Trembley Lane Lift Station Pump Replacement/Relocation


P52635 

Project Name: Trembley Lane Lift Station Pump Replacement/Relocation
Project Type:
Engineering/Civil
Ownership: Public
Project City, State: Freedom, California
Local District: Freedom County Sanitation District
Engineer's Estimated Cost: $967,500 
Pre-Qualification for Bidders: Not Required
License Type Required: Class A
Project/Contract Number: P52635
Project Contact: Ashleigh Trujillo
County of Santa Cruz
Public Works
701 Ocean Street
Room 410
Santa Cruz, CA 95060
Tel:(831) 454-2160
Fax:(831) 454-2089
ashleigh.trujillo@santacruzcounty.us
Bid Due Date: 02/15/18 
Bid Due Time: 2:00 PM 
Project Duration: 90  Work Days
Liquidated Damages: $2,000.00 Per Calendar Day
Bid Bond Percentage: 10% 
Cost of Printed Plans & Specs: $30.00
Non-Mandatory Pre Bid Conference Date: 01/31/18 
Pre Bid Conference Time : 1:30 PM 
Pre Bid Conference Location: Trembley Lane Lift Station
on Trembley Lane off of Green Valley Road, Freedom, CA 
Project Description: This project will replace the dry pumps at the Trembley lift station with submersible pumps located in a new wet well in the Trembley Lane right-of-way. In addition to the new wet well, the project includes the construction of a valve vault, flow meter vault, gravity sewer pipes connecting to the new wet well, a new force main (replacing the existing force main in Trembley Lane), electrical conduit, and associate incidental work. The new pumps and associated equipment will connect to the existing control panel, PG&E service, and generator currently located at the project site. 
 
 Project Contacts
Civil Engineer
Civil Engineer
Freedom County Sanitation District
Ashleigh Trujillo
701 Ocean Street
Room 410
Santa Cruz, 95060
Phone: 83145421660
ashleigh.trujillo@santacruzcounty.us
   
 Docs / Specs
Register as a Document Holder to receive notifications about this opportunity.

Click on a Document Name to download.
  Document Name Document Type Size Date Submitted 
  Trembley Construction Plans-Bid Set.pdf Plans and Specifications / Other 12380.4Kb 1/19/2018 

  Trembly Specs-2018 with Appendix.pdf Plans and Specifications / Other 1659.4Kb 1/19/2018 

  Trembly LS Soils Report.pdf Addenda 7538.1Kb 1/31/2018 
  Description: Trembley Soils Report

  Results from 2/15/18 Bid Opening Plans and Specifications / Other 2537Kb 2/16/2018 
  Description: Bids shown only reflect what was submitted and not necessarily the award.

  2/15/18 Trembley Bid Results Plans and Specifications / Other 73.3Kb 2/20/2018 

 Bid Items





Currently there are no bid items posted to eBidboard for this project.




 CSI Code
  No CSI Codes Specified. 
 Q&A
Subject: Trembley Lane Lift Station Pump Replacement/Relocation "Local Compliance Statement" Posted by:Posted Anonymously
Q: Does the “Local Higher Compliance Statement” and the “Local Hire Compliance Statement Attachment: Qualifying Employee List” on pages 111 and 112 need to be completed as part of the Bid Proposal as requested on Page 125? 02/09/18
7:34:24 AM
A: No. Pages 111 and 112 will be required to be completed in full and submitted to the Engineer within one week of the project’s contract start date. 02/09/18
7:34:24 AM


Subject: Trembley Lane Lift Station Pump Replacement/Relocation "Staging Areas" Posted by:Posted Anonymously
Q: Can we use a portion of the County's Pinto Lake Park for construction staging? 02/08/18
11:44:32 AM
A: If you obtain approval by the County Parks Department, a portion of Pinto Lake Park may be available for staging. 02/08/18
11:44:32 AM


Subject: Trembley Lane Lift Station Pump Replacement/Relocation "Minimum Cover on SSFM" Posted by:Posted Anonymously
Q: What is the minimum trench depth? 02/08/18
11:34:25 AM
A: As the proposed force mains exist the wet well, a minimum of 20” of cover is called for on Sheet PS1.2. The force main shall exit the flow meter vault and as soon as possible without having a downward slope in the force main, a minimum of 3’ of cover shall be achieved. This is shown in the profile on Sheet C1.1 from approximately STA 10+20 to STA 10+85. To avoid conflicts with existing utility crossings, it seems likely that it will make the most sense to construct the proposed force main at approximately the same depth as the existing force main. Exact depth, however, will need to be determined once existing utilities are located at the time of construction. 02/08/18
11:34:25 AM


Subject: Trembley Lane Lift Station Pump Replacement/Relocation "SSFM Trench Backfill" Posted by:Posted Anonymously
Q: What is the correct detail for trench backfill? Drawing C1.1 has the following notes: a. Backfill SSFM per S-11 on DT1.1 (No S-11 on DT1.1) b. Construct new HDPE Force Main per Detail on PS1.2, DT1.1, and the project specifications (Cannot tell which detail governs) 02/08/18
11:17:36 AM
A: Regarding the SSFM construction please note the following: *On Sheet C1.1, Force Main Construction Keynote No. 1. refers generally to PS1.2, DT1.1, and the Project Specifications for construction requirements. PS1.2 shows the force main layout in plan view. DT1.1 provides trench backfill requirements for both longitudinal and cross trenches at various depths. In the Project Specifications, Section 10-1.14 "Trench Backfill" gives some information regarding the trench backfill but also notes in the first paragraph, that details shown on the plans govern. *Please replace the reference for S-11 on Sheet C1.1 with "Detail 4". The detail was renamed and this reference was not changed. Detail 4 on Sheet DT1.1 refers to Details 1 and 2, also shown on DT1.1. 02/08/18
11:17:36 AM


Subject: Trembley Lane Lift Station Pump Replacement/Relocation "PG&E Service" Posted by:Posted Anonymously
Q: Has PG&E been contact contacted about temporary service to the pump station and nearby homes? The number in the specifications is not valid. 02/08/18
11:00:58 AM
A: PG&E is aware that during construction, the service to the pump station may need to be temporarily disconnected from the pole within the existing fenced area. "Lift Station Construction Note" No. 7 on Sheet PS1.1 gives the correct number to call to coordinate the disconnection and reconnection. It is desired to not interrupt the PG&E service to the residents, but if it is unavoidable, the engineer should be notified prior to construction. Rather than calling the direct number for PG&E listed in the specifications prior to construction, 811 shall be called. 02/08/18
11:00:58 AM


Subject: Trembley Lane Lift Station Pump Replacement/Relocation "Working Days in Light of Precast Procurement Time" Posted by:Posted Anonymously
Q: Precast manufacturers are very busy. What if the working days stated in the specifications does not allow enough time to procure the precast units? 02/02/18
9:15:22 AM
A: Once the contract is awarded, if the successful bidder finds that precast companies are unable to deliver the precast units in the time required to meet the 90-working-day contract schedule, the District will verify this with the precast companies and if it is found to be true, will extend the working days in the contract. 02/02/18
9:15:22 AM


Click here for a printer friendly version of this information Printable Project Summary  
 

 Plan Holders
List Last Updated: 2018-02-15 9:24:49 AM


Organization/Division
Type
Contact Name
Address  Phone  Fax 
Alameda County Builder's Exchange 
Plan Room / Service
3055 Alvarado Street 
PO Box 1978 
San Leandro, CA 94577
(510) 483-8880 (510) 352-1509
Anderson Pacific Engineering Construction Seat 2 
General Contractor
Yvonne xxx
1390 Norman Ave 
Santa Clara, CA 95054
(408) 970-9900 (408) 213-0532
Bid America 
Plan Room / Service
41085 Elm St 
Murrieta, CA 92562
(951) 677-4819
Blue Iron, Inc. 
General Contractor
Brett Bennett
PO Box 736 
West Sacramento, CA 95691
(949) 265-5991
Builder Exchange of the Monterey Peninsula 
Plan Room / Service
343 Ocean Avenue 
Monterey, CA 93940
(831) 883-3933 (831) 582-2356
Builders Exchange of Alameda County 
Plan Room / Service
Scott Leary
3055 Alvarado Street 
San Leandro, CA 94577
(510) 483-8880 (510) 352-1509
Builders Exchange of Santa Clara County 
Plan Room / Service
Michael Miller
400 Reed Street 
Santa Clara, CA 95050
(408) 727-4000 (408) 727-2779
BUILDERS EXCHANGE OF SANTA CRUZ COUNTY 
Plan Room / Service
1248 THOMPSON AVENUE 
SANTA CRUZ, CA 95062
(831) 476-3407 (831) 476-6349
Builders Exchange of Stockton 
Plan Room / Service
7500 West Lane 
Stockton, CA 95210
(209) 320-1000 (209) 478-2132
Builders Exchange of the Central Coast 
Plan Room / Service
100 12th Street Bldg 2861 
Marina, CA 93933
(831) 883-3933 (831) 582-2356
CalBX - Federation of California Builders Exchanges 
Plan Room / Service
Jeannie Kwan
2440 Stanwell Drive Suite B 
Concord, CA 94520
(916) 277-0989
Central Coast Builders Association 
Plan Room / Service
242 East Romie Lane 
Salinas, CA 93901
(831) 758-1624 (831) 758-6203
Construction Bid Source 
Plan Room / Service
Patty Gibson
6265 HWY 9 
Felton, CA 95018
(888) 786-9450
Contra Costa Builder's Exchange 
Plan Room / Service
2440 Stanwell Drive 
Suite B 
Concord, CA 94520
(925) 685-8630 (925) 685-3424
Freitas Plus Freitas 
Construction Manager
3233 Valencia Drive 
Aptos, CA 95003
(831) 688-1168
Fresno Builders Exchange 
Plan Room / Service
1244 N Mariposa St 
Fresno, CA 93703
(559) 237-1831 (559) 264-2532
gregory equipment inc. 
General Contractor
Jess Gregory
13279 Five Gs Ln 
Redding, CA 96003
(530) 999-1933 (530) 275-7949
GSE Construction Company Inc 
General Contractor
6950 Preston Ave 
Livermore, CA 94551
(925) 447-0292 (925) 447-0962
H & R Plumbing and Drain Cleaning, Inc 
Subcontractor
Horacio Franco
4221 Appian Way 
El Sobrante, CA 94803
(510) 222-5556 (510) 222-4627
Humboldt Builders Exchange 
Other
624 C St 
FLR2 
Eureka, CA 95501-0341
(707) 442-3708 (707) 442-6051
Instrument Control Services Seat #2 
Subcontractor
Colin Caskey
6085 King Drive # 100 
Ventura, CA 93003
(805) 642-1999 (805) 642-1911
Monterey Peninsula Engineering 
General Contractor
Etheline Cimatu
192 Healy Avenue 
marina, CA 93933
(831) 384-4081 (831) 384-5078
Pacific Infrastructure 
General Contractor
Tom Jorgenson
435 boulder court 
Pleasanton, CA 94566
(925) 249-0011
Pacific Infrastructure Corp. 
General Contractor
Kristal Hartman
435 Boulder Court #200 
Pleasanton, CA 94566
(925) 249-0011 (925) 249-0009
Pacific Underground  
General Contractor
Thad  Corbett
1817 Stone Avenue 
San Jose, CA 95125
(408) 977-1655
Peninsula Builder's Exchange 
Plan Room / Service
735 Industrial Road Suite 100 
San Carlos, CA 94070
(650) 591-4486 (650) 591-8108
Placer County Builders Exchange 
Plan Room / Service
271 Auburn Ravine Road 
Auburn, CA 95603
(916) 889-3953 (916) 889-3956
Salinas Valley Builders 
Plan Room / Service
20 Quail Run Circle 
Salinas, CA 93907
(831) 758-1624 (831) 758-6203
San Francisco Builders Exchange 
Other
850 S Van Ness Ave 
San Francisco, CA 94110-1911
(415) 282-8220 (415) 821-0363
Santa Clara Builder Exchange 
Plan Room / Service
400 Reed St 
Santa Clara, CA 95050
(408) 727-4000 (408) 727-2779
Santa Cruz Builder's Exchange 
Plan Room / Service
1248 Thompson Avenue 
Santa Cruz, CA 95065
(831) 476-3407 (831) 476-6349
Small Business Exchange 
Plan Room / Service
703 Market St #1000 
San Francisco, CA 94103
(415) 778-6250 (415) 778-6255
Spiess Construction 
General Contractor
Barry Matchett
PO box 2849 
Santa Maria, CA 93457
(805) 937-5859 (805) 934-4432
The San Francisco Builders Exchange 
Plan Room 
Plan Room / Service
Deanna Johnson
850 S Van Ness Ave 
San Francisco, CA 94110
(415) 282-8220 (415) 821-0363
Valley Builders Exchange 
Plan Room / Service
Karen Bowden
1118 Kansas Ave 
PO BOX 4307 
Modesto, CA 95352
(209) 522-9031 (209) 522-0616