WILSON III BASIN PROJECT PHASE 1A AND 1B


10879 

Project Name: WILSON III BASIN PROJECT PHASE 1A AND 1B
Project Type:
Engineering/Civil
Ownership: Public
Project City, State: Yucaipa, California
Engineer's Estimated Cost: $4,500,000 to $4,500,000 
Pre-Qualification for Bidders: Not Required
Project/Contract Number: 10879
Project Contact: Lorrie Hutchison
City of Yucaipa
Public Works
34272 Yucaipa Blvd
Yucaipa, CA 92399
Tel:(909) 797-2489 x254
Fax:(909) 500-7845
lhutchison@yucaipa.org
1st Advertise Date: 05/22/20 
Bid Due Date: 09/01/20 
Bid Due Time: 3:00 PM 
Project Duration: 240  Work Days
Liquidated Damages: $1,100.00 Per Work Day
Bid Bond Percentage: 10% 
Non-Mandatory Pre Bid Conference Date: 08/12/20 
Pre Bid Conference Time : 2:00 PM 
Pre Bid Conference Location: Non-Mandatory Pre-Bid meeting is a Microsoft Teams Meeting. Call-in information is below.
+1 951-465-8385

https://teams.microsoft.com/l/meetup-join/19%3ameeting_M2UyOTg4MGQtMTE1Ni00MDQ1LTg2NjgtYjJlODkzMjA0OWUw%40thread.v2/0?context=%7b%22Tid%22%3a%22a50a6903-e9a5-45ab-ae76-8ac659b944dc%22%2c%22Oid%22%3a%229ecf7c61-a4e1-4e42-b8ff-7607c3c1bf6d%22%7d

Conference ID: 777 731 73#
 
Project Description: The contract work to be done shall consist of furnishing all labor, materials, necessary tools, equipment, supervision, appurtenances, and all utility and transportation services required for the construction of Phase 1A and Phase 1B of Wilson III Basin including Wilson Creek Impact Basin, Oak Glen Impact Basin, channel connections, removal of existing facilities, asphalt concrete pavement, grading, concrete curb, concrete curb and gutter, concrete aprons, concrete headwalls and wingwalls, grouted riprap, non-grouted riprap, storm drain lines, reinforced concrete box structure, concrete spillways, grate inlets, the tubular steel and trail and gate construction, chain link fence removal and placement, grading and drainage improvements in accordance with the Plans, Drawings, Specifications and other provisions of the Contract.

Any work or component of this work not specifically addressed shall be considered ancillary to the associated work and shall be considered as included within the various items of work.

Engineer's Estimate for Phase 1A $4,500,000
Engineer's Estimate for Phase 1B $6,000,000
 
 
 Project Contacts
Project Manager
City of Yucaipa
Mike Seal
34272 Yucaipa Blvd
Street Address Line2
92399
Yucaipa, CA 92399
Phone: (909) 797-2489 x252
mseal@yucaipa.org
   
 Docs / Specs
Register as a Document Holder to receive notifications about this opportunity.

Click on a Document Name to download.
  Document Name Document Type Size Date Submitted 
  16-0320 Wilson Basin -Phase 1A Bid Set -2020-0.pdf Plans and Specifications / Other 33068.7Kb 5/21/2020 

  16-0320 Wilson Basin -Phase 1B Bid Set -2020-0.pdf Plans and Specifications / Other 32141.5Kb 5/21/2020 

  Wilson III Basin Phase 1 - Final Specs 5-26-20.pdf Plans and Specifications / Other 76793.2Kb 5/27/2020 

  Addendum No. 1.pdf Addenda 906.4Kb 6/11/2020 

  Addendum No. 2.pdf Addenda 883.4Kb 6/23/2020 

  Grading Plan-Stock Pile Plan.pdf Addenda 3327.8Kb 8/6/2020 

  Addendum No. 3.pdf Addenda 4684.3Kb 8/6/2020 

  Converse Consultants Geotechnical Report.pdf Addenda 11898.1Kb 8/6/2020 

  Bid Bond.pdf Addenda 412.7Kb 8/10/2020 

  Cut and Fill Sheets.pdf Addenda 9326.8Kb 8/12/2020 

  Addendum No. 4.pdf Addenda 7081.3Kb 8/13/2020 

  Addendum No. 5.pdf Addenda 946.7Kb 8/13/2020 

  Addendum No. 6.pdf Addenda 3191.4Kb 8/25/2020 

  Addendum No. 7.pdf Addenda 3081.9Kb 8/27/2020 

 Bid Items

Bid List Name:  Base Bid Phase 1A * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  00001 MOBILIZATION 1 LS    
  00002 TRAFFIC CONTROL 1 LS    
  00003 WATER POLLUTION CONTROL/SWPPP (DURING PHASE 1A CONSTRUCTION PERIOD) 1 LS    
  00004 CLEARING & GRUBBING 1 LS    
  00005 EXCAVATION & CUT 1367861 CY    
  00006 COMPACTED FILL 431989 CY    
  00007 OVER EXCAVATION & RE-COMPACTION 178934 CY    
  00008 MATERIAL DELIVERIES TO STOCKPILE AREA B 540142 CY    
  00009 STOCKPILE OF ROCK 205000 CY    
  00010 SURPLUS MATERIAL STOCKPILE 111131 CY    
  00011 STOCKPILE AREA C - 24" STORM DRAIN & OUTLET STRUCTURE 1 LS    
  00012 WATER POLLUTION CONTROL/SWPPP (STARTS AFTER PHASE 1A COMPLETION AND ENDS WITH PHASE 1B AWARD) 10 MO    
   

Bid List Name:  Additive Alternate Bid Phase 1B * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  00001 MOBILIZATION 1 LS    
  00002 TRAFFIC CONTROL 1 LS    
  00003 WATER POLLUTION CONTROL/SWPPP 1 LS    
  00004 CONSTRUCT 1" WIDE, 5' DEEP CONCRETE CUTOFF WALL WITH #4 REBAR AT 12" EACH WAY, EACH FACE 375 LF    
  00005 CONSTRUCTION 1/2 TON UNGROUTED RIP-RAP 6200 CY    
  00006 CONSTRUCT 1 TON GROUTED RIP-RAP 12400 CY    
  00007 CONSTRUCT 1 TON UNGROUTED RIP-RAP 4500 CY    
  00008 CONSTRUCT 2 TON GROUTED RIP-RAP 3000 CY    
  00009 CONSTRUCT WILSON CREEK IMPACT BASIN 1 LS    
  00010 CONSTRUCT OAK GLEN IMPACT BASIN 1 LS    
  00011 CONSTRUCT OAK GLEN INLET STRUCTURE 1 LS    
  00012 CONSTRUCT DOUBLE CELL 12'W X 10' H RCB PER CALTRANS STD. DWG. NO. D81 72 LF    
  00013 CONSTRUCT CHANNEL WALL AND WING WALL CHAIN LINK FENCE PER SPPWC STD. DWG. NO. 600-3 714 LF    
  00014 CONSTRUCT CABLE RAILING PER CALTRANS 2018 STD. PLAN B11-47 400 LF    
  00015 CONSTRUCT REMOVABLE DEBRIS BOLLARDS 5' O.C. PER DETAIL ON SHEET 8 23 EA    
  00016 CONSTRUCT 12" CLASS II FILTER BASE MATERIAL 2900 CY    
  00017 CONSTRUCT MIRAFI 1100N FILTER FABRIC 8580 SY    
  00018 CONSTRUCT TERRACE DRAIN PER YUCAIPA STD. DWG. 310-0 4360 LF    
  00019 CONSTRUCT DOWN DRAIN PER YUCAIPA STD. DWG. 310-0 950 LF    
  00020 CONSTRUCT BROW DITCH PER DETAIL ON SHEET 33 490 LF    
  00021 INSTALL MODIFIED PICKET RAILING FENCE PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 811 LF    
  00022 CONSTRUCT 3" AC MAINTENANCE ROAD OVER 95% COMPACTED MATERIAL 245 TN    
  00023 CONSTRUCT MODIFIED DRIVEWAY APPROACH PER CITY OF YUCAIPA DWG. STD. NO. 110-1 2 EA    
  00024 CONSTRUCT MAINTENANCE RAMP FOR ROCK LINED CHANNEL PER DETAIL ON SHEETS 22 & 23 8200 SF    
  00025 INSTALL MODIFIED RAILING DOUBLE DRIVE GATE (GATE ONLY) PER LACDPW STD. PLAN 6102-1 AND PER DETAIL ON SHEET 14 2 EA    
  00026 INSTALL MODIFIED PICKET RAILING DOUBLE DRIVE GATE WITH RAIL ENTRANCE BARRIER PER LACDPW STD. PLAN6102-1 AND PER DETAIL ON SHEET 14 5 EA    
  00027 REMOVAL OF EXISTING CURB, GUTTER AND SIDEWALK 1 LS    
  00028 REMOVAL OF EXISTING CONCRETE HEAD WALL, CONCRETE WINGWALL AND RIPRAP 1 LS    
  00029 CONSTRUCT CHANNEL CONNECTION - LINE "O" 1 LS    
  00030 CONSTRUCT CHANNEL CONNECTION - LINE "C" 1 LS    
  00031 CONSTRUCT 6" CONCRETE APRON WITH #4 REBAR AT 18" O.C. EACH WAY 235 CY    
  00032 CONSTRUCT DOWN DRAIN TO UTILITY TRAIL CROSSING PER DETAIL ON SHEET 33 3 EA    
  00033 CONSTRUCT DRAINAGE APRON WITH DOWN DRAIN TRANSITION PER DETAIL ON SHEET 33 6 EA    
  00034 CONSTRUCT RIP-RAP PAD PER DETAIL ON SHEET 33 517 SF    
  00035 CONSTRUCT INTERCEPTOR DRAIN PER CITY OF YUCAIPA STD. DWG. 311-0 MODIFIED TO ELIMINATE 1' BENCH 2830 LF    
  00036 CONSTRUCT INTERCEPTOR DRAIN PER CITY OF YUCAIPA STD. DWG. 311-0 1890 LF    
  00037 CONSTRUCT TERRACE DRAIN AND DOWN DRAIN INTERSECTION PER CITY OF YUCAIPA STD. DWG. 311-0 30 LF    
  00038 CONSTRUCT TERRACE DRAIN PER CITY OF YUCAIPA STD. DWG. 311-0, MODIFIED TO ELIMINATE 1' BENCH ADD 8' WIDE DG TRAIL PER DETAIL ON SHEET 33 903 LF    
  00039 CONSTRUCT RIP-RAP SWALE WITH CALTRANS CLASS III RIP RAP (PER CALTRANS SPECIFICATION SECTION 72) PER DETAIL ON SHEET 33 295 SF    
  00040 CONSTRUCT SPLASH WALL PER CITY OF YUCAIPA STD. DWG. 310-0 AND PER TERRACE DRAIN DETAIL ON SHEET 33 45 EA    
  00041 CONSTRUCT FOREBAY 1 LS    
  00042 RIP-RAP IMPORT 25980 CY    
  00043 SURPLUS MATERIAL STOCKPILE 29000 CY    
   
 CSI Code
  No CSI Codes Specified. 
 Q&A
Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Wing Walls" Posted by:Lorrie Hutchison-City of Yucaipa
Q: Plan sheet 35 & 36 of 45 - Based on a site visit, the existing RCB structure has wing walls that extend past the outlet. These wing walls need to be demolished to construct the new Wilson Creek Impact Basin. Where is the demo of those wing walls paid for? What will be the demo limits? 08/24/20
7:30:11 AM
A: The wingwall demolition is paid under Phase 1B bid item 28 “Removal of existing head wall, wingwall and riprap” and is covered as construction note 84 and sheet 35. 08/24/20
7:30:11 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Fencing removal" Posted by:Lorrie Hutchison-City of Yucaipa
Q: Plan sheet 35 & 36 of 45 - Based on a site visit, there is a fence structure on top of the existing RCB. That fencing will be required to be removed to connect it to the new Wilson Creek Impact Basin. Where is the removal of that fencing paid for? 08/24/20
7:29:34 AM
A: The fence removal on the existing RCB shall be considered incidental work under phase 1B bid item 9 “Construct Wilson Creek Impact Basin” 08/24/20
7:29:34 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Construction of the Trapezoidal channel" Posted by:Lorrie Hutchison-City of Yucaipa
Q: Plan Sheet 41 of 45 – Will the construction of the Trapezoidal channel be included in phase 1B? 08/24/20
7:28:45 AM
A: The Trapezoidal channel is a part of the Phase II Project. PLEASE NOTE THIS ITEM IS IN PHASE II OF THE PROJECT AND IS NOT A PART OF THE 1A/1B BID SET 08/24/20
7:28:45 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Weephole & Construction Joint" Posted by:Lorrie Hutchison-City of Yucaipa
Q: Plan Sheet 41 of 45 – "Weephole & Construction Joint - Typical Detail A" calls out for 5000 psi concrete 8" thick. What will be the limits for the 5000 psi concrete? Will this only apply to the horizontal bottom between the construction joints, or will this apply to all of the concrete in the trapezoidal channel? NOTE, THIS QUESTION WAS NOT RESPONDED TO IN THE Q&A. 08/24/20
7:28:02 AM
A: For your future reference -All concrete regarding the trapezoidal channel will be 5000 psi concrete. HOWEVER, PLEASE NOTE THIS ITEM IS IN PHASE II OF THE PROJECT AND IS NOT A PART OF THE 1A/1B BID SET. 08/24/20
7:28:02 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Debris Bollards" Posted by:Lorrie Hutchison-City of Yucaipa
Q: Plan Sheet 8 of 45 For the removable Debris Bollards shown on plan sheet 8, please clarify the following: What is the required material and finish for the cans and bollards? What is the pipe thickness for the bollards? 08/24/20
7:27:06 AM
A: The removal Debris Bollard 5 9/16” OD SCH 40 Galvanized Steel and footing sleeve 6 5/8” OD Sch 40 Galvanized Steel 08/24/20
7:27:06 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Addendum 3" Posted by:Joe Richardson-Granite Construction Company
Q: Converse Consultants Geotechnical Report has an error and cannot be opened. Message reads "thee was an error opening this document. The file is damaged and could not be repaired" I have tried multiple times to download 08/14/20
1:19:09 PM
A: The owner of this project has not answered this question at this time.  


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Limits of Clearing" Posted by:Posted Anonymously
Q: Please define the limits of clearing that are needed within the area shown as Stockpile Area B. Does the area include the entire limits shown on drawing 2A, or only the area used by the Contractor for stockpile material? 08/10/20
8:26:12 AM
A: Stockpile Area B does not need to be cleared under this contract. All other areas shown on Exhibit 2A will be cleared with this Project. 08/10/20
8:26:12 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Anticipated Date of Award" Posted by:Posted Anonymously
Q: What is the anticipated date of award for the Phase 1A contract? 08/10/20
8:21:10 AM
A: August of 2020. 08/10/20
8:21:10 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Items Included in Award" Posted by:Posted Anonymously
Q: The statement “The City may, at its option, select all, some, or none of the Additive/Alternate Bid #1” noted on Page 6 of the Addendum should be clarified. If the City awards only a portion of the items included, please confirm that items #1, #2 and #3 will be included in the award. 08/10/20
8:20:41 AM
A: This will be determined by the City at the time of award. 08/10/20
8:20:41 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Fill in Stockpile C" Posted by:Posted Anonymously
Q: Where is the earthwork associated with the fill in Stockpile C to be paid? 08/10/20
8:19:25 AM
A: In 1A bid items 4, 5B and 5C. 08/10/20
8:19:25 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Weep Hole & Construction Joint" Posted by:Posted Anonymously
Q: On plan sheet 41 of 45 - Weep hole & Construction Joint - Typical Detail A" calls out for 5000 psi concrete 8" thick. What will be the limits for the 5000 psi concrete? Will this only apply to the horizontal bottom between the construction joints, or will this apply to all of the concrete in the trapezoidal channel? 08/10/20
8:18 AM
A: On plan sheet 41 of 45 - Weep hole & Construction Joint - Typical Detail A" calls out for 5000 psi concrete 8" thick. What will be the limits for the 5000 psi concrete? Will this only apply to the horizontal bottom between the construction joints, or will this apply to all of the concrete in the trapezoidal channel? 08/10/20
8:18 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Baffle Protection Plate" Posted by:Posted Anonymously
Q: The baffle protection plate will be required to be delivered and erected in pieces due to the size and weight. Please advise if there are any minimum dimensions for the pieces and confirm that the pieces will not be required to be field welded into a single solid piece. 08/10/20
8:17:20 AM
A: The baffle protection plate can be delivered and erected in pieces. There are no minimum dimensions for the pieces and they are not required to be field welded. However, the contractor is responsible for submitting shop drawings showing the proposed size and configuration of the individual pieces and how they will be anchored into the concrete baffle wall. In addition, the contractor is responsible for providing calculations showing that the proposed anchorage for the individual pieces meets or exceeds the anchorage shown on the plans for the entire piece. 08/10/20
8:17:20 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Dirt Road need to Remain open" Posted by:Posted Anonymously
Q: There is an existing dirt road that extends south from 2nd Street to the south side of the project. Does that road need to remain open for any type of traffic during the project? If so, what type of traffic is expected to use this roadway? 08/10/20
8:16:42 AM
A: The road will need to stay open. It is a service road to a well site. 08/10/20
8:16:42 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Stockpile Area A" Posted by:Posted Anonymously
Q: Please provide mass grading plans for Stockpile Area A. 08/10/20
8:06:17 AM
A: The Mass Grading/Stockpile Plan is attached as a single plan. The Cut/fill sheet have been removed as they for the entire project and do not reflect the phasing. 08/10/20
8:06:17 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Stockpile Area B" Posted by:Posted Anonymously
Q: On plan sheet 2A of 45, the area shown as Stockpile Area B contains improved areas (buildings, fences, asphalt paved areas, material stockpiles, etc.). It also appears to be an active public clean fill site as there is evidence of recent stockpiling of soil and trash. Please clarify the geographical extent of where material can be stockpiled on this site, whether or not this area will be closed to the public or other third parties as a fill site during the course of the project, and whether or not the Contractor will be required to remove all trash within this area as part of the clearing bid item. 08/10/20
8:05:23 AM
A: The owner/developer of the “stockpile area B” site will be using this material as fill for the grading of their site, and their contractor will be working concurrently to place this material in its final location as it is delivered to them. The contractor for the Wilson Basin project is required to coordinate with the City and the owner/developer’s contractor regarding the details of how and where this material will be delivered to their site. All activities other than the delivery and dumping of the stockpile material on the site will be completed by the owner/developer’s contractor for “Stockpile Area B”, and is not included in the scope of work under this contract. 08/10/20
8:05:23 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Abondonment of Utilities" Posted by:Posted Anonymously
Q: In the Special Provisions it states “that cost for cut and cap of abandoned utilities is "...included in the unit prices bid for the particular items of work..." When an unknown abandoned utility is encountered, how does the Contractor get compensated? 08/10/20
8:02:14 AM
A: The cost of this work shall be included in the unit prices bid for the particular items of work where such interference occurs unless otherwise specified. 08/10/20
8:02:14 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Flow Rates for Project" Posted by:Posted Anonymously
Q: Contractor assumes all risk for flow and acceptance of water into the project site. Please provide data for average flow rates so that this risk can be quantified. 08/10/20
8:01:18 AM
A: The flow rates for the project (basis of design) are shown on the plans. 08/10/20
8:01:18 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "3rd Party Contractor for Stockpiling" Posted by:Posted Anonymously
Q: Has the 3rd party contractor that will be performing the screening and placement of the residential area “Stockpile Area B” referred to in the note on page 1A of the plans been selected? 08/10/20
8:00:02 AM
A: Yes, the contractor has been selected by the Developer of the Residential site independent of the City Project. 08/10/20
8:00:02 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "SWPPP Requirements" Posted by:Posted Anonymously
Q: In the SWPPP requirements of the bid forms, it states that soil stabilization will be required on graded surfaces. There are numerous forms of soil stabilization available, and selection is most often determined by the length of time that the graded surfaces will be left unimproved. We suggest that the City define the specific requirements for slope stabilization or identify acceptable forms and their applicable uses. 08/10/20
7:59:07 AM
A: The SWPPP shall be prepared by the contractor awarded the construction contract and will be submitted and approved by the City prior to construction. All Best Management Practices (BMP) shall be in accordance with San Bernardino County Code Ordinance Title 3, Division 5, and Chapter 1: Pollutant Discharge Elimination System Regulations (Storm Water Ordinance). 08/10/20
7:59:07 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Good Faith Effort" Posted by:Posted Anonymously
Q: In the Notice of Inviting Bids, the last sentence states “Attendance may be used as part of the Good Faith Effort”. What is the purpose of the good faith effort? There does not appear to be any requirements for SBE/DBE participation on this project. 08/10/20
7:58:30 AM
A: SBE/DBE participation is a goal for this Project but not a requirement. 08/10/20
7:58:30 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "Buy Yucaipa Certificate" Posted by:Posted Anonymously
Q: Please provide specific instructions on the “Buy Yucaipa” certificate and the work that is to be included in this assessment? Since bids are being evaluated on Phase 1A only, does the 10% Buy Yucaipa certificate apply only to the Phase 1A work? 08/10/20
7:57:46 AM
A: Buy Yucaipa is a goal only and is not a requirement. The 10% applies to both 1A (10%) and 1B (10%) and both bid schedules will be evaluated. 08/10/20
7:57:46 AM


Subject: WILSON III BASIN PROJECT PHASE 1A AND 1B "License Required" Posted by:Posted Anonymously
Q: What contractor’s license is required for this project? 08/10/20
7:57 AM
A: Page 3 of the specifications states the following: “At the time of contract award, the prime contractor shall possess the appropriate contractor’s license and/or any combination of specialty contractor’s license(s) sufficient to perform the work”. 08/10/20
7:57 AM


Click here for a printer friendly version of this information Printable Project Summary  
 

 Plan Holders
List Last Updated: 2020-09-02 7:33:45 AM


Organization/Division
Type
Contact Name
Address  Phone  Fax 
A.M. Ortega Construction, Inc 
Estimating 
General Contractor
Steve Wood
224 N Sherman Ave 
Corona, CA 92882
(619) 390-1988
AB FENCE COMPANY, INC 
INC. 
Subcontractor
ABFENCE INC
1440 BEAUMONT AVE STE A2 #324 
beaumont, CA 92223
(844) 707-0007
Act 1 Construction 
General Contractor
444 6th Street 
Norco, CA 92860
(951) 735-1184 (951) 737-4342
AGC 
Plan Room / Service
Scherrise Judge
6212 Ferris Sq 
San Diego, CA 92121
(858) 558-7444 x110 (858) 558-8444
ALL AMERICAN ASPHALT 
General Contractor
Public Works
400 EAST SIXTH STREET 
CORONA, CA 92879
(951) 736-7600 (951) 739-4671
Amber Steel 
Subcontractor
Ramiro Perez
PO Box 900 
Rialto, CA 92377
(909) 874-2213
Associated General Contractors of American San Diego Chapter 
Plan Room / Service
6212 Ferris Square 
San Diego, CT 92121
(858) 558-7444 (858) 558-8444
Awi Builders Inc 
General Contractor
Zhiryar Mekikyan
1027 Sherlock Dr 
Burbank, CA 91501
(562) 948-1133 (562) 948-1177
B&R Consulting Engineers Inc. 
Construction Manager
34661 Bella Vista Drive 
Yucaipa 
Yucaipa, CA 92399
(909) 915-4825 x92399
Ballard Marine Construction, Inc. 
General Contractor
Melissa Philpott
7303 Edgewater Dr, Suite D 
Oakland, CA 94621
(866) 782-6750
Beador Construction Company, Inc 
General Contractor
David Beador
26320 Lester Cir 
Corona, CA 92883
(951) 674-7352 (951) 674-7495
Bid America 
Plan Room / Service
41085 Elm St 
Murrieta, CA 92562
(951) 677-4819
Bid America 
Plan Room / Service
41085 Elm Street 
Murrietta, CA 92562
(951) 677-4819 (951) 600-0615
BidAmerica 
Public works Planroom 
Plan Room / Service
Shannon Dayton
41085 Elm Street 
Murrieta, CA 92562
(951) 813-2084 (951) 600-0615
bidnet 
pitzer 
Not Specified
kurt pitzer
15 british american blvd 
albany 
albany, NY 12110
(800) 677-1997
BidNet 
Other
Contact BidNet
20A Railroad Ave 
Albany, NY 12205
(800) 677-1997
Bithell Inc. 
Supplier / Vendor
Jeff Hazlett
1004 E Edna Pl 
Covina, CA 91724
(626) 331-2292 (626) 339-4588
Borden Excavating Inc. 
General Contractor
Shaun Borden
1014 2nd Street 
Calimesa, CA 92320
(909) 795-5410 (909) 795-5354
Bosco Constructors 
General Contractor
21353 Mayall St 
Chatsworth, CA 91311
(818) 700-0304
C.S. Legacy Construction, Inc. 
Gonzales 
General Contractor
Richard Gonzales
5781 Schaefer Ave 
Chino, CA 91710
(909) 590-2626
C.W. Crosser Construction 
General Contractor
YT Chao
1250 N Lakeview Avenue Suite J 
Anaheim, CA 92807
(714) 693-9800 (714) 693-0800
C.W. CROSSER CONSTRUCTION, INC.  
General Contractor
1250 N LAKEVIEW AVE, STE J  
Anaheim, CA 92807
(714) 693-9800 (714) 693-0800
Cattrac Construction Inc. 
Pre-Qualified Contractor
15030 Slover Ave 
Fontana, CA 92337
(909) 355-1146
Clark Bros. Inc. 
General Contractor
Nick Patch
745 Broadway 
Fresno, CA 93721
(406) 579-7358
Clark Bros. Inc. 
Patch 
General Contractor
Nick Patch
745 Broadway 
Fresno, CA 93721
(559) 272-8168
CMB STRUCTURES INC 
Subcontractor
STEVE SULLIVAN
10572 ACACIA STREET SUITE C-3 
RANCHO CUCAMONGA, CA 91730
(909) 980-4538
CMB Structures Inc. 
Subcontractor
Steve Sullivan
7090 Archibald Ave 
Rancho Cucamonga, CA 91701
(909) 980-4538
CMC Rebar 
Subcontractor
Pamela Pacheco
12451 Arrow Route 
Etiwanda, CA 91739
(909) 803-1501 (909) 899-9799
CMC Rebar 
Subcontractor
Pamela Pacheco
12451 Arrow Route 
Etiwanda, CA 92571
(909) 803-1501 (909) 899-9799
ConstructConnect 
Other
Morgan Stinson
Multiple Locations 
Yucaipa, CA 92399
(800) 364-2059 (866) 570-8187
Construction Bid Source 
Plan Room / Service
Patty Gibson
6265 HWY 9 
Felton, CA 95018
(888) 786-9450 (209) 772-3537
Contera Construction Corporation 
Trucks / Vans / Trailers
28545 Old Town Front St Ste 201 
Temecula 
Temecula, CA 92592
(951) 695-2800
craneveyor corp. 
Supplier / Vendor
ronney collosi
1524 N POTRERO AVE 
SOUTH EL MONTE, CA 91733
(626) 442-1524
Crown Fence Company-Santa Fe Springs 
Subcontractor
Gabriel Garcia
12118 Bloomfield Ave 
Santa Fe Springs, CA 90670
(562) 864-5177 (562) 864-1299
Empire Equipment Service, Inc 
General Contractor
Josh Steffy
5297 Agate street 
Riverside, CA 92509
(951) 681-1345
Empire Equipment Service, Inc 
General Contractor
Josh Steffy
5297 Agate street 
Riverside, CA 92509
(951) 681-1345 (951) 685-1312
Environmental Construction, Inc. 
General Contractor
Eric Gamonal
21550 Oxnard Street no1060 
Woodland Hills, CA 91367
(818) 449-8920 (818) 805-3558
F.W. Dodge (Greensheet) 
Plan Room / Service
8755 Flower Road Suite A 
Rancho Cucamonga, CA 91730
(626) 932-6137 (626) 932-6153
G.B. Cooke, Inc. 
General Contractor
 Smith
660 S State College Blvd 
Fullerton, CA 92831
(626) 969-8736
Granite Construction Company 
General Contractor
Joe Richardson
38000 Monroe Street 
Indio, CA 92203
(760) 775-7500 (760) 775-8229
Green Building Corporation 
General Contractor
Fred Heidarian
7100 Hayvenhurst Avenue 
Suite PHA2 
Van Nuys, CA 91406
(818) 308-6435 (818) 308-6202
GREEN BUILDING CORPORATION  
Not Specified
7100 Hayvenhurst Ave Ste PH-A2 
Van Nuys, CA 91406
(818) 987-6059 (818) 308-6202
Griffith Company 
General Contractor
Brad Austin
3050 E Birch St 
Brea, CA 92821
(714) 984-5500 (714) 854-0227
Griffith Company 
Structures 
General Contractor
Ben Walnum
3050 E Birch Street 
Brea, CA 92821
(562) 477-0836 x92821
Griffith Company 
General Contractor
12200 Bloomfield Ave 
Santa Fe Springs, CA 90670
(562) 929-1128 (562) 864-8970
H & H General Contractors Inc. 
General Contractor
JUAN OLVERA
PO BOX 536 
HIGHLAND, CA 92346
(909) 425-3907 (909) 425-3910
H&H General Contractors Inc. 
General Contractor
Juan Olvera
PO Box 536 
Highland, CA 92346
(909) 425-3907 (909) 425-3910
Heartland Grading 
General Contractor
3142 tiger Run Ct Ste 114 
Carlsbad, CA 92010
(760) 650-3720 (760) 650-3725
hi-desert plan room 
Printing / Drafting
heather Collins
15353 anacapa road 
victorville, CA 92392
(760) 243-2111
Hi-Desert Plan Room 
Plan Room / Service
15353 Anacapa Road #1 
Victorville, CA 92392-2447
(760) 243-2111 (760) 243-2131
Horizons Construction Company Int'l Inc. 
Orange 
General Contractor
Michael Ortega
432 W Meats Avenue 
Orange, CA 92865
(714) 626-0000 x16 (714) 626-0006
Integrity Rebar Placers 
Estimating 
Subcontractor
Dolly Adams
1345 Nandina Avenue 
Perris, CA 92571
(951) 696-6843 x810 (951) 943-7772
Integrity Rebar Placers 
Subcontractor
Dolly Adams
1345 Nandina Avenue 
Perris, CA 92571
19516966843 x810 (951) 943-7772
J&A Structures Inc 
Subcontractor
1127 E 5th ST 
Corona, CA 92707
(951) 496-5000
James McMinn, Inc. 
General Contractor
Bryan Cancel
21834 Cactus Ave 
Riverside, CA 92518
(909) 514-1231 (909) 514-0553
Jeremy Harris Construction, Inc. 
General Contractor
Jeremy Harris
11731 Sterling Ave Suite F 
Riverside, CA 92503
(951) 215-0771 (951) 789-0089
JPI Development Group, Inc. 
Subcontractor
Mariela Barrera
41205 Golden Gate Circle 
Murrieta, CA 92562
(951) 973-7680
JV LANDCLEARING AND DEMOLITION 
Subcontractor
 
SAN DIMAS, CA 
KASA Construction, Inc 
General Contractor
Hector Zavala
15148 Sierra Bonita Lane 
Chino, CA 91710
(909) 457-8260 (909) 457-8261
KASA Construction, Inc. 
General Contractor
Hector Zavala
15148 Sierra Bonita Lane 
Chino, CA 91710
(909) 606-0505 (909) 457-8261
KASA Construction, Inc. 
General Contractor
Hector Zavala
15148 Sierra Bonita Lane 
Chino, CA 91710
(909) 457-8260 (909) 457-8261
KEC Engineering 
General Contractor
Estimating Department
200 N Sherman Ave 
Corona, CA 92882
(951) 734-3010 (951) 734-7987
KEC Engineering 
General Contractor
Khai Koh
200 N Sherman 
Corona, CA 92882
(951) 734-3010
KEC Engineering 
General Contractor
Khai Koh
200 N Sherman 
Corona, CA 92882
(951) 734-3010 x227 (951) 735-2081
Larry Jacinto Construction, Inc. 
General Contractor
Scott Dickerson
PO Box 615 
Mentone, CA 93259
(909) 794-2151 (909) 794-9382
LB3 Enterprises Inc. 
General Contractor
Paul Waddington
12485 Highway 67 
Pad 3 
Lakeside 
Lakeside, CA 92040115
(619) 322-2774
Leonida Builders, Inc.  
General Contractor
Panagiotis  Leonida
15821 Live Oak Springs Canyon Rd. 
Santa Clarita, CA 91387
(951) 532-7717 (951) 566-4022
LNA Concrete Structes 
Subcontractor
155455 Penn St 
Chino Hills, CA 91709
(909) 393-1493
LNA CONCRETE STRUCTURES 
Subcontractor
15455 TERN ST 
CHINO HILLS, CA 91709
(909) 393-1493 (909) 393-9363
Lopez Construction Inc. 
Lopez 
Subcontractor
Pedro Lopez
1125 E 5th St 
Corona, CA 92879
(951) 463-0260
Lopez Structures Inc 
Subcontractor
Victor Lopez
15801 ROCKFIELD BLVD, SUITE P 
IRVINE, CA 92618
(949) 973-0927 (949) 203-2118
Los Angeles Engineering 
General Contractor
Craig Claxton
633 N barranca ave 
Covina, CA 91723
(626) 454-5222
Los Angeles Engineering 
General Contractor
Aaron OBrien
 
Covina, CA 
(626) 869-1411
Los Angeles Engineering Inc. 2 
General Contractor
Joseph Haygood
633 N Barranca Ave 
Covina, CA 91723
(626) 454-5222 (626) 454-5226
Mamco, Inc. dba Alabbasi 
General Contractor
Rumzi Alabbasi
764 W Ramona Expressway Ste C 
Perris, CA 92571
(951) 776-9300 (951) 776-0404
Matich Corporation 
General Contractor
Jason Jones
PO Box 10 
Highland, CA 92346
(909) 382-7400 (909) 382-0113
MCC 
MAYO 
Subcontractor
STEVEN MAYO
33562 Yucaipa Blvd #4325 
yucaipa 
yucaipa, CA 92399
(909) 242-2849 x92399
MVC ENTERPRISES INC 
General Contractor
Abe MOKDAD
27250 VIA INDUSTRIA 
TEMECULA, CA 92590
(951) 697-6888
MVC ENTERPRISES INC 
MOKDAD 
General Contractor
DANI MOKDAD
27250 VIA INDUSTRIA 
TEMECULA 
TEMECULA, CA 92590
(951) 697-6888
Next Century Rebar 
Subcontractor
Bill Williams
268 N Lincoln Ave Suite 16 
Corona 
Corona, CA 92882
(714) 857-7265 x92882 (714) 948-8194
NORSTAR PLUMBING AND ENGINEERING INC 
General Contractor
SUE PLUMMER
8780 19TH ST #310 
ALTA LOMA, CA 91701
(909) 481-9488
Norstar Plumbing and Engineering, Inc. 
Not Specified
Sue Plummer
8780 19th Street 
#310 
Alta Loma, CA 91701
(909) 481-9488 (909) 481-4608
O'Duffy Bros Inc 
General Contractor
nick duffy
29254 duffy street 
Romoland, CA 92585
(951) 928-0992
Onyx Paving Co. 
General Contractor
Corey Kirschner
2890 E LA Cresta Ave 
Anaheim, CA 92806
(714) 632-6699 (714) 632-1883
Paleo Solutions 
Supplier / Vendor
 Aron
911 S Primrose Ave 
Unit N 
Monrovia, CA 91016
(562) 818-7713
Philadelphia Insurance Company 
Insurance / Bonding
251 S Lake Avenue Suite 360 
Pasadena, CA 91101
(626) 639-1323
Pro-Craft Construction 
Estimating 
General Contractor
Travis Burton
500 Iowa St 
Redlands, CA 92373
(909) 790-5222
Pro-Craft Construction, Inc. 
General Contractor
500 Iowa St 
Redlands, CA 92373
(909) 709-5222
Qwest Engineering, Inc. 
General Contractor
17682 Cowan 
Suite 200 
Irvine, CA 92614
(714) 842-7778
R. Alarcon Construction Consulting 
General Contractor
Richard Alarcon
27131 Capote De Paseo # C 
San Juan Capistrano, CA 92675
(714) 271-7187 (949) 366-0055
Rock Structures Const. Co. 
Paredes 
General Contractor
Antonio Paredes
11126 Silverton Court 
Corona 
Corona, CA 92881
(951) 371-1112
Rock Structures Construction Co. 
Subcontractor
Antonio Paredes
11126 Silverton Court 
Corona, CA 92881
(951) 371-1112 (951) 278-2802
Silverstrand Constructon 
General Contractor
10065 Old Grove Rd Ste 200 
San Diego, CA 92131
(619) 368-3186
SLATER, INC. 
Subcontractor
JOE MARTIN
PO BOX 759 
FONTANA, CA 92334
(909) 822-6800
Sol Construction, Inc. 
General Contractor
231 E Alessandro Blvd #A445 
Riverside 
Riverside, CA 92508
(909) 718-9135 x92508
Sol Construction, Inc. 
General Contractor
231 E Alessandro Blvd #A445 
Riverside, CA 92508
(909) 718-9135 x92508
Southern California Builders Association 
Plan Room / Service
7740 Painter Avenue 
Suite 100 
Whittier, CA 
(562) 320-3600
Southern California Builders Association 
Plan Room / Service
7740 Painter Avenue #100 
Whittier, CA 90602
(562) 320-3600 (562) 320-3603
Southwest V-Ditch, inc. 
Subcontractor
Marty Leitzman
3625 Placentia Lane 
Riverside, CA 92501
(951) 300-2971 (951) 781-2774
Spiess Construction 
General Contractor
Barry Matchett
PO box 2849 
Santa Maria, CA 93457
(805) 937-5859 (805) 934-4432
Steve P. Rados, Inc. 
General Contractor
Debbie Edwards
2002 E McFadden Ave #200 
Santa Ana, CA 92705
(714) 835-4612 (714) 835-2186
Sukut Construction 
General Contractor
Kathie Kaiser
4010 W Chandler Avenue 
Santa Ana, CA 92704
(714) 540-5351 (714) 545-2003
SULLY-MILLER CONTRACTING COMPANY 
General Contractor
Curtis Weltz
135 SOUTH STATE COLLEGE BLVD SUITE 400 
BREA, CA 92821
(714) 578-9600 (714) 578-9672
Tensar International Corporation 
Supplier / Vendor
Louann McCain
2500 Northwinds Parkway 
Suite 500 
Alpharetta, GA 30009
(303) 589-6917
Tharsos Inc. 
General Contractor
Michael Lopez
7839 University Avenue Suite 210 
La Mesa, CA 91942
(619) 464-1261
TShayEnterprise 
Supplier / Vendor
1789 Tavern Lane 
Tacoma,, WA 98402
(253) 985-6691 (253) 985-6691
Twining, Inc. 
Riverside Branch 
Subcontractor
Alejandro Romero
111 Main Street Unit A 
Riverside, CA 92501
(909) 915-2053
Valley Cities Gonzales Fence Inc. 
Subcontractor
Dave Gonzales
1338 Sixth Street 
Norco, CA 92860
(951) 735-1145 (951) 735-9683
Vance Corporation 
General Contractor
Bruce Barrie
2271 N Locust Avenue 
Rialto, CA 92377
(909) 355-4333 (909) 355-4339
Vance Corporation 
General Contractor
2271 N Locust Avenue 
Rialto, CA 92377
(909) 355-4333
Vance Corporation 
General Contractor
Bruce Barrie
2271 N Locust Avenue 
Rialto, CA 92377
(909) 355-4333 (909) 355-4339
Varner Construction, Inc 
General Contractor
Robert Dougherty
21446 Harvill Ave Suite 1 
Perris, CA 92570
(951) 943-9933 (951) 943-8866
Veeare, Inc. 
Subcontractor
Venkat Reddy
6450 W Spring Mtn 
Santa Ana, CA 89146
(702) 609-7333 (702) 946-1444
Weaver Grading 
Subcontractor
PO Box 67 
Beaumont, CA 
Weka, Inc 
General Contractor
Jared Himle
27075 5th Street 
Highland 
Highland, CA 92346
(909) 425-8700
Weka, Inc 
General Contractor
Jared Himle
27075 5th Street 
Highland, CA 92346
(909) 425-8700