Pure Water Oceanside - Monitoring Well Contract


908142318715E 

Project Name: Pure Water Oceanside - Monitoring Well Contract
Project Type:
Engineering/Civil
Ownership: Public
Project City, State: Oceanside, California
Engineer's Estimated Cost: $0 to $937,500 
Pre-Qualification for Bidders: Not Required
License Type Required: Class C-57, Well Drilling Contractor
Project/Contract Number: 908142318715E
Project Contact: Adam HochPE
City of Oceanside
Water Utilities
300 N Coast Hwy
Oceanside, CA 92054
Tel:(760) 435-5800
Fax:(760) 435-5821
ahoch@hochconsulting.com
1st Advertise Date: 09/04/20 
2nd Advertise Date: 10/07/20 
Bid Due Date: 10/14/20 
Bid Due Time: 1:00 PM 
Project Duration: 120  Work Days
Liquidated Damages: $6,000.00 Per Calendar Day
Bid Bond Percentage: 10% 
Mandatory Pre Bid Conference Date: 09/23/20 
Pre Bid Conference Time : 11:00 AM 
Pre Bid Conference Location: Conference will be held via Skype,Join Skype Meeting by phone +1 (760) 435-3750,,122461#
Conference ID: 122461

Any issues connecting to the Skype meeting shall be reported to the City’s Project Manager
by 11:02 AM on Wednesday September 23rd, 2020, via e-mail at ahoch@oceansideca.org. 
Project Description: The scope of work for this contract
includes drilling, construction,
development, and testing of two to three
new monitoring wells referred to as MW-1,
MW-2 and MW-3. MW-1 shall be located on
Coco Palms Drive, approximately 550 feet
south of the intersection of Cherrystone
Street. MW-2 shall be located at Fireside
Park, near the intersection of Parkside
Drive and Fireside Street. MW-3 shall be
located on Coco Palms Drive, approximately
550 feet south of MW-1. The wells shall be
drilled using the sonic drilling method.
The sequence of construction shall be
continuous and consecutive, with final
development and testing to commence within
10 days of completion of initial
development (by airlifting and swabbing). 
City of Oceanside
 Project Contacts





Currently there is not a Project Directory for this project.




 Docs / Specs
Register as a Document Holder to receive notifications about this opportunity.

Click on a Document Name to download.
  Document Name Document Type Size Date Submitted 
  Front End Specifications - Monitoring Well Con.pdf Plans and Specifications / Other 997.7Kb 9/2/2020 
  Description: Front End Specifications - Monitoring Well

  Pure Water Oceanside Monitoring Well Plans - F.pdf Plans and Specifications / Other 4063.2Kb 9/2/2020 
  Description: Plans

  Pure Water Oceanside Monitoring Well Specifica.pdf Plans and Specifications / Other 5489.7Kb 9/2/2020 
  Description: Specifications

  2020_10 Pure Water Oceanside -Monitoring Wells.pdf Addenda 272.2Kb 10/6/2020 
  Description: Addendum 1

  Attachment 1 -Addendum 1- - Mandatory Prebid M.pdf Addenda 319.3Kb 10/6/2020 
  Description: Attachment 1 & 2

  Bid Results Plans and Specifications / Other 10.3Kb 10/15/2020 

 Bid Items

Bid List Name:  Base Bid: Bid Schedule A MW-1 Cluster * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  A1 MOBILIZATION, DEMOBILIZATION, SITE CLEAN-UP AND RESTORATION. 1 LS    
  A2 PROVIDE NOISE CONTROL MEASURES, AS SPECIFIED. 1 LS    
  A3 TESTING AND DISPOSAL OF DRILL CUTTING FROM BOREHOLES, AS REQUIRED. 2 LS    
  A4 NDPES COMPLIANCE AND REPORTING. 1 LS    
  A5 DRILL NOMINAL 7” SONIC BOREHOLE. COLLECT 6” CONTINUOUS CORE SAMPLES (DEEP COMPLETION ONLY). 185 FT    
  A6 FURNISH, INSTALL, AND REMOVE 4” SCH 80 PVC WITH 0.020 INCH HORIZONTAL MILL SLOTTED SCREEN TO TOTAL DEPTH OF BOREHOLE (DEEP COMPLETION ONLY). 185 FT    
  A7 PROVIDE GEOPHYSICAL BOREHOLE LOGS. 1 LS    
  A8 DRILL/REAM 2 BOREHOLES WITH NOMINAL 10” SONIC CASING. 260 FT    
  A9 INSTALLATION OF A 4” SCH 80 PVC GROUNDWATER MONITORING WELL. 240 FT    
  A10 FURNISH AND INSTALL CEMEX LAPIS LUSTRE #3 FILTER PACK MATERIAL AS SPECIFIED (25 TO 80 FT MW-1S AND 60 TO 175 FT MW-1D) 170 FT    
  A11 FURNISH AND INSTALL SAND/BENTONITE SEAL, AS SPECIFIED (20 TO 25 FT AND 80 TO 85 FT MW-1S; 20 TO 60 FT MW-1D) 50 FT    
  A12 FURNISH AND INSTALL 10.3 SACK CEMENT SEAL, AS SPECIFIED (0 TO 20 FT IN BOTH MW-1S AND MW-1D). 40 FT    
  A13 DEVELOP AND CLEAN WELL BY BAILING, AIRLIFTING, AND SWABBING FROM BETWEEN PACKERS (2 WELLS). 24 HR    
  A14 FURNISH, INSTALL, AND REMOVE DEVELOPMENT/TEST PUMP. 2 LS    
  A15 PROVIDE DEVELOPMENT BY PUMPING WITH SUBMERSIBLE PUMP (2 WELLS). 24 HR    
  A16 WATER QUALITY LABORATORY ANALYSIS. 2 LS    
  A17 DOWNHOLE VIDEO SURVEY. 2 LS    
  A18 FURNISH AND INSTALL 12” FLUSH MOUNTED LOCKING COVER AND CONCRETE PAD. 2 LS    
  A19 COMPLETE WELLHEAD AS DESIGNED AND FINAL TASKS. 2 LS    
   

Bid List Name:  Base Bid: Bid Schedule B MW-2 Cluster * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  B1 MOBILIZATION, MOVE BETWEEN SITES (I.E., MOVE FROM MW-1 TO MW-3), DEMOBILIZATION, SITE CLEAN‐UP AND RESTORATION. 1 LS    
  B2 PROVIDE NOISE CONTROL MEASURES, AS SPECIFIED. 1 LS    
  B3 TESTING AND DISPOSAL OF DRILL CUTTING FROM BOREHOLES, AS REQUIRED. 2 LS    
  B4 NDPES COMPLIANCE AND REPORTING. 1 LS    
  B5 DRILL NOMINAL 7” SONIC BOREHOLE. COLLECT 6” CONTINUOUS CORE SAMPLES (DEEP COMPLETION ONLY). 210 FT    
  B6 FURNISH, INSTALL, AND REMOVE 4” SCH 80 PVC WITH 0.020 INCH HORIZONTAL MILL SLOTTED SCREEN TO TOTAL DEPTH OF BOREHOLE (DEEP COMPLETION ONLY). 210 FT    
  B7 PROVIDE GEOPHYSICAL BOREHOLE LOGS. 1 LS    
  B8 DRILL/REAM 2 BOREHOLES WITH NOMINAL 10” SONIC CASING. 295 FT    
  B9 INSTALLATION OF A 4” SCH 80 PVC GROUNDWATER MONITORING WELL. 275 FT    
  B10 FURNISH AND INSTALL CEMEX LAPIS LUSTRE #3 FILTER PACK MATERIAL AS SPECIFIED (25 TO 80 FT MW-2S AND 70 TO 210 FT MW-2D) 195 FT    
  B11 FURNISH AND INSTALL SAND/BENTONITE SEAL, AS SPECIFIED (20 TO 25 FT AND 80 TO 85 FT MW-2S; 20 TO 70 FT MW-2D) 60 FT    
  B12 FURNISH AND INSTALL 10.3 SACK CEMENT SEAL, AS SPECIFIED (1 TO 20 FT IN BOTH MW-2S AND MW-2D). 38 FT    
  B13 DEVELOP AND CLEAN WELL BY BAILING, AIRLIFTING, AND SWABBING FROM BETWEEN PACKERS (2 WELLS). 24 HR    
  B14 FURNISH, INSTALL, AND REMOVE DEVELOPMENT/TEST PUMP. 2 LS    
  B15 PROVIDE DEVELOPMENT BY PUMPING WITH SUBMERSIBLE PUMP (2 WELLS). 24 HR    
  B16 WATER QUALITY LABORATORY ANALYSIS. 2 LS    
  B17 DOWNHOLE VIDEO SURVEY. 2 LS    
  B18 FURNISH AND INSTALL 12” FLUSH MOUNTED LOCKING COVER AND CONCRETE PAD. 2 LS    
  B19 COMPLETE WELLHEAD AS DESIGNED AND FINAL TASKS. 2 LS    
   

Bid List Name:  Base Bid: Bid Schedule C MW-3 Cluster * marks an allowance.   
  Item #   Item Code   Item Description   Estimated
Quantity
Unit of
Measure
 
  C1 MOBILIZATION, MOVE BETWEEN SITES (I.E., MOVE FROM MW-3 TO MW-2), DEMOBILIZATION, SITE CLEAN‐UP AND RESTORATION. 1 LS    
  C2 PROVIDE NOISE CONTROL MEASURES, AS SPECIFIED. 1 LS    
  C3 TESTING AND DISPOSAL OF DRILL CUTTING FROM BOREHOLES, AS REQUIRED. 2 LS    
  C4 NDPES COMPLIANCE AND REPORTING. 1 LS    
  C5 DRILL NOMINAL 7” SONIC BOREHOLE. COLLECT 6” CONTINUOUS CORE SAMPLES (DEEP COMPLETION ONLY). 185 FT    
  C6 FURNISH, INSTALL, AND REMOVE 4” SCH 80 PVC WITH 0.020 INCH HORIZONTAL MILL SLOTTED SCREEN TO TOTAL DEPTH OF BOREHOLE (DEEP COMPLETION ONLY). 185 FT    
  C7 PROVIDE GEOPHYSICAL BOREHOLE LOGS. 1 LS    
  C8 DRILL/REAM 2 BOREHOLES WITH NOMINAL 10” SONIC CASING. 260 FT    
  C9 INSTALLATION OF A 4” SCH 80 PVC GROUNDWATER MONITORING WELL. 240 FT    
  C10 FURNISH AND INSTALL CEMEX LAPIS LUSTRE #3 FILTER PACK MATERIAL AS SPECIFIED (25 TO 80 FT MW-3S AND 60 TO 175 FT MW-3D) 170 FT    
  C11 FURNISH AND INSTALL SAND/BENTONITE SEAL, AS SPECIFIED (20 TO 25 FT AND 80 TO 85 FT MW-3S; 20 TO 60 FT MW-3D) 50 FT    
  C12 FURNISH AND INSTALL 10.3 SACK CEMENT SEAL, AS SPECIFIED (0 TO 20 FT IN BOTH MW-3S AND MW-3D). 40 FT    
  C13 DEVELOP AND CLEAN WELL BY BAILING, AIRLIFTING, AND SWABBING FROM BETWEEN PACKERS (2 WELLS). 24 HR    
  C14 FURNISH, INSTALL, AND REMOVE DEVELOPMENT/TEST PUMP. 2 LS    
  C15 PROVIDE DEVELOPMENT BY PUMPING WITH SUBMERSIBLE PUMP (2 WELLS). 24 HR    
  C16 WATER QUALITY LABORATORY ANALYSIS. 2 LS    
  C17 DOWNHOLE VIDEO SURVEY. 2 LS    
  C18 FURNISH AND INSTALL 12” FLUSH MOUNTED LOCKING COVER AND CONCRETE PAD. 2 LS    
  C19 COMPLETE WELLHEAD AS DESIGNED AND FINAL TASKS. 2 LS    
   
 CSI Code
  No CSI Codes Specified. 
 Q&A
No questions or answers have been posted to this site.
 

 Plan Holders
List Last Updated: 2020-10-12 5:05:25 PM


Organization/Division
Type
Contact Name
Address  Phone  Fax 
ABC Liovin Drilling, Inc. 
General Contractor
Eric Miklas
1180 East Burnett Street 
Signal Hill, CA 90755
(562) 981-8575 (562) 981-9594
AGC 
Plan Room / Service
Scherrise Judge
6212 Ferris Sq 
San Diego, CA 92121
(858) 558-7444 x110 (858) 558-8444
Bid America 
Plan Room / Service
41085 Elm St 
Murrieta, CA 92562
(951) 677-4819
City of Oceanside 
Other
Lupe Walker
300 N Coast Highway 
Oceanside, CA 92054
(760) 435-5064 (760) 435-5064
City of Oceanside 
Other
Lupe Walker
300 N Coast Highway 
Oceanside, CA 92054
(760) 435-5064 (760) 435-6164
City of Oceanside 
Engineerng 
Other
Mahsima Mohammadi
300 N Coast Highway 
Oceanside, CA 92054
(760) 435-3548
Construct Connect 
Plan Room / Service
Michael Stubbs
3825 Edwards Road Suite 800 
Cincinnati, OH 45208
(800) 364-2059
Construction Bidboard 
Plan Room / Service
11622 El Camino Real Suite 100 
San Diego, CA 92130
(800) 479-5314
envirobidnet.com 
Plan Room / Service
Samantha Ayres
24123 Peachland Blvd 
Port Charlotte, FL 33954
(888) 888-0900
Jensen Drilling Company 
General Contractor
Stevie Clifford
1775 Henderson Avenue 
Eugene, OR 97403
(541) 726-7435
Jensen Drilling Company 
Clifford 
General Contractor
Stevie Clifford
1775 Henderson Avenue 
Eugene, OR 97403
(541) 726-7435
MOUNTAIN MOVERS ENGINEERING CONTRACTORS INC 
General Contractor
Ron  Demming
P O BOX 962 
SAN MARCOS, CA 92079
(760) 510-9019
Nor-Cal Pump & Well Drilling 
General Contractor
Hari Heer
1325 Barry Road 
Yuba City, CA 95993
(530) 674-5861
Nor-Cal Pump & Well Drilling 
General Contractor
Hari Heer
1325 Barry Rd 
Yuba City, CA 95993
(530) 674-5861
North America Procurement Council, Inc. PBC 
Other
Nabita Pradhan
PO Box 40445 
Grand Junction, CO 81504
(302) 450-1923
North America Procurement Council, Inc. PBC 
Other
PO Box 40445 
Grand Junction, CO 81504
(302) 450-1923
TRIECO, LLC 
HERNANDEZ 
General Contractor
CARLOS HERNANDEZ
395 ISLANDER ST 
OCEANSIDE 
OCEANSIDE, CA 92054
(714) 925-5666
Yellow Jacket Drilling Services 
Service Provider
Bryan Adams
9460 Lucas Ranch Rd 
Rancho Cucamonga 
Rancho Cucamonga, CA 91730
(909) 944-9301 x91730