard Location" Posted by:Posted Anonymously
Q: Sheet 20 Where is the control backboard meant to be located 04/04/19
8:55:55 AM
A: Per the note on sheet 21 the control backboard is to be near the J-Stand, see sheet 16. 04/04/19
8:55:55 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Telephone Backboard" Posted by:Posted Anonymously
Q: Sheet 19 - Where is the telephone backboard supposed to be and where is the source. Is the TELCO utility pole nearby? 04/04/19
8:54:48 AM
A: The telco service has been replaced with the cellular modem. 04/04/19
8:54:48 AM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Soils Report" Posted by:Posted Anonymously
Q: Can I get a copy of the soils report used for the design? 04/01/19
2:45:39 PM
A: Yes, the soils report has been posted under docs & specs section. 04/01/19
2:45:39 PM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Concrete Pad" Posted by:Posted Anonymously
Q: What is the desired thickness of the attached detail 7 pad? 04/01/19
2:32:19 PM
A: In regards to the concrete pad for the pipe support shown on Sheet 14 and in Detail 7, Sheet 8, the concrete pad should be 8-inches thick. 04/01/19
2:32:19 PM


Subject: WATER SYSTEM IMPROVEMENTS AT SHAFTER-WASCO RECYCLING AND SANITARY LANDFILL "Site Earthwork" Posted by:Posted Anonymously
Q: Site Earthwork 8-3.2.2 SCARIFICATION AND COMPACTION The area to receive fill beneath the new bolted steel storage tank foundation shall be over-excavated thirty inches (30") below the foundation invert, scarified an additional eight inches (8") deep, and shall extend to ten feet (10') beyond the perimeter of the structure. The area beneath the proposed deep well pump foundation, the booster pump foundations, and the electrical foundation shall be over-excavated eighteen inches (18") below the concrete invert. The exposed surface shall be moisture conditioned to at or above optimum, and compacted in maximum six-inch (6") lifts to ninety-five percent (95%) relative compaction as determined by ASTM D-1557. Additional lifts shall not be placed if the previous lift does not meet the required dry density or if the soil moisture condition is unacceptable. The fill shall be placed and compacted with equipment approved by the Engineer. Question: The booster pump foundations do not specify an over-excavation / compaction in the prints. Which supersedes in this case the prints or the specifications? 03/21/19
1:48:26 PM
A: The Specification supersedes the Plans. 03/21/19
1:48:26 PM


Click here for a printer friendly version of this information Printable Project Summary  
 

 Plan Holders
List Last Updated: 2019-04-17 3:27:45 PM


Organization/Division
Type
Contact Name
Address  Phone  Fax 
Bid America 
Plan Room / Service
41085 Elm St 
Murrieta, CA 92562
(951) 677-4819
Bid America 
Plan Room / Service
Andrew Waughn
41085 Elm Street 
Murrieta, CA 92562
(951) 290-3647 (951) 600-0615
Bid America 
Plan Room / Service
Andrew Waughn
41085 Elm Street 
Murrieta, CA 92562
(951) 290-3648 (951) 600-0615
Blueprint Express 
Printing / Drafting
Planroom Service
618 East Grand Ave 
Arroyo Grande, CA 93420
(805) 481-1655 (805) 481-2110
Brough Construction 
General Contractor
Jeffrey Brough
634 Printz Rd 
Arroyo Grande, CA 93420
(805) 489-7779 (805) 473-2479
Builders Exchange of Merced & Mariposa Inc 
Other
Debbie Ripley
415 W 18th Street Ste 7 
Merced, CA 95340
(209) 722-3612 (209) 722-0207
Central California Bldg Exchange 
Plan Room / Service
Davia Bustamante
1244 N Mariposa Street 
Fresno, CA 93703
(559) 237-1831 (559) 264-2532
Central California Builder's Exchange 
Plan Room / Service
Davia Bustamante
1244 N Mariposa Street 
Fresno, CA 93703
(559) 237-1831 (559) 264-2532
constructconnect 
Architect
30 Technology Pkwy Suite 100 
Norcross, GA 30092
(770) 417-4000
Core&Main LP 
Supplier / Vendor
Jim Hughes
19421 Colombo St 
Bakersfield, CA 93308
(661) 393-2288 (661) 393-0439
Dodge Data & Analytic 
Plan Room / Service
Catherine Cardona
3315 Central Ave 
Hot Springs, CA 71913
(562) 409-1096 (626) 226-4016
Dodge Data & Analytics 
Plan Room / Service
Catherine Cardona
3315 Central Ave 
Hot Springs, AR 71913
(562) 409-1096 (626) 226-4016
Farm Pump and Irrigation Co., Inc. 
Subcontractor
535 N Shafter Ave 
Shafter, CA 93263
(661) 589-6901 (661) 746-1510
FW Dodge 
Plan Room / Service
1333S Mayflower Ave 3rd Floor 
Monrovia, CA 91016
(626) 932-6181 (626) 932-6189
HOBBS CONSTRUCTION INC. 
General Contractor
PO Box 448 
Friant, CA 93626
(559) 434-6182 (559) 434-6184
Impax Automation 
Not Specified
Tim McCorkle
2131 Saturn Court 
Bakersifeld, CA 93308
(661) 391-8210 x501
Isco machinery 
Const Equipm./Rentals
Evan Gronquist
4796 W Sierra Hwy 
Acton, CA 93510
(661) 618-7133 (661) 269-1478
Jifco, Inc 
General Contractor
Jay Forni
571 Exchange Court 
Livermore, CA 94550
(925) 449-4665 (925) 449-5517
Jt2 INC dba TODD COMPANIES 
Not Specified
Jim ToddII
PO BOX 6820 
VISALIA, CA 93290
(559) 651-5820 (559) 651-5830
KCBEX 
Plan Room / Service
Gabriela Maldonado
1121 Baker Street 
Bakersfield, CA 93305
(661) 324-4921 (661) 324-5364
Kern County Builders Exchange 
Online Plan Room 
Plan Room / Service
1121 Baker St 
Bakersfield, CA 93305
(661) 324-4921 (661) 324-5364
Kern County Builders Exchange 
Plan Room / Service
Gabriela Maldonado
1121 Baker Street 
Bakersfield, CA 93305
(661) 324-4921 (661) 324-5364
Kern County Public Works Dept. 
Other
Mike Arnold
 
,  
(661) 862-5198
Kern County Public Works Dept. 
Other
 
,  
(661) 862-8850 (661) 862-8851
LMS 
General Contractor
Ron McNeil
18059 Rosedale Hwy 
Bakersfield, CA 93314
(661) 589-0972
Lyles Utility Construction, LLC 
Hernandez 
General Contractor
Roman Hernandez
2314 Perseus Ct 
Bakersfield, CA 93309
(661) 679-1190 x93309
Paso Robles Tank, Inc. 
Estimating 
General Contractor
Shane Wombles
PO Box 2810 
Hemet, CA 92546
(951) 925-5022
Sacramento Regional Builders Exchange 
Supplier / Vendor
Yelena Miroshnichenko
1331 T Street 
Sacramento, CA 95811170
(707) 442-8991 x108 (916) 446-3117
Santa Maria Contractors Association 
Not Specified
Mike Brown
2003 North Preisker Lane 
Suite A 
Sant Maria, CA 93454
(805) 925-1191 (805) 922-2983
SLO County Builders Exchange 
Plan Room / Service
153 Cross St #130 
San Luis Obispo, CA 93401
(805) 543-7330 (805) 543-7016
STEVE DOVALI CONST. 
General Contractor
TIM DOVALI
8461 EAST OLIVE 
FRESNO, CA 93737
(559) 255-7603 (559) 456-2843
Storesund Engineering LLC 
Not Specified
Rune Storesund
154 Lawson Road 
Kensington, CA 94707
(510) 526-5849
Superior Tank Company 
Subcontractor
Michael Anderson
19436 Colombo St 
Bakersfield, CA 93308
(661) 205-9138 (661) 392-8770
Superior Tank Company 
General Contractor
19436 Colombo Street 
Bakersfield, CA 93308
(661) 392-0188 (661) 392-8770
SW Construction 
GARDUNO 
General Contractor
MICHELLE GARDUNO
5630 District Blvd Suite 107 
Bakersfield, CA 93313
(661) 398-2289
Tetra Tech BAS 
General Contractor
21700 Copley Dr Suite 200 
Diamond Bar, CA 91765
(909) 655-3280
TULARE KINGS BUILDERS EXCHANGE 
Plan Room / Service
BERNICE RUIZ
823 W Center Avenue 
VISALIA, CA 93291
(559) 732-4568 (559) 732-7568
Unified Field Services Corp. 
General Contractor
Timothy Jacober
6906 Downing Avenue 
Bakersfield, CA 93308
(661) 858-8223 (661) 846-6999
Unified Field Services Corporation 
General Contractor
John Stark
6300 Seven Seas 
Bakersfield, CA 93308
(661) 858-8223
Valley Builders Exchange 
Plan Room / Service
Angelica Baca
1118 Kansas Avenue 
Modesto, CA 95351
(209) 522-9031 (209) 522-0616
Ventura County Plan Service 
Plan Room / Service
2419A Palma Dr 
Ventura, CA 93003-5731
(805) 642-7834 (805) 642-5151
WM B Saleh Co 
General Contractor
Terry Osburn
 
2361 Cepheus Ct 
Bakersfield, CA 93308
(661) 393-8842 (661) 393-8138
Zim Industries, Inc. dba Bakersfield Well & Pump Company 
Subcontractor
Oscar Macias
7212 Fruitvale Avenue 
Bakersfield , CA 93308
(661) 393-9661 (661) 393-9647
Zim Industries, Inc. dba Bakersfield Well & Pump Company 
General Contractor
Oscar Macias
7212 Fruitvale Avenue 
Bakersfield , CA 93308
(661) 393-9661 (661) 393-9647